Special Detailed Inspection (US) of Outer Wing Box (Holes on) Upper Half of Vertical Tee Fitting at Junction with RIB1 and Rear Spar, LH/RH
TASK 57-10-00-200-026-A
Special Detailed Inspection (US) of Outer Wing Box (Holes on) Upper Half of Vertical Tee Fitting at Junction with RIB1 and Rear Spar, LH/RH
Refer to the MPD TASK: 571185-01
SPECIAL DETAILED INSPECTION (US) OF OUTER WING BOX (HOLES ON) UPPER HALF OF VERTICAL TEE FITTING AT JUNCTION WITH RIB 1 AND REAR SPAR, LH/RH
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Referenced Information
3. Job Set-up
Subtask 57-10-00-941-069-A
Subtask 57-10-00-270-054-A
Subtask 57-10-00-390-055-A
[Rev.10 from 2021]
2026.04.02 06:30:30 UTC
Special Detailed Inspection (US) of Outer Wing Box (Holes on) Upper Half of Vertical Tee Fitting at Junction with RIB1 and Rear Spar, LH/RH
WARNING:
PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING:
DO NOT GET FUEL IN YOUR MOUTH, EYES OR ON YOUR SKIN. DO NOT BREATHE THE FUMES FROM THE FUEL. KEEP THE FUEL AWAY FROM SPARKS, FLAME AND HEAT. FUEL IS POISONOUS AND FLAMMABLE, WHICH CAN CAUSE INJURIES TO PERSONS AND DAMAGE TO EQUIPMENT.
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
CAUTION:
DO NOT APPLY TEMPORARY PROTECTION SYSTEM (TPS) ON THE INSPECTION AREA. IF YOU APPLY TPS ON THE INSPECTION AREA, YOU CAN CAUSE DAMAGE TO THE AIRCRAFT.
CAUTION:
BEFORE YOU INSTALL/REMOVE THE GSE-TOOL, READ THE INSTRUCTIONS IN THE APPLICABLE GSE INSTRUCTION MANUAL. WHILE YOU OPERATE THIS TOOL, CAREFULLY OBEY THEM. IF YOU DO NOT OBEY THE INSTRUCTIONS, DAMAGE TO EQUIPMENT CAN OCCUR.
1. Reason for the JobRefer to the MPD TASK: 571185-01
SPECIAL DETAILED INSPECTION (US) OF OUTER WING BOX (HOLES ON) UPPER HALF OF VERTICAL TEE FITTING AT JUNCTION WITH RIB 1 AND REAR SPAR, LH/RH
NOTE: The effectivity of this task is "ALL". To know if this task is applicable to your aircraft, refer to the MPD task applicability.
The information on weight variant groups is given in the MPD and SRM introductions.
2. Job Set-up InformationThe information on weight variant groups is given in the MPD and SRM introductions.
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE |
| No specific | AR | FLASHLIGHT |
| 98D27803500001 | 1 | LOCKING TOOL ZERO POS |
| 98D57004013000 | 2 | HOOK-COVER (RIB 2 SURGE DOORS) |
| 98D57004014000 | 2 | HOOK-COVER (RIB2-SURGE DOORS) |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.08BAA9) | Non Aqueous Cleaner-General - - |
| (Material No.14SBA1) | Textile-Lint free Cotton - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 540 | FUEL TANK |
| 640 | FUEL TANK |
| 540AB, 540AZ, 540BZ, 640AB, 640AZ, 640BZ |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 28-00-00-910-001-A | Fuel Safety Procedures |
| TASK 51-78-00-916-001-A | Application of Temporary Protection System (TPS) |
| TASK 57-27-11-000-001-A | Removal of the Access Panel |
| TASK 57-27-11-400-001-A | Installation of the Access Panel |
| SRM 512300 | |
| SRM 512400 | |
| SRM 514200 | |
| NTM 571185 | |
| SRM 511100 | (for corrective action) |
| SRM 512200 | (for corrective action) |
Subtask 57-10-00-941-069-A
A. Safety Precautions
(1) On FLAPS panel 114VU:
(a) Put the 98D27803500001 LOCKING TOOL ZERO POS in position on the flap/slat control lever.
(b) Put a WARNING NOTICE(S) on the flap/slat control lever to tell persons not to operate the flap/slat control lever.
(2) Obey the fuel safety precautions (Ref. AMM TASK 28-00-00-910-001).
Subtask 57-10-00-010-083-A (1) On FLAPS panel 114VU:
(a) Put the 98D27803500001 LOCKING TOOL ZERO POS in position on the flap/slat control lever.
(b) Put a WARNING NOTICE(S) on the flap/slat control lever to tell persons not to operate the flap/slat control lever.
(2) Obey the fuel safety precautions (Ref. AMM TASK 28-00-00-910-001).
B. Get Access
(1) Put an ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position in zone 540 (640).
(2) Remove the access panels (Ref. AMM TASK 57-27-11-000-001):
(3) Open the RIB2 surge doors:
(4) Install the 98D57004013000 HOOK-COVER (RIB 2 SURGE DOORS) on the forward surge doors.
(5) Install the 98D57004014000 HOOK-COVER (RIB2-SURGE DOORS) on the aft surge doors.
(6) Use a FLASHLIGHT for the inspection, if necessary.
Subtask 57-10-00-020-055-A ** ON A/C NOT FOR ALL (1) Put an ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position in zone 540 (640).
(2) Remove the access panels (Ref. AMM TASK 57-27-11-000-001):
(3) Open the RIB2 surge doors:
(4) Install the 98D57004013000 HOOK-COVER (RIB 2 SURGE DOORS) on the forward surge doors.
(5) Install the 98D57004014000 HOOK-COVER (RIB2-SURGE DOORS) on the aft surge doors.
(6) Use a FLASHLIGHT for the inspection, if necessary.
C. Removal of the Component
Upper Half of the Vertical Tee Fitting at the Junction of RIB1 and the Rear Spar of the Outer Wing Box ** ON A/C NOT FOR ALL
(1) Remove the nut to inspect the hole. Refer to the Structural Repair Manual ( SRM 514200).
Subtask 57-10-00-110-072-A
Upper Half of the Vertical Tee Fitting at the Junction of RIB1 and the Rear Spar of the Outer Wing Box ** ON A/C NOT FOR ALL D. Preparation of the Inspection Area
(1) Remove the sealant and/or paint from the inspection area if this is necessary for the Non-destructive Testing Manual (NTM) task.
(2) Make sure that the inspection area is sufficiently clean to do a satisfactory inspection of the area.
(3) If it is not sufficiently clean, clean the inspection area with Non Aqueous Cleaner-General - - (Material No.08BAA9) and Textile-Lint free Cotton - (Material No.14SBA1) .
(4) Make sure that there is no TPS layer and if there is a TPS layer, remove it (Ref. AMM TASK 51-78-00-916-001).
4. Procedure(1) Remove the sealant and/or paint from the inspection area if this is necessary for the Non-destructive Testing Manual (NTM) task.
(2) Make sure that the inspection area is sufficiently clean to do a satisfactory inspection of the area.
(3) If it is not sufficiently clean, clean the inspection area with Non Aqueous Cleaner-General - - (Material No.08BAA9) and Textile-Lint free Cotton - (Material No.14SBA1) .
(4) Make sure that there is no TPS layer and if there is a TPS layer, remove it (Ref. AMM TASK 51-78-00-916-001).
Subtask 57-10-00-270-054-A
A. Inspection
Upper Half of the Vertical Tee Fitting at the Junction of RIB1 and the Rear Spar of the Outer Wing Box ** ON A/C NOT FOR ALL
Upper Half of the Vertical Tee Fitting at the Junction of RIB1 and the Rear Spar of the Outer Wing Box ** ON A/C NOT FOR ALL
(1) Do a special detailed inspection (US) of the upper half of the vertical tee fitting, in the outer wing box for damage or discontinuities. This inspection is applicable at the junction with RIB1 and the rear spar on the left and right sides. Refer to the Non-destructive Testing Manual ( NTM 571185).
(2) Make a report of the damage after the NTM inspection:
(a) Corrosion damage:
5. Close-up
Upper Half of the Vertical Tee Fitting at the Junction of RIB1 and the Rear Spar of the Outer Wing Box ** ON A/C NOT FOR ALL
Upper Half of the Vertical Tee Fitting at the Junction of RIB1 and the Rear Spar of the Outer Wing Box ** ON A/C NOT FOR ALL (2) Make a report of the damage after the NTM inspection:
(a) Corrosion damage:
- If you find corrosion, refer to the Structural Repair Manual ( SRM 512200) for the corrosion types, inspection, removal and subsequent corrosion protection.
- If you find this type of damage, refer to the Structural Repair Manual ( SRM 511100) for the damage types, classification and corrective action.
Subtask 57-10-00-390-055-A
A. Sealant or Paint Application
(1) If the NTM procedure asked to remove the sealant and/or paint from the inspection area, apply sealant (refer to SRM 512400) or paint (refer to SRM 512300) on the inspection area.
Subtask 57-10-00-420-055-A ** ON A/C NOT FOR ALL (1) If the NTM procedure asked to remove the sealant and/or paint from the inspection area, apply sealant (refer to SRM 512400) or paint (refer to SRM 512300) on the inspection area.
B. Installation of the Component
Upper Half of the Vertical Tee Fitting at the Junction of RIB1 and the Rear Spar of the Outer Wing Box ** ON A/C NOT FOR ALL
(1) Refer to the installation drawing in the SRM identification section for the new nut references.
(2) Install the nut of the inspected hole. Refer to the Structural Repair Manual ( SRM 514200).
Subtask 57-10-00-410-083-A
Upper Half of the Vertical Tee Fitting at the Junction of RIB1 and the Rear Spar of the Outer Wing Box ** ON A/C NOT FOR ALL (2) Install the nut of the inspected hole. Refer to the Structural Repair Manual ( SRM 514200).
C. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the 98D57004014000 HOOK-COVER (RIB2-SURGE DOORS) from the aft surge doors.
(3) Remove the 98D57004013000 HOOK-COVER (RIB 2 SURGE DOORS) from the forward surge doors.
(4) Close the RIB2 surge doors:
(5) Install the access panels (Ref. AMM TASK 57-27-11-400-001):
Subtask 57-10-00-942-078-A (1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the 98D57004014000 HOOK-COVER (RIB2-SURGE DOORS) from the aft surge doors.
(3) Remove the 98D57004013000 HOOK-COVER (RIB 2 SURGE DOORS) from the forward surge doors.
(4) Close the RIB2 surge doors:
(5) Install the access panels (Ref. AMM TASK 57-27-11-400-001):
D. Aircraft Maintenance Configuration
(1) Remove the access platform(s).
(2) Remove the WARNING NOTICE(S).
(3) Remove the 98D27803500001 LOCKING TOOL ZERO POS on the flap/slat control lever.
(1) Remove the access platform(s).
(2) Remove the WARNING NOTICE(S).
(3) Remove the 98D27803500001 LOCKING TOOL ZERO POS on the flap/slat control lever.