Detailed Inspection of Center Wing Box, Rear Spar Aft Face
TASK 57-10-00-200-012-A
Detailed Inspection of Center Wing Box, Rear Spar Aft Face
Refer to the MPD TASK: 571122-01
DETAILED INSPECTION OF CENTER WING BOX, REAR SPAR AFT FACE
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Referenced Information
3. Job Set-up
Subtask 57-10-00-010-071-A
Subtask 57-10-00-220-053-A
Subtask 57-10-00-410-069-A
[Rev.10 from 2021]
2026.04.02 06:30:29 UTC
Detailed Inspection of Center Wing Box, Rear Spar Aft Face
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
1. Reason for the JobRefer to the MPD TASK: 571122-01
DETAILED INSPECTION OF CENTER WING BOX, REAR SPAR AFT FACE
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE |
| No specific | AR | FLASHLIGHT |
| No specific | AR | PAPER - MASKING |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.05RDA1) | Adhesive Film Tape-Masking - - |
| (Material No.08BAA9) | Non Aqueous Cleaner-General - - |
| (Material No.12ADB1) | Corrosion Preventive Compound-Water Displacing & Heavy Duty Hard Film - |
| (Material No.14SBA1) | Textile-Lint free Cotton - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 147 | MAIN GEAR WELL AND HYDRAULIC COMPARTMENT |
| 148 | MAIN GEAR WELL AND HYDRAULIC COMPARTMENT |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 32-12-00-010-001-A | Open the Main Gear Doors for Access |
| TASK 32-12-00-410-001-A | Close the Main Gear Doors after Access |
| TASK 51-78-00-916-001-A | Application of Temporary Protection System (TPS) |
| SRM 511100 | |
| SRM 512200 | |
Subtask 57-10-00-010-071-A
A. Get Access
(1) Open the main landing-gear doors (Ref. AMM TASK 32-12-00-010-001).
(2) Put an ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position at zone 147.
(3) Use a FLASHLIGHT for the inspection.
Subtask 57-10-00-110-050-A (1) Open the main landing-gear doors (Ref. AMM TASK 32-12-00-010-001).
(2) Put an ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position at zone 147.
(3) Use a FLASHLIGHT for the inspection.
B. Preparation of the Inspection Area
(1) Make sure that the inspection area is sufficiently clean to do a satisfactory inspection of the area.
(2) If it is not, clean the inspection area with Non Aqueous Cleaner-General - - (Material No.08BAA9) and a Textile-Lint free Cotton - (Material No.14SBA1) .
(3) If there is a Temporary Protection System (TPS) layer and if it does not let you do a satisfactory inspection, remove the TPS layer (Ref. AMM TASK 51-78-00-916-001).
4. Procedure(1) Make sure that the inspection area is sufficiently clean to do a satisfactory inspection of the area.
(2) If it is not, clean the inspection area with Non Aqueous Cleaner-General - - (Material No.08BAA9) and a Textile-Lint free Cotton - (Material No.14SBA1) .
(3) If there is a Temporary Protection System (TPS) layer and if it does not let you do a satisfactory inspection, remove the TPS layer (Ref. AMM TASK 51-78-00-916-001).
Subtask 57-10-00-220-053-A
A. Inspection
(1) Do a detailed inspection of the aft face of the rear spar of the center wing box.
(2) Make sure that there is no:
(a) Corrosion damage:
- If you find corrosion damage, refer to the Structural Repair Manual SRM 512200 for types of corrosion, inspection, removal and corrosion protection.
(b) Other damage (scratches, cracks, gouges, dents, creases):
- If you find this type of damage, refer to the Structural Repair Manual SRM 511100 for damage classification and corrective action.
Subtask 57-10-00-916-050-A (1) Do a detailed inspection of the aft face of the rear spar of the center wing box.
(2) Make sure that there is no:
(a) Corrosion damage:
- If you find corrosion damage, refer to the Structural Repair Manual SRM 512200 for types of corrosion, inspection, removal and corrosion protection.
(b) Other damage (scratches, cracks, gouges, dents, creases):
- If you find this type of damage, refer to the Structural Repair Manual SRM 511100 for damage classification and corrective action.
B. Application of Temporary Protection System
(3) If the TPS layer has local damage, remove the damaged TPS layer and apply a new layer of Corrosion Preventive Compound-Water Displacing & Heavy Duty Hard Film - (Material No.12ADB1) on the inspection area (Ref. AMM TASK 51-78-00-916-001).
(4) If, before the inspection, there was:
(5) Remove the PAPER - MASKING or the Adhesive Film Tape-Masking - - (Material No.05RDA1) .
5. Close-upCAUTION:
DO NOT APPLY TEMPORARY PROTECTION ON THE OXYGEN SYSTEMS.
MAKE SURE THAT THE TEMPORARY PROTECTION DOES NOT GET:
- ON COMPOSITE PARTS, CONTROL CABLES, PULLEYS,TEFLON BEARINGS.
- ON LUBRICATED SURFACES.
- IN DRAIN VALVES OR OTHER ORIFICES.
CAUTION:
DO NOT APPLY TEMPORARY PROTECTION SYSTEM (TPS) TYPE 3 ON THE MOVABLE COMPONENTS. USE ONLY TPS TYPE 1 GRADE 2. IF YOU DO NOT OBEY THIS INSTRUCTION, THE MECHANISMS WILL NOT OPERATE CORRECTLY.
(1) If there is a TPS layer, do a check of the condition of the TPS layer (Ref. AMM TASK 51-78-00-916-001). NOTE: Airbus recommends that you always apply a new layer of TPS. This is to make sure that the TPS layer continues to give satisfactory corrosion protection. If, after the check, you think that the TPS layer is in the correct condition, you can apply a new layer as a spray on the existing layer.
(2) Apply PAPER - MASKING or Adhesive Film Tape-Masking - - (Material No.05RDA1) on the equipment and fittings adjacent to the area. (3) If the TPS layer has local damage, remove the damaged TPS layer and apply a new layer of Corrosion Preventive Compound-Water Displacing & Heavy Duty Hard Film - (Material No.12ADB1) on the inspection area (Ref. AMM TASK 51-78-00-916-001).
(4) If, before the inspection, there was:
- Removal of the TPS layer or
- Cleaning of the inspection area with high-pressure water, steam, solvents and/or cleaning agents
(5) Remove the PAPER - MASKING or the Adhesive Film Tape-Masking - - (Material No.05RDA1) .
Subtask 57-10-00-410-069-A
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the access platform(s).
(3) Close the main landing-gear doors (Ref. AMM TASK 32-12-00-410-001).
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the access platform(s).
(3) Close the main landing-gear doors (Ref. AMM TASK 32-12-00-410-001).
Center Wing Box - Rear Spar - Aft Face