Operational Check of Rubber Flap Drain Valve at Bulk Cargo Compartment Door from Outside
TASK 53-59-00-210-002-A
Operational Check of Rubber Flap Drain Valve at Bulk Cargo Compartment Door from Outside
Refer to the MPD TASK: 535900-02
OPERATIONAL CHECK OF RUBBER FLAP DRAIN VALVE AT BULK CARGO COMPARTMENT DOOR FROM OUTSIDE
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Referenced Information
3. Job Set-up
Subtask 53-59-00-010-051-A ** ON A/C NOT FOR ALL
Subtask 53-59-00-280-050-A ** ON A/C NOT FOR ALL
Subtask 53-59-00-410-051-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.02 06:29:30 UTC
Operational Check of Rubber Flap Drain Valve at Bulk Cargo Compartment Door from Outside
ZONE: 827
1. Reason for the JobRefer to the MPD TASK: 535900-02
OPERATIONAL CHECK OF RUBBER FLAP DRAIN VALVE AT BULK CARGO COMPARTMENT DOOR FROM OUTSIDE
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE |
| No specific | 1 | PROBE DIA LESS THAN 5 MM(0.197IN)NON METALLIC FLEXIBLE |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.14SBA1) | Textile-Lint free Cotton - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 827 | BULK CARGO COMPARTMENT DOOR |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 52-30-00-860-006-A | Open the Bulk Cargo-Compartment Door |
| TASK 52-30-00-860-008-A | Close the Bulk Cargo-Compartment Door |
Subtask 53-59-00-010-051-A ** ON A/C NOT FOR ALL
A. Get Access
(1) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position.
(2) Open the BULK cargo-compartment door (Ref. AMM TASK 52-30-00-860-006).
4. Procedure(1) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position.
(2) Open the BULK cargo-compartment door (Ref. AMM TASK 52-30-00-860-006).
Subtask 53-59-00-280-050-A ** ON A/C NOT FOR ALL
A. Specified Check Procedure
(1) Clean the area around the drain hole with the Textile-Lint free Cotton - (Material No.14SBA1) .
(2) Make sure that the drain hole is not blocked.
(3) If the drain hole is blocked, you must remove the blockage.
(4) Carefully push a PROBE DIA LESS THAN 5 MM(0.197IN)NON METALLIC FLEXIBLE through the drain hole and make sure that the rubber flap moves freely.
5. Close-up(1) Clean the area around the drain hole with the Textile-Lint free Cotton - (Material No.14SBA1) .
(2) Make sure that the drain hole is not blocked.
(3) If the drain hole is blocked, you must remove the blockage.
(4) Carefully push a PROBE DIA LESS THAN 5 MM(0.197IN)NON METALLIC FLEXIBLE through the drain hole and make sure that the rubber flap moves freely.
Subtask 53-59-00-410-051-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the BULK cargo-compartment door (Ref. AMM TASK 52-30-00-860-008).
(3) Remove the access platform(s).
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the BULK cargo-compartment door (Ref. AMM TASK 52-30-00-860-008).
(3) Remove the access platform(s).
Rubber Flap Drain Valve - Bulk Cargo Compartment Door