Installation of the Maintenance Platform Panels (AFT Equipment Compartment)
TASK 53-51-17-400-001-A
Installation of the Maintenance Platform Panels (AFT Equipment Compartment)
Self Explanatory
2. Job Set-up Information
A. Consumable Materials
B. Referenced Information
3. Job Set-up
Subtask 53-51-17-860-050-A
Subtask 53-51-17-110-050-A
Subtask 53-51-17-410-050-A
[Rev.10 from 2021]
2026.04.02 06:29:28 UTC
Installation of the Maintenance Platform Panels (AFT Equipment Compartment)
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
1. Reason for the JobSelf Explanatory
2. Job Set-up Information
A. Consumable Materials
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.05TBB9) | Adhesive Tape-Slip Resistant Resilient Legacy |
| (Material No.06LCG9) | Non Hardening Jointing Putty-Medium Temp. Area - - |
| (Material No.08BAA9) | Non Aqueous Cleaner-General - - |
| (Material No.14SBA1) | Textile-Lint free Cotton - |
| REFERENCE | DESIGNATION |
|---|---|
Subtask 53-51-17-860-050-A
A. Aircraft Maintenance Configuration
(1) Make sure that the aircraft is in the same configuration as for the removal task.
4. Procedure(1) Make sure that the aircraft is in the same configuration as for the removal task.
Subtask 53-51-17-110-050-A
A. Preparation for Installation:
(1) Clean the component interface and the adjacent area with Non Aqueous Cleaner-General - - (Material No.08BAA9) and a Textile-Lint free Cotton - (Material No.14SBA1) .
(2) Make sure that the parts retained from the removed component are clean and in the correct condition.
(3) Do an inspection of the component interfaces and the adjacent area.
Subtask 53-51-17-420-050-A (1) Clean the component interface and the adjacent area with Non Aqueous Cleaner-General - - (Material No.08BAA9) and a Textile-Lint free Cotton - (Material No.14SBA1) .
(2) Make sure that the parts retained from the removed component are clean and in the correct condition.
(3) Do an inspection of the component interfaces and the adjacent area.
B. Installation of the Maintenance Platform Panels:
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Put the panels (2) in position.
(3) Apply Non Hardening Jointing Putty-Medium Temp. Area - - (Material No.06LCG9) to the screws (1).
(4) Install the screws (1).
(5) Apply Adhesive Tape-Slip Resistant Resilient Legacy (Material No.05TBB9) to the panels, if necessary.
5. Close-up(1) Make sure that the work area is clean and clear of tools and other items.
(2) Put the panels (2) in position.
(3) Apply Non Hardening Jointing Putty-Medium Temp. Area - - (Material No.06LCG9) to the screws (1).
(4) Install the screws (1).
(5) Apply Adhesive Tape-Slip Resistant Resilient Legacy (Material No.05TBB9) to the panels, if necessary.
Subtask 53-51-17-410-050-A
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the access door 312AR.
(3) Remove the access platform(s).
(4) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the access door 312AR.
(3) Remove the access platform(s).
(4) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
Maintenance Platform Panels