W DOC AIRBUS | AMM A320F

Detailed Visual Inspection of Shear Ties and Frame Clips at FR72 and FR74, between Stringer 3 and Stringer 9, LH/RH, Internal Structure


TASK 53-51-00-210-017-A
Detailed Visual Inspection of Shear Ties and Frame Clips at FR72 and FR74, between Stringer 3 and Stringer 9, LH/RH, Internal Structure


ZONE: 311
ZONE: 312
1. Reason for the Job
Refer to the MPD TASK: 535119-01
DETAILED INSPECTION OF SHEAR TIES AND FRAME CLIPS AT FR 72 AND FR 74, BETWEEN STRINGER 3 AND STRINGER 9, LH/RH, INTERNAL STRUCTURE

2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 3M (10 FT)
No specific
1
FLASHLIGHT
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.08BAA9)
Non Aqueous Cleaner-General - -
(Material No.14SBA1)
Textile-Lint free Cotton -
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
311
AFT FUSLG TAIL SECTION
312
AFT FUSLG TAIL SECTION
312AR
 D. Referenced Information
REFERENCE
DESIGNATION
SRM 530012
3. Job Set-up
Subtask 53-51-00-010-073-A
A. Get Access
WARNING: PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
  • THE FLIGHT CONTROLS
  • THE FLIGHT CONTROL SURFACES
  • THE LANDING GEAR AND THE RELATED DOORS
  • COMPONENTS THAT MOVE.
MOVEMENT OF COMPONENTS CAN KILL OR CAUSE INJURY TO PERSONS AND/OR CAN CAUSE DAMAGE TO THE EQUIPMENT.
   (1) Put the ACCESS PLATFORM 3M (10 FT) in position below the access door 312AR.
   (2) Open the access door 312AR.
   (3) Take a FLASHLIGHT to do the inspection.
Subtask 53-51-00-110-064-A
B. Cleaning Procedure
WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
   (1) Clean the inspection area with Non Aqueous Cleaner-General - - (Material No.08BAA9) and a Textile-Lint free Cotton - (Material No.14SBA1) , if necessary. Make sure the area is dry before you continue.
4. Procedure
Subtask 53-51-00-210-069-A
A. Detailed Visual Inspection Procedure
   (1) Do a detailed visual inspection of the shear ties and the frame clips at FR72 and FR74. Do this between stringer 3 and stringer 9, the LH and RH internal structure for cracks.
NOTE: If required, for information on repair procedures for cracks, refer to the ASRM frames SRM 530012.
5. Close-up
Subtask 53-51-00-410-071-A
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Close the access door 312AR.
   (3) Remove the access platform(s).
   (4) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
[Rev.10 from 2021] 2026.04.02 06:29:27 UTC