Detailed Inspection of Rear Pressure Bulkhead AFT Face, Reinforcement Splice at Forward Fin Attachment Area
TASK 53-51-00-210-014-A
Detailed Inspection of Rear Pressure Bulkhead AFT Face, Reinforcement Splice at Forward Fin Attachment Area
Refer to the MPD TASK: 535105-01
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Referenced Information
3. Job Set-up
Subtask 53-51-00-010-068-A
Subtask 53-51-00-210-066-A
Subtask 53-51-00-916-056-A
[Rev.8 from Aug 2017]
2026.04.02 06:29:27 UTC
Detailed Inspection of Rear Pressure Bulkhead AFT Face, Reinforcement Splice at Forward Fin Attachment Area
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
1. Reason for the JobNOTE: The effectivity of this task is ALL. To know, if this task is applicable for your aircraft, refer to the MPD task applicability and the weight variant data given in the SRM introduction.
2. Job Set-up InformationA. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 3M (10 FT) |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.08BAA9) | Non Aqueous Cleaner-General - - |
| (Material No.12ABB1) | Corrosion Preventive Compound-Water Displacing Hard Film - |
| (Material No.12ABC1) | Corrosion Preventive Compound-Water Displacing Soft Film - |
| (Material No.14SBA1) | Textile-Lint free Cotton - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 311 | AFT FUSLG TAIL SECTION |
| 312 | AFT FUSLG TAIL SECTION |
| 312AR |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 51-75-13-916-001-A | Repair to a layer of Moisture-Removing Oil |
| SRM 535116 | (for corrective action) |
Subtask 53-51-00-010-068-A
A. Get Access
(2) Open the access door 312AR.
Subtask 53-51-00-110-080-A WARNING:
PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
(1) Put the ACCESS PLATFORM 3M (10 FT) in position below the access door 312AR. - THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
(2) Open the access door 312AR.
B. Preparation of the Inspection Area
(1) Make sure that the inspection area is sufficiently clean to do a satisfactory inspection of the area.
(3) Make sure that the inspection area is dry before you continue.
4. Procedure(1) Make sure that the inspection area is sufficiently clean to do a satisfactory inspection of the area.
WARNING:
OBEY THE MANUFACTURER'S INSTRUCTIONS WHEN YOU USE THIS/THESE MATERIAL/S.
USE PROTECTIVE CLOTHING, RUBBER GLOVES, GOGGLES AND A MASK.
WARNING:
MAKE SURE THAT THERE IS A GOOD FLOW OF AIR THROUGH THE WORK AREA WHEN YOU USE SPECIAL MATERIALS.
IF YOU GET ONE OF THESE MATERIALS ON YOUR SKIN, IN YOUR MOUTH OR IN YOUR EYES:
(2) If necessary, clean the inspection area with the Non Aqueous Cleaner-General - - (Material No.08BAA9) and a Textile-Lint free Cotton - (Material No.14SBA1) . - FLUSH IT AWAY WITH A FLOW OF CLEAN WATER FOR BETWEEN 10 AND 15 MINUTES.
- GET IMMEDIATE MEDICAL AID IF IRRITATION OCCURS.
(3) Make sure that the inspection area is dry before you continue.
Subtask 53-51-00-210-066-A
A. Detailed Inspection
(1) Do a detailed inspection of the reinforcement splice of the AFT face of the rear pressure bulkhead at the forward fin attachment. Look for cracks.
5. Close-up(1) Do a detailed inspection of the reinforcement splice of the AFT face of the rear pressure bulkhead at the forward fin attachment. Look for cracks.
NOTE: If necessary, refer to the ASRM SRM 535116 for the correct repair procedure.
Subtask 53-51-00-916-056-A
A. Apply Corrosion Preventive Compound-Water Displacing Soft Film - (Material No.12ABC1) or Corrosion Preventive Compound-Water Displacing Hard Film - (Material No.12ABB1) to the inspection area (Ref. AMM TASK 51-75-13-916-001).
Subtask 53-51-00-410-066-A B. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the access door 312AR.
(3) Remove the access platform(s).
(4) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the access door 312AR.
(3) Remove the access platform(s).
(4) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
Reinforcement Splice of the Rear Pressure Bulkhead at the Fin Forward Attachment