Removal of the Drain Valves
TASK 53-49-21-000-001-A
Removal of the Drain Valves
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Referenced Information
3. Job Set-up
Subtask 53-49-21-010-050-A
Subtask 53-49-21-020-050-A
[Rev.10 from 2021]
2026.04.02 07:24:48 UTC
Removal of the Drain Valves
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) |
| No specific | 1 | SCRAPER - NON METALLIC |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.08BAA9) | Non Aqueous Cleaner-General - - |
| (Material No.14SBA1) | Textile-Lint free Cotton - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 826 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 25-80-00-000-001-A | Removal of the Insulation Blankets |
| TASK 52-30-00-860-001-A | Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
| TASK 53-42-14-000-001-A | Removal of the Aft Cargo-Compartment Floor-Panels Zone 150 |
| SRM 514211 | |
Subtask 53-49-21-010-050-A
A. Get Access
(1) Put the ACCESS PLATFORM 2M (6 FT) in position at aft cargo-compartment door 826.
(2) Open aft cargo-compartment door 826 (Ref. AMM TASK 52-30-00-860-001).
(3) In the aft cargo compartment, remove the applicable floor panels (Ref. AMM TASK 53-42-14-000-001).
(4) Remove the insulation blankets as necessary (Ref. AMM TASK 25-80-00-000-001).
4. Procedure(1) Put the ACCESS PLATFORM 2M (6 FT) in position at aft cargo-compartment door 826.
(2) Open aft cargo-compartment door 826 (Ref. AMM TASK 52-30-00-860-001).
(3) In the aft cargo compartment, remove the applicable floor panels (Ref. AMM TASK 53-42-14-000-001).
(4) Remove the insulation blankets as necessary (Ref. AMM TASK 25-80-00-000-001).
Subtask 53-49-21-020-050-A
A. Removal of the Drain Valve
(1) Remove the drain valve (5) from the valve retainer (3).
(2) Remove the sealant with Non Aqueous Cleaner-General - - (Material No.08BAA9) , the Textile-Lint free Cotton - (Material No.14SBA1) and the SCRAPER - NON METALLIC from the collars (1).
(3) Remove and discard the collars (1) and the pins (4) (refer to SRM 514211).
(4) Remove the strap (2).
(5) Remove the valve retainer (3).
(1) Remove the drain valve (5) from the valve retainer (3).
(2) Remove the sealant with Non Aqueous Cleaner-General - - (Material No.08BAA9) , the Textile-Lint free Cotton - (Material No.14SBA1) and the SCRAPER - NON METALLIC from the collars (1).
(3) Remove and discard the collars (1) and the pins (4) (refer to SRM 514211).
(4) Remove the strap (2).
(5) Remove the valve retainer (3).
Drain Valve