W DOC AIRBUS | AMM A320F

Removal of the Automatic Direction Finder 2 (ADF2) Antenna Cover


TASK 53-41-61-000-801-A
Removal of the Automatic Direction Finder 2 (ADF2) Antenna Cover


WARNING: BEFORE YOU START WORK, YOU MUST PUT ON A SAFETY HARNESS AND ATTACH IT TO THE ACCESS PLATFORM. WITHOUT A SAFETY HARNESS, YOU CAN FALL. THIS CAN KILL YOU OR CAUSE YOU INJURY.
WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
ZONE: 250
1. Reason for the Job
Self Explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE
No specific
AR
CAP - BLANKING
No specific
1
SCRAPER - NON METALLIC
No specific
1
TAPE - MASKING
98L12003001000
AR
HARNESS,SAFETY
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
250
AFT PASSENGER COMPARTMENT
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
3. Job Set-up
Subtask 53-41-61-860-051-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
Subtask 53-41-61-010-050-A ** ON A/C NOT FOR ALL
B. Get Access
   (1) Put on and attach the HARNESS, SAFETY before you start work in the work area.
   (2) Put the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE in position in front of the ADF2 antenna cover, at zone 250.
4. Procedure
Subtask 53-41-61-020-050-A ** ON A/C NOT FOR ALL
A. Removal of the ADF2 Antenna Cover
   (1) Remove the sealant with the SCRAPER - NON METALLIC from the cover (2) and the fuselage structure (3).
   (2) Remove the screws (1), (6) and (7) from the cover (2).
   (3) Lift the cover (2) and disconnect the electrical connector (4) from the dummy receptacle (5). At the same time, make sure that the electrical connector (4) does not fall into the fuselage structure (3).
   (4) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
   (5) Safety the electrical connector (4) to the fuselage structure (3) with TAPE - MASKING.
[Rev.10 from 2021] 2026.04.02 07:25:25 UTC