Special Detailed Inspection (ROTO) of the Rivet Holes in the Butt Joint Splice-Plate FR 47.3 from STGR 10 to STGR 12, Internal Surface, LH/RH
TASK 53-41-00-220-820-A
Special Detailed Inspection (ROTO) of the Rivet Holes in the Butt Joint Splice-Plate FR 47.3 from STGR 10 to STGR 12, Internal Surface, LH/RH
Refer to the MPD TASK: 534184-01
SPECIAL DETAILED INSPECTION (ROTO) OF RIVET HOLES IN BUTT JOINT SPLICE PLATE FR C47.3 FROM STRINGER 10 TO STRINGER 12, INTERNAL SURFACE, LH/RH.
A. Consumable Materials
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 53-41-00-010-213-A
Subtask 53-41-00-220-099-A
Subtask 53-41-00-410-209-A
[Rev.10 from 2021]
2026.04.02 06:29:20 UTC
Special Detailed Inspection (ROTO) of the Rivet Holes in the Butt Joint Splice-Plate FR 47.3 from STGR 10 to STGR 12, Internal Surface, LH/RH
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
ZONE: 250
1. Reason for the JobRefer to the MPD TASK: 534184-01
SPECIAL DETAILED INSPECTION (ROTO) OF RIVET HOLES IN BUTT JOINT SPLICE PLATE FR C47.3 FROM STRINGER 10 TO STRINGER 12, INTERNAL SURFACE, LH/RH.
NOTE: The effectivity of this task is ALL. To know, if this task is applicable for your aircraft, refer to the MPD task applicability and the weight variant data given in the SRM introduction.
2. Job Set-up InformationA. Consumable Materials
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.08BAA9) | Non Aqueous Cleaner-General - - |
| (Material No.14SBA1) | Textile-Lint free Cotton - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 250 | AFT PASSENGER COMPARTMENT |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 25-23-47-000-010-A | Removal of the Door Frame Linings of the Left/Right Aft Emergency Exit Doors from Zones 251/252 |
| TASK 25-23-47-400-010-A | Installation of the Door Frame Linings of the Left/Right Aft Emergency Exit Doors in Zones 251/252 |
| TASK 25-80-00-000-001-A | Removal of the Insulation Blankets |
| TASK 25-80-00-400-001-A | Installation of the Insulation Blankets |
| TASK 52-22-00-010-001-A | Opening of the Emergency Exit Doors from the Passenger Compartment |
| TASK 52-22-00-410-001-A | Closing of the Emergency Exit Doors from the Passenger Compartment |
| SRM 511100 | |
| SRM 512200 | |
| SRM 514211 | |
| NTM 534184 | |
| SRM 51730000 | (for corrective action) |
| SRM 51740000 | (for corrective action) |
| SRM 53001202 | (for corrective action) |
Subtask 53-41-00-010-213-A
A. Get Access
(1) Open the applicable emergency exit doors (Ref. AMM TASK 52-22-00-010-001).
(2) Remove the applicable door frame linings (Ref. AMM TASK 25-23-47-000-010).
(3) Remove the applicable insulation blankets (Ref. AMM TASK 25-80-00-000-001).
(4) Remove the fasteners from the inspection area SRM 514211.
Subtask 53-41-00-110-174-A (1) Open the applicable emergency exit doors (Ref. AMM TASK 52-22-00-010-001).
(2) Remove the applicable door frame linings (Ref. AMM TASK 25-23-47-000-010).
(3) Remove the applicable insulation blankets (Ref. AMM TASK 25-80-00-000-001).
(4) Remove the fasteners from the inspection area SRM 514211.
B. Preparation of the Inspection Area
(1) Make sure that the inspection areas are sufficiently clean to do a satisfactory inspection.
(3) Make sure that the inspection areas are dry before you continue.
4. Procedure(1) Make sure that the inspection areas are sufficiently clean to do a satisfactory inspection.
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
(2) If not, clean the inspection area with Non Aqueous Cleaner-General - - (Material No.08BAA9) and a Textile-Lint free Cotton - (Material No.14SBA1) . (3) Make sure that the inspection areas are dry before you continue.
Subtask 53-41-00-220-099-A
A. Special Detailed Inspection
(1) Do the special detailed inspection (ROTO) of the rivet holes in the splice plate of the butt joint at FR 47.3. Do this between STGR 10 and STGR 12, internal surface, LH/RH, NTM 534184.
(2) Write a report if you find damage during the inspection procedure.
(3) If you find damage:
(a) Refer to the ASRM SRM 511100 for the class of damage.
(b) If you find corrosion damage:
5. Close-up(1) Do the special detailed inspection (ROTO) of the rivet holes in the splice plate of the butt joint at FR 47.3. Do this between STGR 10 and STGR 12, internal surface, LH/RH, NTM 534184.
(2) Write a report if you find damage during the inspection procedure.
(3) If you find damage:
(a) Refer to the ASRM SRM 511100 for the class of damage.
(b) If you find corrosion damage:
- Refer to the ASRM SRM 512200 for the general corrosion data
- Refer to the ASRM SRM 51740000 for the repair of the corroded areas.
- Refer to the ASRM SRM 51730000 for the repair of the minor damage
- Refer to the ASRM SRM 53001202 for the correct repair procedure.
Subtask 53-41-00-410-209-A
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the fasteners in the inspection area SRM 514211.
(3) Install the applicable insulation blankets (Ref. AMM TASK 25-80-00-400-001).
(4) Install the applicable door frame linings (Ref. AMM TASK 25-23-47-400-010).
(5) Close the applicable emergency exit doors (Ref. AMM TASK 52-22-00-410-001).
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the fasteners in the inspection area SRM 514211.
(3) Install the applicable insulation blankets (Ref. AMM TASK 25-80-00-400-001).
(4) Install the applicable door frame linings (Ref. AMM TASK 25-23-47-400-010).
(5) Close the applicable emergency exit doors (Ref. AMM TASK 52-22-00-410-001).
Inspection Areas of the Splice Plate of the Butt Joint at FR 47.3, from STGR 10 to STGR 12