Detailed Inspection of Skin in Circumferential Splice at FR70, between STGR10, LH/RH and Crown Center Line, including Cutout Corners for Fin
TASK 53-41-00-210-018-A
Detailed Inspection of Skin in Circumferential Splice at FR70, between STGR10, LH/RH and Crown Center Line, including Cutout Corners for Fin
Refer to the MPD TASK: 534110-01
A. Consumable Materials
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 53-41-00-010-091-A
Subtask 53-41-00-210-074-A
Subtask 53-41-00-410-092-A
[Rev.8 from Aug 2017]
2026.04.02 06:29:22 UTC
Detailed Inspection of Skin in Circumferential Splice at FR70, between STGR10, LH/RH and Crown Center Line, including Cutout Corners for Fin
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
1. Reason for the JobNOTE: The effectivity of this task is ALL. To know, if this task is applicable for your aircraft, refer to the MPD task applicability and the weight variant data given in the SRM introduction.
2. Job Set-up InformationA. Consumable Materials
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.08BAA9) | Non Aqueous Cleaner-General - - |
| (Material No.14SBA1) | Textile-Lint free Cotton - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 200 | UPPER HALF FUSELAGE |
| 323 | VERTICAL STABILIZER SPAR BOX |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 53-55-11-000-001-A | Removal of the Vertical Stabilizer Fairings |
| TASK 53-55-11-400-001-A | Installation of the Vertical Stabilizer Fairings |
| SRM 53411101 | (for corrective action) |
Subtask 53-41-00-010-091-A
A. Get Access
Subtask 53-41-00-110-164-A WARNING:
PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
(1) Remove the vertical stabilizer fairings 323AL and 323AR (Ref. AMM TASK 53-55-11-000-001). - THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
B. Preparation of the Inspection Area
(1) Make sure that the inspection area is sufficiently clean to do a satisfactory inspection of the area.
(2) If not, clean the inspection area with Non Aqueous Cleaner-General - - (Material No.08BAA9) and a Textile-Lint free Cotton - (Material No.14SBA1) .
(3) Make sure that the inspection areas are dry before you continue.
4. Procedure(1) Make sure that the inspection area is sufficiently clean to do a satisfactory inspection of the area.
(2) If not, clean the inspection area with Non Aqueous Cleaner-General - - (Material No.08BAA9) and a Textile-Lint free Cotton - (Material No.14SBA1) .
(3) Make sure that the inspection areas are dry before you continue.
Subtask 53-41-00-210-074-A
A. Detailed Inspection
(1) Do a detailed inspection of the fuselage skin in the circumferential splice at FR70, including cutout corners for fin attachments external surface. Do this from STGR10 LH/RH to crown center line. Look for:
5. Close-up(1) Do a detailed inspection of the fuselage skin in the circumferential splice at FR70, including cutout corners for fin attachments external surface. Do this from STGR10 LH/RH to crown center line. Look for:
- Cracks.
NOTE: If necessary, refer to the ASRM SRM 53411101 for the correct repair procedure.
Subtask 53-41-00-410-092-A
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the vertical stabilizer fairings 323AL and 323AR (Ref. AMM TASK 53-55-11-400-001).
(3) Remove the WARNING NOTICE(S).
(4) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the vertical stabilizer fairings 323AL and 323AR (Ref. AMM TASK 53-55-11-400-001).
(3) Remove the WARNING NOTICE(S).
(4) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
Circumferential Skin Splice at FR70