1. Reason for the Job
Refer to the MPD TASK: 533139-03
DETAILED INSPECTION OF FRAME FLANGES AT FR 38 AND FR 39 AND AT FR 40 AND FR 41 BETWEEN STRINGER 12 AND STRINGER 21, LH/RH.
NOTE: The effectivity of this task is "ALL". To know if this task is applicable to your aircraft, refer to the MPD task applicability.
2. Job Set-up Information
 A. Consumable Materials
REFERENCE
DESIGNATION
(Material No.08BAA9)
Non Aqueous Cleaner-General - -
(Material No.14SBA1)
Textile-Lint free Cotton -
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
241
CENTER PASSENGER COMPARTMENT
242
CENTER PASSENGER COMPARTMENT
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 21-20-00-010-001-A
Removal of the Air-Conditioning Distribution Ducts
TASK 21-20-00-410-001-A
Installation of the Air-Conditioning Distribution Ducts
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
TASK 24-42-00-862-001-A
De-energize the Ground Service Network Supplied from the External Power
TASK 25-23-47-000-002-A
Removal of the Upper Sidewall Panel Assy 241LW, (242LW), 241CW, (242CW) and 241FW, (242FW)
TASK 25-23-47-400-002-A
Installation of the Upper Sidewall Panel Assy 241LW, (242LW), 241CW, (242CW) and 241FW, (242FW)
TASK 25-23-48-000-001-A
Removal of the Cove Light Panel
TASK 25-23-48-400-001-A
Installation of the Cove Light Panel
TASK 25-80-00-000-001-A
Removal of the Insulation Blankets
TASK 25-80-00-400-001-A
Installation of the Insulation Blankets
TASK 52-21-11-000-001-A
Removal of the Emergency Exit Hatch
TASK 52-21-11-400-001-A
Installation of the Emergency Exit Hatch
SRM 511100
SRM 512200
3. Job Set-up
Subtask 53-31-00-861-073-A
A. Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
Subtask 53-31-00-010-152-B
B. Get Access
   (1) Remove the emergency exit hatches (Ref. AMM TASK 52-21-11-000-001) and/or (Ref. AMM D/O 52-21-11-00).
   (2) Remove the upper sidewall panels (Ref. AMM TASK 25-23-47-000-002).
   (3) Remove the cove light panels (Ref. AMM TASK 25-23-48-000-001).
   (4) Remove the air-conditioning distribution ducts as necessary (Ref. AMM TASK 21-20-00-010-001).
   (5) Remove the applicable insulation blankets (Ref. AMM TASK 25-80-00-000-001).
Subtask 53-31-00-110-155-A
C. Preparation of the Inspection Area
   (1) Make sure that the inspection area is sufficiently clean to do a satisfactory inspection of the area.
   (2) If not, clean the inspection area with Non Aqueous Cleaner-General - - (Material No.08BAA9) and the Textile-Lint free Cotton - (Material No.14SBA1) .
4. Procedure
Subtask 53-31-00-210-118-B
A. Inspection
   (1) Do a detailed inspection of the frame flanges at FR38, FR39, FR40 and FR41 for damage or discontinuities. Do this inspection between left stringers 12 and 21 and right stringers 12 and 21.
   (2) Make sure that there is no:
     (a) Corrosion damage:
If you find corrosion, refer to the Structural Repair Manual ( SRM 512200) for the corrosion types, inspection, removal and subsequent corrosion protection.
     (b) Other damage (scratches, cracks, gouges, dents, creases):
If you find this type of damage, refer to the Structural Repair Manual ( SRM 511100) for the damage types, classification and corrective action.
5. Close-up
Subtask 53-31-00-410-149-B
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Install the removed insulation blankets (Ref. AMM TASK 25-80-00-400-001).
   (3) Install the removed air-conditioning distribution ducts (Ref. AMM TASK 21-20-00-410-001).
   (4) Install the removed cove light panels (Ref. AMM TASK 25-23-48-400-001).
   (5) Install the removed upper sidewall panels (Ref. AMM TASK 25-23-47-400-002).
   (6) Install the removed emergency exit hatches (Ref. AMM TASK 52-21-11-400-001) and/or (Ref. AMM D/O 52-21-11-40).
Subtask 53-31-00-862-069-A
B. De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).