Special Detailed Inspection (LFEC) of Angle Fitting Forward Attachment at FR36 at STGR30 LH/RH
TASK 53-31-00-220-807-A
Special Detailed Inspection (LFEC) of Angle Fitting Forward Attachment at FR36 at STGR30 LH/RH
Refer to the MPD TASK: 533189-01
SPECIAL DETAILED INSPECTION (LFEC) OF ANGLE FITTING FORWARD ATTACHMENT, AT FR 36 AT STRINGER 30, LH/RH
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Referenced Information
3. Job Set-up
Subtask 53-31-00-010-127-A
Subtask 53-31-00-220-071-A
Subtask 53-31-00-370-064-A
[Rev.10 from 2021]
2026.04.02 06:29:07 UTC
Special Detailed Inspection (LFEC) of Angle Fitting Forward Attachment at FR36 at STGR30 LH/RH
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
1. Reason for the JobRefer to the MPD TASK: 533189-01
SPECIAL DETAILED INSPECTION (LFEC) OF ANGLE FITTING FORWARD ATTACHMENT, AT FR 36 AT STRINGER 30, LH/RH
NOTE: The effectivity of this task is ALL. To know if this task is applicable to your aircraft, refer to the MPD task applicability and the weight variant data given in the SRM introduction.
2. Job Set-up InformationA. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE |
| No specific | 1 | CLOTH-EMERY (GRADE 280) |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.08BBB1) | Non Aqueous Cleaner-- Petroleum Based - |
| (Material No.14SBA1) | Textile-Lint free Cotton - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 191 | AIR CONDITIONING COMPT AND FAIRINGS |
| 192 | AIR CONDITIONING COMPT AND FAIRINGS |
| 191BT, 192BT |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 51-75-12-300-001-A | Repair of Major Paint Damage on Light Alloy and Composite Material |
| TASK 51-75-12-300-003-A | Repair of Minor Paint Damage (Topcoat Only) |
| TASK 53-35-11-000-001-A | Removal of the Wing-to-Fuselage Fairings |
| TASK 53-35-11-400-001-A | Installation of the Wing-to-Fuselage Fairings |
| SRM 511100 | |
| SRM 512200 | |
| SRM 517300 | |
| SRM 517400 | |
| NTM 533189 | |
Subtask 53-31-00-010-127-A
A. Get Access
(1) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position.
(2) Remove the wing-to-fuselage fairings (Ref. AMM TASK 53-35-11-000-001):
Subtask 53-31-00-860-091-A (1) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position.
(2) Remove the wing-to-fuselage fairings (Ref. AMM TASK 53-35-11-000-001):
B. Prepare the Inspection Area
(1) If necessary, clean the inspection area with Non Aqueous Cleaner-- Petroleum Based - (Material No.08BBB1) and a lint-free cotton cloth Textile-Lint free Cotton - (Material No.14SBA1) .
(2) Make sure that the inspection areas are clean and dry before you continue.
(3) Do a visual check of the inspection area for damage or discontinuities.
(4) If necessary, make the surface of the inspection areas smooth with CLOTH-EMERY (GRADE 280).
(5) Do a visual inspection of the surfaces of the inspection areas. Look for damage and defects in the shape of the surfaces.
(6) If you find damage:
(a) Refer to the ASRM SRM 511100 for the classification of the damage.
(b) If you find corrosion damage:
4. Procedure(1) If necessary, clean the inspection area with Non Aqueous Cleaner-- Petroleum Based - (Material No.08BBB1) and a lint-free cotton cloth Textile-Lint free Cotton - (Material No.14SBA1) .
(2) Make sure that the inspection areas are clean and dry before you continue.
(3) Do a visual check of the inspection area for damage or discontinuities.
(4) If necessary, make the surface of the inspection areas smooth with CLOTH-EMERY (GRADE 280).
(5) Do a visual inspection of the surfaces of the inspection areas. Look for damage and defects in the shape of the surfaces.
(6) If you find damage:
(a) Refer to the ASRM SRM 511100 for the classification of the damage.
(b) If you find corrosion damage:
- Refer to the ASRM SRM 512200 for the general corrosion data
- Refer to the ASRM SRM 517400 for the repair of the corroded areas.
Subtask 53-31-00-220-071-A
A. Special Detailed Inspection
(1) Do the special detailed inspection of the forward attachment of the angle fittings at FR36 at STGR30, LH/RH, NTM 533189.
(a) Refer to the SRM 511100 for the classification of the damage.
(b) If you find corrosion damage:
5. Close-up(1) Do the special detailed inspection of the forward attachment of the angle fittings at FR36 at STGR30, LH/RH, NTM 533189.
NOTE: If the inspection areas are painted, before you do the inspection you must:
(2) Make a report of damage during the inspection procedure: - Refer to the procedure steps in the NTM 533189, 'Preparation for Inspection'
- Measure the thickness of the paint at the inspection areas
- Make sure that the paint thickness is less than the given limit.
(a) Refer to the SRM 511100 for the classification of the damage.
(b) If you find corrosion damage:
- Refer to the SRM 512200 for the general corrosion data
- Refer to the SRM 517400 for the repair of the corroded areas.
- Refer to the SRM 517300 for the repair of minor damage.
Subtask 53-31-00-370-064-A
A. Repair of the Surface Protection
(1) If necessary, repair the paint coating in the inspection area (Ref. AMM TASK 51-75-12-300-003) or (Ref. AMM TASK 51-75-12-300-001).
Subtask 53-31-00-410-124-A (1) If necessary, repair the paint coating in the inspection area (Ref. AMM TASK 51-75-12-300-003) or (Ref. AMM TASK 51-75-12-300-001).
B. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the wing-to-fuselage fairings (Ref. AMM TASK 53-35-11-400-001):
(3) Remove the access platform(s).
(4) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the wing-to-fuselage fairings (Ref. AMM TASK 53-35-11-400-001):
(3) Remove the access platform(s).
(4) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
Angle Fittings of Forward Attachment at FR36 STGR30 LH/RH