W DOC AIRBUS | AMM A320F

Detailed Inspection of Skin around Anti-Collision Light Cutout, between FR40 and FR41 and between Stringer 1, LH/RH, External Surface


TASK 53-31-00-210-010-A
Detailed Inspection of Skin around Anti-Collision Light Cutout, between FR40 and FR41 and between Stringer 1, LH/RH, External Surface


WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
ZONE: 200
1. Reason for the Job
Refer to the MPD TASK: 533130-01
DETAILED INSPECTION OF SKIN AROUND ANTI COLLISION LIGHT CUTOUT, BETWEEN FR 40 AND FR 41 AND BETWEEN STRINGER 1, LH/RH, EXTERNAL SURFACE
NOTE: The effectivity of this task is ALL. To know, if this task is applicable for your aircraft, refer to the MPD task applicability and the weight variant data given in the SRM introduction.
2. Job Set-up Information
 A. Consumable Materials
REFERENCE
DESIGNATION
(Material No.08BAA9)
Non Aqueous Cleaner-General - -
(Material No.14SBA1)
Textile-Lint free Cotton -
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
200
UPPER HALF FUSELAGE
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 33-48-11-000-001-A
Removal of the Upper Beacon/Strobe Light from the Outside of the Fuselage
TASK 33-48-11-400-001-A
Installation of the Upper Beacon/Strobe Light from the Outside of the Fuselage
SRM 53311101
(for corrective action)
3. Job Set-up
Subtask 53-31-00-010-060-A
A. Get Access
   (1) Remove the upper beacon (Ref. AMM TASK 33-48-11-000-001).
Subtask 53-31-00-110-137-A
B. Preparation of the Inspection Area
   (1) Make sure that the inspection area is sufficiently clean to do a satisfactory inspection of the area.
   (2) If not, clean the inspection area with Non Aqueous Cleaner-General - - (Material No.08BAA9) and a Textile-Lint free Cotton - (Material No.14SBA1) .
   (3) Make sure that the inspection areas are dry before you continue.
4. Procedure
Subtask 53-31-00-210-059-A
A. Detailed Inspection:
   (1) Do a detailed inspection of the area around the anti-collision light cutout between FR40 and FR41 and STGR1 LH to STGR1 RH. Look for:
  • corrosion,
  • cracks.
NOTE: If necessary, refer to the ASRM SRM 53311101 for the correct repair procedure.
5. Close-up
Subtask 53-31-00-410-060-A
A. Close Access
   (1) Install the upper beacon (Ref. AMM TASK 33-48-11-400-001).
   (2) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
[Rev.10 from 2021] 2026.04.02 06:29:04 UTC