1. Reason for the Job
Refer to the MPD TASK: 533105-01
DETAILED INSPECTION OF MLG BAY FUSELAGE SIDE PANELS INSIDE MLG BAY, BETWEEN FR 42 AND FR 46, INCLUDING SLANTED FRAMES AND SIDE BOX, LH/RH
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
No specific
AR
SAFETY BARRIER(S)
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
No specific
2
WARNING NOTICE(S)
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.08BBB1)
Non Aqueous Cleaner-- Petroleum Based -
(Material No.14SBA1)
Textile-Lint free Cotton -
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
147
MAIN GEAR WELL AND HYDRAULIC COMPARTMENT
148
MAIN GEAR WELL AND HYDRAULIC COMPARTMENT
 D. Referenced Information
REFERENCE
DESIGNATION
TASK 29-10-00-863-001-A
Pressurize the Green Hydraulic System with a Hydraulic Ground Power-Cart
TASK 29-10-00-863-002-A
Pressurize the Yellow Hydraulic System with a Hydraulic Ground Power-Cart
TASK 29-10-00-863-003-A
Pressurize the Blue Hydraulic System with a Hydraulic Ground Power-Cart
TASK 29-10-00-863-003-A-01
Pressurize the Blue Hydraulic System with the Blue Electric Pump
TASK 29-10-00-864-001-A
Depressurize the Green Hydraulic System
TASK 29-10-00-864-002-A
Depressurize the Yellow Hydraulic System
TASK 29-10-00-864-003-A
Depressurize the Blue Hydraulic System
TASK 29-23-00-863-001-A
Pressurize the Green Hydraulic System from the Yellow Hydraulic System through the PTU with the Electric Pump
TASK 32-00-00-481-001-A
Installation of the Safety Devices on the Landing Gears
TASK 32-12-00-010-001-A
Open the Main Gear Doors for Access
TASK 32-12-00-410-001-A
Close the Main Gear Doors after Access
SRM 53312900
(for corrective action)
3. Job Set-up
Subtask 53-31-00-941-067-A
A. Safety Precautions
   (1) As necessary, use the applicable SAFETY BARRIERS, specified by the operator's instructions and your local regulations.
   (2) Make sure that the ground safety locks are installed on the landing gear (Ref. AMM TASK 32-00-00-481-001).
   (3) On the panel 400VU:
  • make sure that the landing-gear control-lever 6GA is in the DOWN position
  • put a WARNING NOTICE(S) in position to tell persons not to operate the landing gear and the MLG doors.
Subtask 53-31-00-010-052-A
B. Get Access
   (1) Open the MLG doors (Ref. AMM TASK 32-12-00-010-001).
   (2) Depressurize the Green, Blue and Yellow hydraulic systems (Ref. AMM TASK 29-10-00-864-001), (Ref. AMM TASK 29-10-00-864-002), (Ref. AMM TASK 29-10-00-864-003).
   (3) Put the WARNING NOTICE(S) in position to tell persons not to operate the landing gear.
   (4) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position.
Subtask 53-31-00-110-104-A
C. Preparation of the Inspection Area
   (1) Carefully clean the inboard face of the MLG bay side-panels with Non Aqueous Cleaner-- Petroleum Based - (Material No.08BBB1) and a clean lint-free cloth Textile-Lint free Cotton - (Material No.14SBA1) .
Subtask 53-31-00-865-052-A
D. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
49VUL/G/LGCIU/SYS1/NORM1GAC09
121VUHYDRAULIC/LGCIU/SYS22GAQ35
121VUHYDRAULIC/LGCIU/SYS1/GRND SPLY52GAQ34
4. Procedure
Subtask 53-31-00-210-052-A
A. Inspection:
   (1) Examine the inboard face of the MLG bay side-panels, slanted frames and side boxes between FR42 and FR46 for:
  • cracks,
  • corrosion,
NOTE: If necessary, refer to the ASRM SRM 53312900 for the correct repair procedure.
5. Close-up
Subtask 53-31-00-865-053-A
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
49VUL/G/LGCIU/SYS1/NORM1GAC09
121VUHYDRAULIC/LGCIU/SYS22GAQ35
121VUHYDRAULIC/LGCIU/SYS1/GRND SPLY52GAQ34
Subtask 53-31-00-410-052-A
B. Close Access
   (1) Pressurize the Green, Blue and Yellow hydraulic systems (Ref. AMM TASK 29-23-00-863-001) or (Ref. AMM TASK 29-10-00-863-001), (Ref. AMM TASK 29-10-00-863-002), (Ref. AMM TASK 29-10-00-863-003).
   (2) Close the MLG door (Ref. AMM TASK 32-12-00-410-001).
   (3) Remove the access platform(s).
Subtask 53-31-00-942-080-A
C. Removal of Equipment
   (1) Remove the safety barriers.
   (2) Remove the WARNING NOTICE(S).