Special Detailed Inspection (HFEC and US) of Fuselage External Structure, Longitudinal Joint at STR 6 from FR 35 to FR 35.8, LH/RH
TASK 53-21-00-250-813-A
Special Detailed Inspection (HFEC and US) of Fuselage External Structure, Longitudinal Joint at STR 6 from FR 35 to FR 35.8, LH/RH
Refer to the ALI TASK: 532197-01
SPECIAL DETAILED INSPECTION (HFEC AND US) OF FUSELAGE EXTERNAL STRUCTURE, LONGITUDINAL JOINT AT STR 6 FROM FR 35 TO FR 35.8, LH/RH
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Referenced Information
3. Job Set-up
Subtask 53-21-00-010-137-A ** ON A/C NOT FOR ALL
Subtask 53-21-00-270-050-A ** ON A/C NOT FOR ALL
Subtask 53-21-00-410-131-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.02 06:29:00 UTC
Special Detailed Inspection (HFEC and US) of Fuselage External Structure, Longitudinal Joint at STR 6 from FR 35 to FR 35.8, LH/RH
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
1. Reason for the JobRefer to the ALI TASK: 532197-01
SPECIAL DETAILED INSPECTION (HFEC AND US) OF FUSELAGE EXTERNAL STRUCTURE, LONGITUDINAL JOINT AT STR 6 FROM FR 35 TO FR 35.8, LH/RH
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 6M (20 FT) |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.08BAA9) | Non Aqueous Cleaner-General - - |
| (Material No.14SBA1) | Textile-Lint free Cotton - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 231 | FWD PASSENGER COMPARTMENT |
| 232 | FWD PASSENGER COMPARTMENT |
| REFERENCE | DESIGNATION |
|---|---|
| NTM 532197 | |
| SRM 511100 | (for corrective action) |
| SRM 512200 | (for corrective action) |
| SRM 512300 | (for corrective action) |
| SRM 512400 | (for corrective action) |
Subtask 53-21-00-010-137-A ** ON A/C NOT FOR ALL
A. Get Access
(1) Put the ACCESS PLATFORM 6M (20 FT) in position at zone 231 (232).
Subtask 53-21-00-110-156-A ** ON A/C NOT FOR ALL (1) Put the ACCESS PLATFORM 6M (20 FT) in position at zone 231 (232).
B. Preparation of the Inspection Area
(1) Make sure that the inspection area is sufficiently clean to do a satisfactory inspection of the area.
(2) If not, clean the inspection area with Non Aqueous Cleaner-General - - (Material No.08BAA9) and the Textile-Lint free Cotton - (Material No.14SBA1) .
(3) Remove the sealant and/or paint from the inspection area if this is necessary to do the Nondestructive Testing Manual (NTM) task.
4. Procedure(1) Make sure that the inspection area is sufficiently clean to do a satisfactory inspection of the area.
(2) If not, clean the inspection area with Non Aqueous Cleaner-General - - (Material No.08BAA9) and the Textile-Lint free Cotton - (Material No.14SBA1) .
(3) Remove the sealant and/or paint from the inspection area if this is necessary to do the Nondestructive Testing Manual (NTM) task.
Subtask 53-21-00-270-050-A ** ON A/C NOT FOR ALL
A. Inspection
(1) Do a special detailed inspection of the left and right longitudinal joint at stringer 6 (in the fuselage external structure) for damage and discontinuities. This inspection includes the area from FR35 to FR35.8. Refer to NTM 532197.
(2) Make a report of the damage after the NTM inspection:
(a) Corrosion damage:
If you find corrosion, refer to the Structural Repair Manual (Ref. SRM 512200) for the corrosion types, inspection, removal and subsequent corrosion protection.
(b) Other damage (scratches, cracks, gouges, dents, creases):
If you find this type of damage, refer to the Structural Repair Manual (Ref. SRM 511100) for the damage types, classification and corrective action.
Subtask 53-21-00-916-083-A ** ON A/C NOT FOR ALL (1) Do a special detailed inspection of the left and right longitudinal joint at stringer 6 (in the fuselage external structure) for damage and discontinuities. This inspection includes the area from FR35 to FR35.8. Refer to NTM 532197.
(2) Make a report of the damage after the NTM inspection:
(a) Corrosion damage:
If you find corrosion, refer to the Structural Repair Manual (Ref. SRM 512200) for the corrosion types, inspection, removal and subsequent corrosion protection.
(b) Other damage (scratches, cracks, gouges, dents, creases):
If you find this type of damage, refer to the Structural Repair Manual (Ref. SRM 511100) for the damage types, classification and corrective action.
B. Sealant or paint application
(1) If the NTM procedure told to remove the sealant and/or paint from the inspection area, apply sealant (refer to SRM 512400) or paint (refer to SRM 512300) on the inspection area.
5. Close-up(1) If the NTM procedure told to remove the sealant and/or paint from the inspection area, apply sealant (refer to SRM 512400) or paint (refer to SRM 512300) on the inspection area.
Subtask 53-21-00-410-131-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the access platform(s).
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the access platform(s).
Fuselage External Structure, Left and Right Longitudinal Joint at Stringer 6, from FR35 to FR35.8