Special Detailed Inspection (ROTO) of Fuselage Internal Structure, Junction between Frame and Cargo Floor Beam at STR 38 from FR35.0 to FR35.7, LH/RH
TASK 53-21-00-250-811-A
Special Detailed Inspection (ROTO) of Fuselage Internal Structure, Junction between Frame and Cargo Floor Beam at STR 38 from FR35.0 to FR35.7, LH/RH
Refer to the ALI TASK: 532203-01
SPECIAL DETAILED INSPECTION (ROTO) OF FUSELAGE INTERNAL STRUCTURE, JUNCTION BETWEEN FRAME AND CARGO FLOOR BEAM AT STR 38 FROM FR 35 TO FR 35.7, LH/RH.
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Referenced Information
3. Job Set-up
Subtask 53-21-00-010-133-A ** ON A/C NOT FOR ALL
Subtask 53-21-00-250-066-A ** ON A/C NOT FOR ALL
Subtask 53-21-00-410-127-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.02 06:28:59 UTC
Special Detailed Inspection (ROTO) of Fuselage Internal Structure, Junction between Frame and Cargo Floor Beam at STR 38 from FR35.0 to FR35.7, LH/RH
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
ZONE: 130
1. Reason for the JobRefer to the ALI TASK: 532203-01
SPECIAL DETAILED INSPECTION (ROTO) OF FUSELAGE INTERNAL STRUCTURE, JUNCTION BETWEEN FRAME AND CARGO FLOOR BEAM AT STR 38 FROM FR 35 TO FR 35.7, LH/RH.
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 2M (6 FT) |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.08BAA9) | Non Aqueous Cleaner-General - - |
| (Material No.12ABC1) | Corrosion Preventive Compound_Water Displacing Soft Film - |
| (Material No.14SBA1) | Textile-Lint free Cotton - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 130 | FWD CARGO COMPT AFT BULKHEAD OF AVNCS COMPT TO FWD PRESSURE BULKHEAD OF WING CENTER BOX |
| 825 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 25-80-00-000-001-A | Removal of the Insulation Blankets |
| TASK 25-80-00-400-001-A | Installation of the Insulation Blankets |
| TASK 51-78-00-916-001-A | Application of Temporary Protection System (TPS) |
| TASK 52-30-00-860-001-A | Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
| TASK 52-30-00-860-002-A | Close the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
| TASK 53-22-14-000-001-A | Removal of the Forward Cargo-Compartment Floor-Panels |
| TASK 53-22-14-400-001-A | Installation of the Forward Cargo-Compartment Floor-Panels |
| TASK 53-22-14-400-001-A-01 | Installation of the Forward Cargo-Compartment Floor-Panels (Alternative Installation Procedure with the Skyflex Option) |
| SRM 514200 | |
| NTM 532203 | |
| SRM 511100 | (for corrective action) |
| SRM 512200 | (for corrective action) |
| SRM 512300 | (for corrective action) |
| SRM 512400 | (for corrective action) |
Subtask 53-21-00-010-133-A ** ON A/C NOT FOR ALL
A. Get Access
(1) Put the ACCESS PLATFORM 2M (6 FT) in position at zone 825.
(2) Open forward cargo-compartment door 825 (Ref. AMM TASK 52-30-00-860-001).
(3) Remove the necessary cargo floor panels between FR35.0 and FR35.7 to get access to the inspection area (Ref. AMM TASK 53-22-14-000-001).
(4) Remove the necessary insulation blankets between FR35.0 and FR35.7 to get access to the inspection area (Ref. AMM TASK 25-80-00-000-001).
Subtask 53-21-00-110-153-A ** ON A/C NOT FOR ALL (1) Put the ACCESS PLATFORM 2M (6 FT) in position at zone 825.
(2) Open forward cargo-compartment door 825 (Ref. AMM TASK 52-30-00-860-001).
(3) Remove the necessary cargo floor panels between FR35.0 and FR35.7 to get access to the inspection area (Ref. AMM TASK 53-22-14-000-001).
(4) Remove the necessary insulation blankets between FR35.0 and FR35.7 to get access to the inspection area (Ref. AMM TASK 25-80-00-000-001).
B. Preparation of the Inspection Area
(1) Make sure that the inspection area is sufficiently clean to do a satisfactory inspection of the area.
(2) If not, clean the inspection area with Non Aqueous Cleaner-General - - (Material No.08BAA9) and a Textile-Lint free Cotton - (Material No.14SBA1) .
(3) If there is a TPS layer and if it does not let you do a satisfactory inspection, remove the TPS layer (Ref. AMM TASK 51-78-00-916-001).
(4) Remove the sealant and/or paint from the inspection area if this is necessary for the Non-destructive Testing Manual (NTM) task.
(5) Remove the fasteners to inspect the holes ( SRM 514200).
4. Procedure(1) Make sure that the inspection area is sufficiently clean to do a satisfactory inspection of the area.
(2) If not, clean the inspection area with Non Aqueous Cleaner-General - - (Material No.08BAA9) and a Textile-Lint free Cotton - (Material No.14SBA1) .
(3) If there is a TPS layer and if it does not let you do a satisfactory inspection, remove the TPS layer (Ref. AMM TASK 51-78-00-916-001).
(4) Remove the sealant and/or paint from the inspection area if this is necessary for the Non-destructive Testing Manual (NTM) task.
(5) Remove the fasteners to inspect the holes ( SRM 514200).
Subtask 53-21-00-250-066-A ** ON A/C NOT FOR ALL
A. Inspection
(1) Do a special detailed inspection of the junction between the frame and the cargo floor beam. This inspection is applicable at stringer 38, from FR35.0 to FR35.7, left and right sides, for damage or discontinuities. Refer to NTM 532203.
(2) Make a report of the damage after the NTM inspection:
(a) Corrosion damage:
If you find corrosion, refer to the Structural Repair Manual ( SRM 512200) for the corrosion types, inspection, removal and subsequent corrosion protection.
(b) Other damage (scratches, cracks, gouges, dents, creases):
If you find this type of damage, refer to the Structural Repair Manual ( SRM 511100) for the damage types, classification and corrective action.
Subtask 53-21-00-390-055-A ** ON A/C NOT FOR ALL (1) Do a special detailed inspection of the junction between the frame and the cargo floor beam. This inspection is applicable at stringer 38, from FR35.0 to FR35.7, left and right sides, for damage or discontinuities. Refer to NTM 532203.
(2) Make a report of the damage after the NTM inspection:
(a) Corrosion damage:
If you find corrosion, refer to the Structural Repair Manual ( SRM 512200) for the corrosion types, inspection, removal and subsequent corrosion protection.
(b) Other damage (scratches, cracks, gouges, dents, creases):
If you find this type of damage, refer to the Structural Repair Manual ( SRM 511100) for the damage types, classification and corrective action.
B. Installation of Fasteners
(1) Refer to the installation drawing in the SRM identification section for the new fastener references.
(2) Install the fasteners of the inspected holes (SRM 514200).
Subtask 53-21-00-910-053-A ** ON A/C NOT FOR ALL (1) Refer to the installation drawing in the SRM identification section for the new fastener references.
(2) Install the fasteners of the inspected holes (SRM 514200).
C. Sealant or Paint Application
(1) If the NTM procedure asked to remove the sealant and/or paint from the inspection area, apply sealant ( SRM 512400) or paint ( SRM 512300) on the inspection area.
Subtask 53-21-00-916-080-A ** ON A/C NOT FOR ALL (1) If the NTM procedure asked to remove the sealant and/or paint from the inspection area, apply sealant ( SRM 512400) or paint ( SRM 512300) on the inspection area.
D. Check and Application of the TPS Layer
(1) If the TPS was removed at the "Preparation of the Inspection Area", apply a new layer of Corrosion Preventive Compound_Water Displacing Soft Film - (Material No.12ABC1) (Ref. AMM TASK 51-78-00-916-001).
(2) If the TPS was not removed at the "Preparation of the Inspection Area", do a check of the condition and integrity of the TPS layer (Ref. AMM TASK 51-78-00-916-001).
(3) If the TPS layer has local damage, remove the damaged TPS layer and apply a new layer of Corrosion Preventive Compound_Water Displacing Soft Film - (Material No.12ABC1) (Ref. AMM TASK 51-78-00-916-001).
5. Close-up(1) If the TPS was removed at the "Preparation of the Inspection Area", apply a new layer of Corrosion Preventive Compound_Water Displacing Soft Film - (Material No.12ABC1) (Ref. AMM TASK 51-78-00-916-001).
(2) If the TPS was not removed at the "Preparation of the Inspection Area", do a check of the condition and integrity of the TPS layer (Ref. AMM TASK 51-78-00-916-001).
(3) If the TPS layer has local damage, remove the damaged TPS layer and apply a new layer of Corrosion Preventive Compound_Water Displacing Soft Film - (Material No.12ABC1) (Ref. AMM TASK 51-78-00-916-001).
NOTE: If, after the check of the condition and integrity, the TPS layer is in the correct condition, Airbus recommends that you apply a new layer as a spray on the existing layer. This is to make sure that the TPS layer continues to give satisfactory corrosion protection.
Subtask 53-21-00-410-127-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the removed insulation blankets between FR35.0 and FR35.7 (Ref. AMM TASK 25-80-00-400-001).
(3) Install the removed cargo floor panels between FR35.0 and FR35.7 (Ref. AMM TASK 53-22-14-400-001).
(4) Close forward cargo-compartment door 825 (Ref. AMM TASK 52-30-00-860-002).
(5) Remove the access platform(s).
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the removed insulation blankets between FR35.0 and FR35.7 (Ref. AMM TASK 25-80-00-400-001).
(3) Install the removed cargo floor panels between FR35.0 and FR35.7 (Ref. AMM TASK 53-22-14-400-001).
(4) Close forward cargo-compartment door 825 (Ref. AMM TASK 52-30-00-860-002).
(5) Remove the access platform(s).
Frame at the Cargo-Floor Beam Junction from FR35.0 to FR35.7 (Left and Right Sides)