W DOC AIRBUS | AMM A320F

Special Detailed Inspection (ROTO) of Triform Fitting at FR 35.2, LH/RH


TASK 53-21-00-250-807-A
Special Detailed Inspection (ROTO) of Triform Fitting at FR 35.2, LH/RH


WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
CAUTION: DO NOT APPLY TEMPORARY PROTECTION SYSTEM (TPS) ON THE INSPECTION AREA. IF YOU APPLY TPS ON THE INSPECTION AREA, YOU CAN CAUSE DAMAGE TO THE AIRCRAFT.
ZONE: 130
1. Reason for the Job
Refer to the MPD TASK: 532199-02
SPECIAL DETAILED INSPECTION (ROTO) OF TRIFORM FITTING AT FR 35.2, LH/RH.
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
No specific
AR
FLASHLIGHT
No specific
AR
MIRROR - INSPECTION
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.08BAA9)
Non Aqueous Cleaner-General - -
(Material No.14SBA1)
Textile-Lint free Cotton -
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
130
FWD CARGO COMPT AFT BULKHEAD OF AVNCS COMPT TO FWD PRESSURE BULKHEAD OF WING CENTER BOX
825
 D. Referenced Information
REFERENCE
DESIGNATION
TASK 25-54-12-000-003-A
Removal of the Sidewall Panels in the Forward Cargo Compartment
TASK 25-54-12-400-003-A
Installation of the Sidewall Panels in the Forward Cargo Compartment
TASK 25-80-00-000-001-A
Removal of the Insulation Blankets
TASK 25-80-00-400-001-A
Installation of the Insulation Blankets
TASK 51-78-00-916-001-A
Application of Temporary Protection System (TPS)
TASK 52-30-00-860-001-A
Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump
TASK 52-30-00-860-002-A
Close the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump
TASK 53-22-14-000-001-A
Removal of the Forward Cargo-Compartment Floor-Panels
TASK 53-22-14-400-001-A
Installation of the Forward Cargo-Compartment Floor-Panels
TASK 53-22-14-400-001-A-01
Installation of the Forward Cargo-Compartment Floor-Panels (Alternative Installation Procedure with the Skyflex Option)
SRM 512300
SRM 512400
SRM 514200
NTM 532199
SRM 511100
(for corrective action)
SRM 512200
(for corrective action)
3. Job Set-up
Subtask 53-21-00-010-127-A ** ON A/C NOT FOR ALL
A. Get Access
   (1) Put an ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position in zone 132.
   (2) Open the forward cargo-compartment door 825 (Ref. AMM TASK 52-30-00-860-001).
   (3) Remove the necessary sidewall panels at FR35.2 to get access to the inspection area (Ref. AMM TASK 25-54-12-000-003).
   (4) Remove the necessary floor panels at FR35.2 to get access to the inspection area (Ref. AMM TASK 53-22-14-000-001).
   (5) If necessary, move the wiring harnesses with their related supports away from the structure but do not disconnect them. This is to get access to the inspection area.
   (6) Remove the necessary insulation blankets at FR35.2 to get access to the inspection area (Ref. AMM TASK 25-80-00-000-001).
Subtask 53-21-00-110-147-A ** ON A/C NOT FOR ALL
B. Preparation of the Inspection Area
   (1) Remove the fasteners to inspect the holes. Refer to the Structural Repair Manual ( SRM 514200).
   (2) Remove the sealant and/or paint from the inspection area if this is necessary for the Non-destructive Testing Manual (NTM) task.
   (3) Make sure that the inspection area is sufficiently clean to do a satisfactory inspection of the area.
   (4) If it is not sufficiently clean, clean the inspection area with Non Aqueous Cleaner-General - - (Material No.08BAA9) and Textile-Lint free Cotton - (Material No.14SBA1) .
   (5) Make sure that there is no TPS layer and if there is a TPS layer, remove it (Ref. AMM TASK 51-78-00-916-001).
   (6) Use a FLASHLIGHT and a MIRROR - INSPECTION for the inspection, if necessary.
4. Procedure
Subtask 53-21-00-250-064-A ** ON A/C NOT FOR ALL
A. Inspection
   (1) Do a special detailed inspection (ROTO) of the triform fitting at FR35.2 for damage or discontinuities. Do this inspection on the left and right sides. Refer to the Non-destructive Testing Manual ( NTM 532199).
   (2) Make a report of the damage after the NTM inspection:
     (a) Corrosion damage:
  • If you find corrosion, refer to the Structural Repair Manual ( SRM 512200) for the corrosion types, inspection, removal and subsequent corrosion protection.
     (b) Other damage (scratches, cracks, gouges, dents, creases):
  • If you find this type of damage, refer to the Structural Repair Manual ( SRM 511100) for the damage types, classification and corrective action.
5. Close-up
Subtask 53-21-00-390-052-A ** ON A/C NOT FOR ALL
A. Sealant or Paint Application
   (1) If the NTM procedure asked to remove the sealant and/or paint from the inspection area, apply sealant (refer to SRM 512400) or paint (refer to SRM 512300) on the inspection area.
Subtask 53-21-00-420-065-A ** ON A/C NOT FOR ALL
B. Installation of the Components
   (1) Refer to the installation drawing in the SRM identification section for the new fastener references.
   (2) Install the fasteners of the inspected holes. Refer to the Structural Repair Manual ( SRM 514200).
Subtask 53-21-00-410-121-A ** ON A/C NOT FOR ALL
C. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Install the insulation blankets at FR35.2 (Ref. AMM TASK 25-80-00-400-001).
   (3) If moved away, put the wiring harnesses with their related supports in their correct position on the structure.
   (4) Install the floor panels at FR35.2 (Ref. AMM TASK 53-22-14-400-001).
   (5) Install the sidewall panels at FR35.2 (Ref. AMM TASK 25-54-12-400-003).
   (6) Close forward cargo-compartment door 825 (Ref. AMM TASK 52-30-00-860-002).
   (7) Remove the access platform(s).