Detailed Inspection of Cabin Floor Beam Junction at FR 35.1 and FR 35.2, LH/RH
TASK 53-21-00-220-811-A
Detailed Inspection of Cabin Floor Beam Junction at FR 35.1 and FR 35.2, LH/RH
Refer to the MPD TASK: 532147-01
DETAILED INSPECTION OF CABIN FLOOR BEAM JUNCTION AT FR 35.1 AND FR 35.2, LH/RH.
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Referenced Information
3. Job Set-up
Subtask 53-21-00-010-128-A ** ON A/C NOT FOR ALL
Subtask 53-21-00-220-103-A ** ON A/C NOT FOR ALL
Subtask 53-21-00-410-122-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.02 06:28:59 UTC
Detailed Inspection of Cabin Floor Beam Junction at FR 35.1 and FR 35.2, LH/RH
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
CAUTION:
DO NOT APPLY TEMPORARY PROTECTION SYSTEM (TPS) ON THE INSPECTION AREA. IF YOU APPLY TPS ON THE INSPECTION AREA, YOU CAN CAUSE DAMAGE TO THE AIRCRAFT.
ZONE: 130
1. Reason for the JobRefer to the MPD TASK: 532147-01
DETAILED INSPECTION OF CABIN FLOOR BEAM JUNCTION AT FR 35.1 AND FR 35.2, LH/RH.
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE |
| No specific | AR | FLASHLIGHT |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.08BAA9) | Non Aqueous Cleaner-General - - |
| (Material No.14SBA1) | Textile-Lint free Cotton - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 130 | FWD CARGO COMPT AFT BULKHEAD OF AVNCS COMPT TO FWD PRESSURE BULKHEAD OF WING CENTER BOX |
| 825 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 25-54-12-000-002-A | Removal of the Ceiling Panels in the Forward Cargo Compartment |
| TASK 25-54-12-000-003-A | Removal of the Sidewall Panels in the Forward Cargo Compartment |
| TASK 25-54-12-400-002-A | Installation of the Ceiling Panels in the Forward Cargo Compartment |
| TASK 25-54-12-400-003-A | Installation of the Sidewall Panels in the Forward Cargo Compartment |
| TASK 25-80-00-000-001-A | Removal of the Insulation Blankets |
| TASK 25-80-00-400-001-A | Installation of the Insulation Blankets |
| TASK 51-78-00-916-001-A | Application of Temporary Protection System (TPS) |
| TASK 52-30-00-860-001-A | Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
| TASK 52-30-00-860-002-A | Close the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
| SRM 511100 | (for corrective action) |
| SRM 512200 | (for corrective action) |
Subtask 53-21-00-010-128-A ** ON A/C NOT FOR ALL
A. Get Access
(1) Put an ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position in zone 132.
(2) Open the forward cargo-compartment door 825 (Ref. AMM TASK 52-30-00-860-001).
(3) Remove the necessary sidewall panels between FR35.1 and FR35.2 to get access to the inspection areas (Ref. AMM TASK 25-54-12-000-003).
(4) Remove the necessary ceiling panels between FR35.1 and FR35.2 to get access to the inspection areas (Ref. AMM TASK 25-54-12-000-002).
(5) If necessary, move the wiring harnesses with their related supports away from the structure but do not disconnect them. This is to get access to the inspection area.
(6) Remove the necessary insulation blankets between FR35.1 and FR35.2 to get access to the inspection areas (Ref. AMM TASK 25-80-00-000-001).
Subtask 53-21-00-110-148-A ** ON A/C NOT FOR ALL (1) Put an ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position in zone 132.
(2) Open the forward cargo-compartment door 825 (Ref. AMM TASK 52-30-00-860-001).
(3) Remove the necessary sidewall panels between FR35.1 and FR35.2 to get access to the inspection areas (Ref. AMM TASK 25-54-12-000-003).
(4) Remove the necessary ceiling panels between FR35.1 and FR35.2 to get access to the inspection areas (Ref. AMM TASK 25-54-12-000-002).
(5) If necessary, move the wiring harnesses with their related supports away from the structure but do not disconnect them. This is to get access to the inspection area.
(6) Remove the necessary insulation blankets between FR35.1 and FR35.2 to get access to the inspection areas (Ref. AMM TASK 25-80-00-000-001).
B. Preparation of the Inspection Area
(1) Make sure that the inspection area is sufficiently clean to do a satisfactory inspection of the area.
(2) If it is not sufficiently clean, clean the inspection area with Non Aqueous Cleaner-General - - (Material No.08BAA9) and Textile-Lint free Cotton - (Material No.14SBA1) .
(3) Make sure that there is no TPS layer and if there is a TPS layer, remove it (Ref. AMM TASK 51-78-00-916-001).
(4) Use a FLASHLIGHT for the inspection, if necessary.
4. Procedure(1) Make sure that the inspection area is sufficiently clean to do a satisfactory inspection of the area.
(2) If it is not sufficiently clean, clean the inspection area with Non Aqueous Cleaner-General - - (Material No.08BAA9) and Textile-Lint free Cotton - (Material No.14SBA1) .
(3) Make sure that there is no TPS layer and if there is a TPS layer, remove it (Ref. AMM TASK 51-78-00-916-001).
(4) Use a FLASHLIGHT for the inspection, if necessary.
Subtask 53-21-00-220-103-A ** ON A/C NOT FOR ALL
A. Inspection
(1) Do a detailed inspection of the junction of the cabin floor beams for damage or discontinuities. This inspection is applicable at FR35.1 and FR35.2 on the left and right sides.
(2) Make sure that there is no:
(a) Corrosion damage:
5. Close-up(1) Do a detailed inspection of the junction of the cabin floor beams for damage or discontinuities. This inspection is applicable at FR35.1 and FR35.2 on the left and right sides.
(2) Make sure that there is no:
(a) Corrosion damage:
- If you find corrosion, refer to the Structural Repair Manual ( SRM 512200) for the corrosion types, inspection, removal and subsequent corrosion protection.
- If you find this type of damage, refer to the Structural Repair Manual ( SRM 511100) for the damage types, classification and corrective action.
Subtask 53-21-00-410-122-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the insulation blankets between FR35.1 and FR35.2 (Ref. AMM TASK 25-80-00-400-001).
(3) If moved away, put the wiring harnesses with their related supports in their correct position on the structure.
(4) Install the ceiling panels between FR35.1 and FR35.2 (Ref. AMM TASK 25-54-12-400-002).
(5) Install the sidewall panels between FR35.1 and FR35.2 (Ref. AMM TASK 25-54-12-400-003).
(6) Close the forward cargo-compartment door 825 (Ref. AMM TASK 52-30-00-860-002).
(7) Remove the access platform(s).
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the insulation blankets between FR35.1 and FR35.2 (Ref. AMM TASK 25-80-00-400-001).
(3) If moved away, put the wiring harnesses with their related supports in their correct position on the structure.
(4) Install the ceiling panels between FR35.1 and FR35.2 (Ref. AMM TASK 25-54-12-400-002).
(5) Install the sidewall panels between FR35.1 and FR35.2 (Ref. AMM TASK 25-54-12-400-003).
(6) Close the forward cargo-compartment door 825 (Ref. AMM TASK 52-30-00-860-002).
(7) Remove the access platform(s).
Junction of the Cabin Floor Beam at FR35.1 and FR35.2, Left and Right Sides