W DOC AIRBUS | AMM A320F

Detailed Inspection of Cabin Floor Structure, below and 0.5M around Galleys and Toilets (if Installed) and Emergency Exit Entrance Area, between FR 24 and FR 35.8


TASK 53-21-00-220-804-A
Detailed Inspection of Cabin Floor Structure, below and 0.5M around Galleys and Toilets (if Installed) and Emergency Exit Entrance Area, between FR 24 and FR 35.8


WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
ZONE: 231
ZONE: 232
1. Reason for the Job
Refer to the MPD TASK: 532105-02
DETAILED INSPECTION OF CABIN FLOOR STRUCTURE, BELOW AND 0.5M AROUND GALLEYS AND TOILETS (IF INSTALLED) AND EMERGENCY EXIT ENTRANCE AREA, BETWEEN FR 24 AND FR 35.8.
2. Job Set-up Information
 A. Consumable Materials
REFERENCE
DESIGNATION
(Material No.08BAA9)
Non Aqueous Cleaner-General - -
(Material No.12ABB1)
Corrosion Preventive Compound-Water Displacing Hard Film -
(Material No.12ABC1)
Corrosion Preventive Compound_Water Displacing Soft Film -
(Material No.14SBA1)
Textile-Lint free Cotton -
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
231
FWD PASSENGER COMPARTMENT
232
FWD PASSENGER COMPARTMENT
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 51-78-00-916-001-A
Application of Temporary Protection System (TPS)
TASK 53-22-12-000-001-A
Removal of the Cabin Floor Panels
TASK 53-22-12-400-001-A
Installation of the Cabin Floor Panels
SRM 511100
(for corrective action)
SRM 512200
(for corrective action)
TASK 25-30-00-00
BUFFET AND GALLEY - DESCRIPTION AND OPERATION
TASK 25-40-00-00
LAVATORIES - DESCRIPTION AND OPERATION
3. Job Set-up
Subtask 53-21-00-010-109-A ** ON A/C NOT FOR ALL
A. Get Access
   (1) If installed, remove the galleys and the lavatories between FR24 and FR35.8. To do this, refer to the paragraph Component Location in the applicable ATA 25 Description/Operation:
In this paragraph, you will find the cross-references of the removal/installation tasks.
   (2) Remove the necessary cabin floor panels between FR24 and FR35.8 to get access to the inspection area (Ref. AMM TASK 53-22-12-000-001).
Subtask 53-21-00-110-127-A ** ON A/C NOT FOR ALL
B. Preparation of the Inspection Area
   (1) Make sure that the inspection area is sufficiently clean to do a satisfactory inspection of the area.
   (2) If it is not, clean the inspection area with Non Aqueous Cleaner-General - - (Material No.08BAA9) and a Textile-Lint free Cotton - (Material No.14SBA1) .
   (3) If there is a Temporary Protection System (TPS) layer and if it does not let you do a satisfactory inspection, remove the TPS layer (Ref. AMM TASK 51-78-00-916-001).
4. Procedure
Subtask 53-21-00-220-093-A ** ON A/C NOT FOR ALL
A. Inspection
   (1) Do a detailed inspection of the cabin floor structure between FR24 and FR35.8, below and 0.5 m (1.64 ft.) around the galleys and the lavatories (if installed) for damage or discontinuities. This inspection is also applicable to the emergency exit entrance.
   (2) Make sure that there is no:
     (a) Corrosion damage:
If you find corrosion, refer to the Structural Repair Manual( SRM 512200) for the corrosion types, inspection, removal and subsequent corrosion protection.
     (b) Other damage (scratches, cracks, gouges, dents, creases):
If you find this type of damage, refer to the Structural Repair Manual ( SRM 511100) for the damage types, classification and corrective action.
Subtask 53-21-00-916-073-A ** ON A/C NOT FOR ALL
B. Check and Application of the TPS Layer
CAUTION: DO NOT APPLY TEMPORARY PROTECTION SYSTEM (TPS) TYPE 3 ON THE MOVABLE COMPONENTS. USE ONLY TPS TYPE 1 GRADE 2. IF YOU DO NOT OBEY THIS INSTRUCTION, THE MECHANISMS WILL NOT OPERATE CORRECTLY.
   (1) If the TPS was removed at the "Preparation of the Inspection Area", apply a new layer of Corrosion Preventive Compound_Water Displacing Soft Film - (Material No.12ABC1) or Corrosion Preventive Compound-Water Displacing Hard Film - (Material No.12ABB1) (Ref. AMM TASK 51-78-00-916-001).
   (2) If the TPS was not removed at the "Preparation of the Inspection Area", do a check of the condition and integrity of the TPS layer (Ref. AMM TASK 51-78-00-916-001).
   (3) If the TPS layer has local damage, remove the damaged TPS layer and apply a new layer of Corrosion Preventive Compound_Water Displacing Soft Film - (Material No.12ABC1) or Corrosion Preventive Compound-Water Displacing Hard Film - (Material No.12ABB1) (Ref. AMM TASK 51-78-00-916-001).
NOTE: If, after the check of the condition and integrity, the TPS layer is in the correct condition, Airbus recommends that you apply a new layer as a spray on the existing layer. This is to make sure that the TPS layer continues to give satisfactory corrosion protection.
5. Close-up
Subtask 53-21-00-410-103-A ** ON A/C NOT FOR ALL
A. Close Access
   (1) Install the cabin floor panels between FR24 and FR35.8 (Ref. AMM TASK 53-22-12-400-001).
   (2) If you removed the galleys and the lavatories between FR24 and FR35.8, install them. To do this, refer to the paragraph Component Location in the applicable ATA 25 Description/Operation:
In this paragraph, you will find the cross-references of the removal/installation tasks.
   (3) Make sure that the work area is clean and clear of tools and other items.