General Visual Inspection of Fuselage External Surface around Water Drain Panel Cutout, between FR 25 and FR 29 at Stringer 43 LH
TASK 53-21-00-210-007-A
General Visual Inspection of Fuselage External Surface around Water Drain Panel Cutout, between FR 25 and FR 29 at Stringer 43 LH
Refer to the MPD TASK: 532190-01
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Referenced Information
3. Job Set-up
Subtask 53-21-00-941-082-A
Subtask 53-21-00-210-081-A
Subtask 53-21-00-942-088-A
[Rev.8 from Aug 2017]
2026.04.02 06:29:00 UTC
General Visual Inspection of Fuselage External Surface around Water Drain Panel Cutout, between FR 25 and FR 29 at Stringer 43 LH
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
ZONE: 100
1. Reason for the JobNOTE: The effectivity of this task is "ALL". To know if this task is applicable for your aircraft, refer to the MPD task applicability and the weight variant data given in the SRM introduction.
2. Job Set-up InformationA. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.08BAA9) | Non Aqueous Cleaner-General - - |
| (Material No.14SBA1) | Textile-Lint free Cotton - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 100 | LOWER HALF FUSELAGE INCLUDING RADOME |
| REFERENCE | DESIGNATION |
|---|---|
| SRM 51110001 | (for corrective action) |
| SRM 51220001 | (for corrective action) |
Subtask 53-21-00-941-082-A
A. Get Access
(1) Put an ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position at the zone 130.
Subtask 53-21-00-110-097-A (1) Put an ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position at the zone 130.
B. Cleaning of the Structure
(1) Clean the inspection area with Non Aqueous Cleaner-General - - (Material No.08BAA9) and a lint-free cotton cloth Textile-Lint free Cotton - (Material No.14SBA1) , if necessary.
4. Procedure(1) Clean the inspection area with Non Aqueous Cleaner-General - - (Material No.08BAA9) and a lint-free cotton cloth Textile-Lint free Cotton - (Material No.14SBA1) , if necessary.
Subtask 53-21-00-210-081-A
A. Inspection
(1) Do a visual inspection of the fuselage external surface around the water-drain panel cutout (133AL). This inspection is applicable between FR25 and FR29 at the STGR43, left side.
(2) Make sure that there is no:
(a) Corrosion damage:
If you find corrosion damage, refer to the Structural Repair Manual SRM 51220001 for types of corrosion, inspection, removal and corrosion protection.
(b) Other damage (scratches, cracks, gouges, dents, creases):
If you find other damage, refer to the Structural Repair Manual SRM 51110001 for damage classification and corrective action.
5. Close-up(1) Do a visual inspection of the fuselage external surface around the water-drain panel cutout (133AL). This inspection is applicable between FR25 and FR29 at the STGR43, left side.
(2) Make sure that there is no:
(a) Corrosion damage:
If you find corrosion damage, refer to the Structural Repair Manual SRM 51220001 for types of corrosion, inspection, removal and corrosion protection.
(b) Other damage (scratches, cracks, gouges, dents, creases):
If you find other damage, refer to the Structural Repair Manual SRM 51110001 for damage classification and corrective action.
Subtask 53-21-00-942-088-A
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the access platform(s).
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the access platform(s).
Fuselage External Surface around the Water-Drain Panel Cutout between FR25 and FR29 at STGR43, Left Side