General Visual Inspection of Forward Cargo Door Lock Fittings and Surrounding Structure, External Portion
TASK 53-21-00-210-006-A
General Visual Inspection of Forward Cargo Door Lock Fittings and Surrounding Structure, External Portion
Refer to the MPD TASK: 532170-01
GENERAL VISUAL INSPECTION OF FORWARD CARGO DOOR LOCK FITTINGS AND SURROUNDING STRUCTURE, EXTERNAL PORTION
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Referenced Information
3. Job Set-up
Subtask 53-21-00-941-080-A
Subtask 53-21-00-210-079-A
Subtask 53-21-00-942-086-A
[Rev.10 from 2021]
2026.04.02 06:28:58 UTC
General Visual Inspection of Forward Cargo Door Lock Fittings and Surrounding Structure, External Portion
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
CAUTION:
DO NOT APPLY TEMPORARY PROTECTION SYSTEM (TPS) ON THE INSPECTION AREA. IF YOU APPLY TPS ON THE INSPECTION AREA, YOU CAN CAUSE DAMAGE TO THE AIRCRAFT.
ZONE: 132
1. Reason for the JobRefer to the MPD TASK: 532170-01
GENERAL VISUAL INSPECTION OF FORWARD CARGO DOOR LOCK FITTINGS AND SURROUNDING STRUCTURE, EXTERNAL PORTION
NOTE: Inspection between FR25 and FR27A (6 places).
NOTE: The effectivity of this task is "ALL". To know if this task is applicable to your aircraft, refer to the MPD task applicability and the weight variant data given in the SRM introduction.
2. Job Set-up InformationA. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE |
| No specific | AR | PAPER - MASKING |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.05RDA1) | Adhesive Film Tape-Masking - - |
| (Material No.08BAA9) | Non Aqueous Cleaner-General - - |
| (Material No.12ABB1) | Corrosion Preventive Compound-Water Displacing Hard Film - |
| (Material No.12ABC1) | Corrosion Preventive Compound_Water Displacing Soft Film - |
| (Material No.14SBA1) | Textile-Lint free Cotton - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 132 | FORWARD CARGO COMPARTMENT |
| 825 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 51-78-00-916-001-A | Application of Temporary Protection System (TPS) |
| TASK 52-30-00-860-001-A | Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
| TASK 52-30-00-860-002-A | Close the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
| SRM 511100 | (for corrective action) |
| SRM 512200 | (for corrective action) |
Subtask 53-21-00-941-080-A
A. Get Access
(1) Put an ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position in zone 825.
(2) Open the forward cargo-compartment door 825 (Ref. AMM TASK 52-30-00-860-001).
Subtask 53-21-00-110-095-A (1) Put an ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position in zone 825.
(2) Open the forward cargo-compartment door 825 (Ref. AMM TASK 52-30-00-860-001).
B. Preparation of the Inspection Area
(1) Make sure that the inspection area is sufficiently clean to do a satisfactory inspection of the area.
(2) If it is not, clean the inspection area with Non Aqueous Cleaner-General - - (Material No.08BAA9) and a Textile-Lint free Cotton - (Material No.14SBA1) .
(3) If there is a Temporary Protection System (TPS) layer and if it does not let you do a satisfactory inspection, remove the TPS layer (Ref. AMM TASK 51-78-00-916-001).
4. Procedure(1) Make sure that the inspection area is sufficiently clean to do a satisfactory inspection of the area.
(2) If it is not, clean the inspection area with Non Aqueous Cleaner-General - - (Material No.08BAA9) and a Textile-Lint free Cotton - (Material No.14SBA1) .
(3) If there is a Temporary Protection System (TPS) layer and if it does not let you do a satisfactory inspection, remove the TPS layer (Ref. AMM TASK 51-78-00-916-001).
Subtask 53-21-00-210-079-A
A. Inspection
(1) Do a visual inspection of the lock fittings of the forward cargo door and the adjacent structure. This inspection includes the area between FR25 and FR27A, and the external part (6 places).
(2) Make sure that there is no:
(a) Corrosion damage:
If you find corrosion damage, refer to the Structural Repair Manual SRM 512200 for types of corrosion, inspection, removal and corrosion protection.
(b) Other damage (scratches, cracks, gouges, dents, creases):
If you find other damage, refer to the Structural Repair Manual SRM 511100 for damage classification and corrective action.
Subtask 53-21-00-916-065-A (1) Do a visual inspection of the lock fittings of the forward cargo door and the adjacent structure. This inspection includes the area between FR25 and FR27A, and the external part (6 places).
(2) Make sure that there is no:
(a) Corrosion damage:
If you find corrosion damage, refer to the Structural Repair Manual SRM 512200 for types of corrosion, inspection, removal and corrosion protection.
(b) Other damage (scratches, cracks, gouges, dents, creases):
If you find other damage, refer to the Structural Repair Manual SRM 511100 for damage classification and corrective action.
B. Application of the Temporary Protection System (only necessary for CPCP (Corrosion Prevention and Control Program))
(3) If the TPS layer has local damage, remove the damaged TPS layer and apply a new layer of Corrosion Preventive Compound_Water Displacing Soft Film - (Material No.12ABC1) or Corrosion Preventive Compound-Water Displacing Hard Film - (Material No.12ABB1) on the inspection area (Ref. AMM TASK 51-78-00-916-001).
(4) If, before the inspection, there was:
(5) Remove the PAPER - MASKING or the Adhesive Film Tape-Masking - - (Material No.05RDA1) .
5. Close-upCAUTION:
DO NOT APPLY TEMPORARY PROTECTION ON THE OXYGEN SYSTEMS.
MAKE SURE THAT THE TEMPORARY PROTECTION DOES NOT GET:
(1) If there is a TPS layer, do a check of the condition of the TPS layer (Ref. AMM TASK 51-78-00-916-001). - ON COMPOSITE PARTS, CONTROL CABLES, PULLEYS,TEFLON BEARINGS.
- ON LUBRICATED SURFACES.
- IN DRAIN VALVES OR OTHER ORIFICES.
NOTE: Airbus recommends that you always apply a new layer of TPS. This is to make sure that the TPS layer continues to give satisfactory corrosion protection. If, after the check, you think that the TPS layer is in the correct condition, you can apply a new layer as a spray on the existing layer.
(2) Put PAPER - MASKING or Adhesive Film Tape-Masking - - (Material No.05RDA1) on the equipment and fittings adjacent to the area. (3) If the TPS layer has local damage, remove the damaged TPS layer and apply a new layer of Corrosion Preventive Compound_Water Displacing Soft Film - (Material No.12ABC1) or Corrosion Preventive Compound-Water Displacing Hard Film - (Material No.12ABB1) on the inspection area (Ref. AMM TASK 51-78-00-916-001).
(4) If, before the inspection, there was:
- Removal of the TPS layer or
- Cleaning of the inspection area with high-pressure water, steam, solvents and/or cleaning agents
(5) Remove the PAPER - MASKING or the Adhesive Film Tape-Masking - - (Material No.05RDA1) .
Subtask 53-21-00-942-086-A
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the forward cargo-compartment door 825 (Ref. AMM TASK 52-30-00-860-002).
(3) Remove the access platform(s).
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the forward cargo-compartment door 825 (Ref. AMM TASK 52-30-00-860-002).
(3) Remove the access platform(s).
Forward Cargo Door - Lock Fittings and the Adjacent Structure, FR25 and FR27A