Detailed Inspection of Escape Chute Slide Compartment, Internal Structure, between FR 35.1 and FR 35.2A, from Stringer 24 to Stringer 28, LH/RH
TASK 53-21-00-200-020-A
Detailed Inspection of Escape Chute Slide Compartment, Internal Structure, between FR 35.1 and FR 35.2A, from Stringer 24 to Stringer 28, LH/RH
Refer to the MPD TASK: 532117-01
DETAILED INSPECTION OF ESCAPE CHUTE SLIDE COMPARTMENT, INTERNAL STRUCTURE, BETWEEN FR 35.1 AND FR 35.2A, FROM STRINGER 24 TO STRINGER 28, LH/RH
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Referenced Information
3. Job Set-up
Subtask 53-21-00-010-061-A ** ON A/C NOT FOR ALL
Subtask 53-21-00-220-052-A ** ON A/C NOT FOR ALL
Subtask 53-21-00-410-060-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.02 06:28:56 UTC
Detailed Inspection of Escape Chute Slide Compartment, Internal Structure, between FR 35.1 and FR 35.2A, from Stringer 24 to Stringer 28, LH/RH
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
1. Reason for the JobRefer to the MPD TASK: 532117-01
DETAILED INSPECTION OF ESCAPE CHUTE SLIDE COMPARTMENT, INTERNAL STRUCTURE, BETWEEN FR 35.1 AND FR 35.2A, FROM STRINGER 24 TO STRINGER 28, LH/RH
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE |
| No specific | AR | PAPER - MASKING |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.05RDA1) | Adhesive Film Tape-Masking - - |
| (Material No.08BAA9) | Non Aqueous Cleaner-General - - |
| (Material No.12ABB1) | Corrosion Preventive Compound-Water Displacing Hard Film - |
| (Material No.12ABC1) | Corrosion Preventive Compound_Water Displacing Soft Film - |
| (Material No.14SBA1) | Textile-Lint free Cotton - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 131 | FORWARD CARGO COMPARTMENT |
| 132 | FORWARD CARGO COMPARTMENT |
| 833, 843 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 25-62-47-000-001-A | Removal of the Escape Slide Enclosure |
| TASK 25-62-47-400-001-A | Installation of the Escape Slide Enclosure |
| TASK 51-78-00-916-001-A | Application of Temporary Protection System (TPS) |
| SRM 51110001 | (for corrective action) |
| SRM 51220001 | (for corrective action) |
Subtask 53-21-00-010-061-A ** ON A/C NOT FOR ALL
A. Get Access
(1) Put an ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE at zone 131 (132).
(2) Remove the escape-slide stowage compartment at door 833 ( 843) (Ref. AMM TASK 25-62-47-000-001).
Subtask 53-21-00-110-052-A ** ON A/C NOT FOR ALL (1) Put an ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE at zone 131 (132).
(2) Remove the escape-slide stowage compartment at door 833 ( 843) (Ref. AMM TASK 25-62-47-000-001).
B. Preparation of the Inspection Area
(1) Make sure that the inspection area is sufficiently clean to do a satisfactory inspection of the area.
(2) If it is not, clean the inspection area with Non Aqueous Cleaner-General - - (Material No.08BAA9) and a Textile-Lint free Cotton - (Material No.14SBA1) .
(3) If there is a Temporary Protection System (TPS) layer and if it does not let you do a satisfactory inspection, remove the TPS layer (Ref. AMM TASK 51-78-00-916-001).
4. Procedure(1) Make sure that the inspection area is sufficiently clean to do a satisfactory inspection of the area.
(2) If it is not, clean the inspection area with Non Aqueous Cleaner-General - - (Material No.08BAA9) and a Textile-Lint free Cotton - (Material No.14SBA1) .
(3) If there is a Temporary Protection System (TPS) layer and if it does not let you do a satisfactory inspection, remove the TPS layer (Ref. AMM TASK 51-78-00-916-001).
Subtask 53-21-00-220-052-A ** ON A/C NOT FOR ALL
A. Inspection
(1) Do a detailed inspection of the internal structure of the escape slide stowage compartment. This inspection is applicable between FR35.1 and FR35.2A from STGR24 to STGR28, left and right sides.
(2) Make sure that there is no:
(a) Corrosion damage:
- If you find corrosion damage, refer to the Structural Repair Manual SRM 51220001 for types of corrosion, inspection, removal and corrosion protection.
(b) Other damage (scratches, cracks, gouges, dents, creases):
- If you find other damage, refer to the Structural Repair Manual SRM 51110001 for damage classification and corrective action.
Subtask 53-21-00-916-059-A ** ON A/C NOT FOR ALL (1) Do a detailed inspection of the internal structure of the escape slide stowage compartment. This inspection is applicable between FR35.1 and FR35.2A from STGR24 to STGR28, left and right sides.
(2) Make sure that there is no:
(a) Corrosion damage:
- If you find corrosion damage, refer to the Structural Repair Manual SRM 51220001 for types of corrosion, inspection, removal and corrosion protection.
(b) Other damage (scratches, cracks, gouges, dents, creases):
- If you find other damage, refer to the Structural Repair Manual SRM 51110001 for damage classification and corrective action.
B. Application of the Temporary Protection System
(3) If the TPS layer has local damage, remove the damaged TPS layer and apply a new layer of Corrosion Preventive Compound_Water Displacing Soft Film - (Material No.12ABC1) or Corrosion Preventive Compound-Water Displacing Hard Film - (Material No.12ABB1) on the inspection area (Ref. AMM TASK 51-78-00-916-001).
(4) If, before the inspection, there was:
(5) Remove the PAPER - MASKING or the Adhesive Film Tape-Masking - - (Material No.05RDA1) .
5. Close-upCAUTION:
DO NOT APPLY TEMPORARY PROTECTION ON THE OXYGEN SYSTEMS.
MAKE SURE THAT THE TEMPORARY PROTECTION DOES NOT GET:
(1) If there is a TPS layer, do a check of the condition of the TPS layer (Ref. AMM TASK 51-78-00-916-001). - ON COMPOSITE PARTS, CONTROL CABLES, PULLEYS,TEFLON BEARINGS.
- ON LUBRICATED SURFACES.
- IN DRAIN VALVES OR OTHER ORIFICES.
NOTE: Airbus recommends that you always apply a new layer of TPS. This is to make sure that the TPS layer continues to give satisfactory corrosion protection. If, after the check, you think that the TPS layer is in the correct condition, you can apply a new layer as a spray on the existing layer.
(2) Apply PAPER - MASKING or Adhesive Film Tape-Masking - - (Material No.05RDA1) on the equipment and fittings adjacent to the area. (3) If the TPS layer has local damage, remove the damaged TPS layer and apply a new layer of Corrosion Preventive Compound_Water Displacing Soft Film - (Material No.12ABC1) or Corrosion Preventive Compound-Water Displacing Hard Film - (Material No.12ABB1) on the inspection area (Ref. AMM TASK 51-78-00-916-001).
(4) If, before the inspection, there was:
- Removal of the TPS layer or
- Cleaning of the inspection area with high-pressure water, steam, solvents and/or cleaning agents
(5) Remove the PAPER - MASKING or the Adhesive Film Tape-Masking - - (Material No.05RDA1) .
Subtask 53-21-00-410-060-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the escape slide stowage compartment at door 833 ( 843) (Ref. AMM TASK 25-62-47-400-001).
(3) Remove the access platform(s).
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the escape slide stowage compartment at door 833 ( 843) (Ref. AMM TASK 25-62-47-400-001).
(3) Remove the access platform(s).
Escape-Slide Stowage Compartment