Detailed Inspection of Internal Structure around Forward Emergency Exit Cutouts, between FR 35 and FR 35.3 from Stringer 23 LH to Stringer 7 LH...
TASK 53-21-00-200-018-A
Detailed Inspection of Internal Structure around Forward Emergency Exit Cutouts, between FR 35 and FR 35.3 from Stringer 23 LH to Stringer 7 LH...
Refer to the MPD TASK: 532113-01
DETAILED INSPECTION OF INTERNAL STRUCTURE AROUND FORWARD EMERGENCY EXIT CUTOUTS, BETWEEN FR 35 AND FR 35.3 FROM STRINGER 23 LH TO STRINGER 7 LH AND FROM STRINGER 23 RH TO STRINGER 10 RH
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Referenced Information
3. Job Set-up
Subtask 53-21-00-010-059-A ** ON A/C NOT FOR ALL
Subtask 53-21-00-220-050-A ** ON A/C NOT FOR ALL
Subtask 53-21-00-410-058-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.02 06:28:56 UTC
Detailed Inspection of Internal Structure around Forward Emergency Exit Cutouts, between FR 35 and FR 35.3 from Stringer 23 LH to Stringer 7 LH...
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
1. Reason for the JobRefer to the MPD TASK: 532113-01
DETAILED INSPECTION OF INTERNAL STRUCTURE AROUND FORWARD EMERGENCY EXIT CUTOUTS, BETWEEN FR 35 AND FR 35.3 FROM STRINGER 23 LH TO STRINGER 7 LH AND FROM STRINGER 23 RH TO STRINGER 10 RH
NOTE: The effectivity of this task is "ALL". To know if this task is applicable for your aircraft, refer to the MPD task applicability and the weight variant data given in the SRM introduction.
2. Job Set-up InformationA. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE |
| No specific | AR | PAPER - MASKING |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.05RDA1) | Adhesive Film Tape-Masking - - |
| (Material No.08BAA9) | Non Aqueous Cleaner-General - - |
| (Material No.12ABB1) | Corrosion Preventive Compound-Water Displacing Hard Film - |
| (Material No.12ABC1) | Corrosion Preventive Compound_Water Displacing Soft Film - |
| (Material No.14SBA1) | Textile-Lint free Cotton - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 231 | FWD PASSENGER COMPARTMENT |
| 232 | FWD PASSENGER COMPARTMENT |
| 833, 843 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 25-23-41-000-001-A | Removal of the Ceiling Panels |
| TASK 25-23-41-400-001-A | Installation of the Ceiling Panels |
| TASK 25-23-43-000-001-A | Removal of the Upper Sidewall Panel |
| TASK 25-23-43-400-001-A | Installation of the Upper Sidewall Panel |
| TASK 25-23-47-000-004-A | Removal of the Door Frame Linings of the LH FWD Emergency Exit Door, zone 231 |
| TASK 25-23-47-000-009-A | Removal of the Door Frame Linings of the Right Forward Emergency Exit Door from Zone 232 |
| TASK 25-23-47-400-004-A | Installation of the Door Frame Linings of the LH FWD Emergency Exit Door, zone 231 |
| TASK 25-23-47-400-009-A | Installation of the Door Frame Linings of the Right Forward Emergency Exit Door in Zone 232 |
| TASK 25-23-48-000-001-A | Removal of the Cove Light Panel |
| TASK 25-23-48-400-001-A | Installation of the Cove Light Panel |
| TASK 25-24-41-000-001-A | Removal of the Overhead Stowage Compartments (OHSC) |
| TASK 25-24-41-400-001-A | Installation of the Overhead Stowage Compartments (OHSC) |
| TASK 25-80-00-000-001-A | Removal of the Insulation Blankets |
| TASK 25-80-00-400-001-A | Installation of the Insulation Blankets |
| TASK 51-78-00-916-001-A | Application of Temporary Protection System (TPS) |
| TASK 52-22-00-010-001-A | Opening of the Emergency Exit Doors from the Passenger Compartment |
| TASK 52-22-00-410-001-A | Closing of the Emergency Exit Doors from the Passenger Compartment |
| SRM 511100 | (for corrective action) |
| SRM 512200 | (for corrective action) |
Subtask 53-21-00-010-059-A ** ON A/C NOT FOR ALL
A. Get Access
(1) Put an ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE in position in zone 833 (843).
(2) Open the forward emergency exit door 833 ( 843) (Ref. AMM TASK 52-22-00-010-001).
(3) Remove the necessary door frame linings to get access to the inspection area (Ref. AMM TASK 25-23-47-000-004) (Ref. AMM TASK 25-23-47-000-009).
(4) Remove the necessary upper sidewall panels to get access to the inspection area (Ref. AMM TASK 25-23-43-000-001).
(5) Remove the necessary cove light panels to get access to the inspection area (Ref. AMM TASK 25-23-48-000-001).
(6) Remove the necessary ceiling panels to get access to the inspection area (Ref. AMM TASK 25-23-41-000-001).
(7) Remove the overhead stowage compartments, if installed (Ref. AMM TASK 25-24-41-000-001).
(8) Remove the necessary insulation blankets to get access to the inspection area (Ref. AMM TASK 25-80-00-000-001).
Subtask 53-21-00-110-050-A ** ON A/C NOT FOR ALL (1) Put an ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE in position in zone 833 (843).
(2) Open the forward emergency exit door 833 ( 843) (Ref. AMM TASK 52-22-00-010-001).
(3) Remove the necessary door frame linings to get access to the inspection area (Ref. AMM TASK 25-23-47-000-004) (Ref. AMM TASK 25-23-47-000-009).
(4) Remove the necessary upper sidewall panels to get access to the inspection area (Ref. AMM TASK 25-23-43-000-001).
(5) Remove the necessary cove light panels to get access to the inspection area (Ref. AMM TASK 25-23-48-000-001).
(6) Remove the necessary ceiling panels to get access to the inspection area (Ref. AMM TASK 25-23-41-000-001).
(7) Remove the overhead stowage compartments, if installed (Ref. AMM TASK 25-24-41-000-001).
(8) Remove the necessary insulation blankets to get access to the inspection area (Ref. AMM TASK 25-80-00-000-001).
B. Preparation of the Inspection Area
(1) Make sure that the inspection area is sufficiently clean to do a satisfactory inspection of the area.
(2) If it is not, clean the inspection area with Non Aqueous Cleaner-General - - (Material No.08BAA9) and a Textile-Lint free Cotton - (Material No.14SBA1) .
(3) If there is a Temporary Protection System (TPS) layer and if it does not let you do a satisfactory inspection, remove the TPS layer (Ref. AMM TASK 51-78-00-916-001).
4. Procedure(1) Make sure that the inspection area is sufficiently clean to do a satisfactory inspection of the area.
(2) If it is not, clean the inspection area with Non Aqueous Cleaner-General - - (Material No.08BAA9) and a Textile-Lint free Cotton - (Material No.14SBA1) .
(3) If there is a Temporary Protection System (TPS) layer and if it does not let you do a satisfactory inspection, remove the TPS layer (Ref. AMM TASK 51-78-00-916-001).
Subtask 53-21-00-220-050-A ** ON A/C NOT FOR ALL
A. Inspection
(1) Do a detailed inspection of the internal structure around the forward emergency exit cutouts between FR35 and FR35.3 :
(a) Corrosion damage:
- If you find corrosion damage, refer to the Structural Repair Manual SRM 512200 for types of corrosion, inspection, removal and corrosion protection.
(b) Other damage (scratches, cracks, gouges, dents, creases):
- If you find other damage, refer to the Structural Repair Manual SRM 511100 for damage classification and corrective action.
Subtask 53-21-00-916-050-A ** ON A/C NOT FOR ALL (1) Do a detailed inspection of the internal structure around the forward emergency exit cutouts between FR35 and FR35.3 :
- for the left side, from STGR23 to STGR7
- for the right side, from STGR23 to STGR10.
(a) Corrosion damage:
- If you find corrosion damage, refer to the Structural Repair Manual SRM 512200 for types of corrosion, inspection, removal and corrosion protection.
(b) Other damage (scratches, cracks, gouges, dents, creases):
- If you find other damage, refer to the Structural Repair Manual SRM 511100 for damage classification and corrective action.
B. Application of the Temporary Protection System
(3) If the TPS layer has local damage, remove the damaged TPS layer and apply a new layer of Corrosion Preventive Compound_Water Displacing Soft Film - (Material No.12ABC1) or Corrosion Preventive Compound-Water Displacing Hard Film - (Material No.12ABB1) on the inspection area (Ref. AMM TASK 51-78-00-916-001).
(4) If, before the inspection, there was:
(5) Remove the PAPER - MASKING or the Adhesive Film Tape-Masking - - (Material No.05RDA1) .
5. Close-upCAUTION:
DO NOT APPLY TEMPORARY PROTECTION ON THE OXYGEN SYSTEMS.
MAKE SURE THAT THE TEMPORARY PROTECTION DOES NOT GET:
(1) If there is a TPS layer, do a check of the condition of the TPS layer (Ref. AMM TASK 51-78-00-916-001). - ON COMPOSITE PARTS, CONTROL CABLES, PULLEYS,TEFLON BEARINGS.
- ON LUBRICATED SURFACES.
- IN DRAIN VALVES OR OTHER ORIFICES.
NOTE: Airbus recommends that you always apply a new layer of TPS. This is to make sure that the TPS layer continues to give satisfactory corrosion protection. If, after the check, you think that the TPS layer is in the correct condition, you can apply a new layer as a spray on the existing layer.
(2) Put PAPER - MASKING or Adhesive Film Tape-Masking - - (Material No.05RDA1) on the equipment and fittings adjacent to the area. (3) If the TPS layer has local damage, remove the damaged TPS layer and apply a new layer of Corrosion Preventive Compound_Water Displacing Soft Film - (Material No.12ABC1) or Corrosion Preventive Compound-Water Displacing Hard Film - (Material No.12ABB1) on the inspection area (Ref. AMM TASK 51-78-00-916-001).
(4) If, before the inspection, there was:
- Removal of the TPS layer or
- Cleaning of the inspection area with high-pressure water, steam, solvents and/or cleaning agents
(5) Remove the PAPER - MASKING or the Adhesive Film Tape-Masking - - (Material No.05RDA1) .
Subtask 53-21-00-410-058-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the insulation blankets (Ref. AMM TASK 25-80-00-400-001).
(3) Install the overhead stowage compartments, if removed (Ref. AMM TASK 25-24-41-400-001).
(4) Install the ceiling panels (Ref. AMM TASK 25-23-41-400-001).
(5) Install the cove light panels (Ref. AMM TASK 25-23-48-400-001).
(6) Install the upper sidewall panels (Ref. AMM TASK 25-23-43-400-001).
(7) Install the door frame linings (Ref. AMM TASK 25-23-47-400-004) (Ref. AMM TASK 25-23-47-400-009).
(8) Close the forward emergency exit door 833 ( 843) (Ref. AMM TASK 52-22-00-410-001).
(9) Remove the access platform(s).
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the insulation blankets (Ref. AMM TASK 25-80-00-400-001).
(3) Install the overhead stowage compartments, if removed (Ref. AMM TASK 25-24-41-400-001).
(4) Install the ceiling panels (Ref. AMM TASK 25-23-41-400-001).
(5) Install the cove light panels (Ref. AMM TASK 25-23-48-400-001).
(6) Install the upper sidewall panels (Ref. AMM TASK 25-23-43-400-001).
(7) Install the door frame linings (Ref. AMM TASK 25-23-47-400-004) (Ref. AMM TASK 25-23-47-400-009).
(8) Close the forward emergency exit door 833 ( 843) (Ref. AMM TASK 52-22-00-410-001).
(9) Remove the access platform(s).
Forward Emergency Exit Cutouts - Internal Structure