Installation of the Drain Valves
TASK 53-19-41-400-003-A
Installation of the Drain Valves
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Referenced Information
3. Job Set-up
Subtask 53-19-41-860-052-A
Subtask 53-19-41-840-052-A
Subtask 53-19-41-410-052-A
[Rev.10 from 2021]
2026.04.02 07:24:48 UTC
Installation of the Drain Valves
ZONE: 120
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.06AAB1) | Polysulfide Sealant-General Purpose Fillet - |
| (Material No.06AEA1) | Polysulfide Sealant-Low Adhesion Brushable - |
| (Material No.06AEB2) | Polysulfide Sealant-Low Adhesion Fillet Structure |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 120 | AVIONICS COMPARTMENT |
| 811, 824 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 53-12-13-000-001-A | Removal of the avionics compartment floor panels |
| TASK 53-12-13-400-001-A | Installation of the avionics compartment floor panels |
Subtask 53-19-41-860-052-A
A. Aircraft Maintenance Configuration
(1) Make sure that the aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002).
Subtask 53-19-41-010-055-A (1) Make sure that the aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002).
B. Get Access
(1) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position at zone 811.
(2) Make sure that the avionics-compartment access door 811 is open.
(3) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position at zone 824.
(4) Make sure that the avionics-compartment access door 824 is open.
(5) On the panel 50VU:
(7) Make sure that the insulation blanket is removed.
4. Procedure(1) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position at zone 811.
(2) Make sure that the avionics-compartment access door 811 is open.
(3) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position at zone 824.
(4) Make sure that the avionics-compartment access door 824 is open.
(5) On the panel 50VU:
- make sure that the AVIONICS/COMPT LT pushbutton switch 23LS is pushed.
(7) Make sure that the insulation blanket is removed.
Subtask 53-19-41-840-052-A
A. Preparation for Installation
(1) Make sure that the parts retained from the removed component are clean and in the correct condition.
(2) Clean the component interfaces and the adjacent area.
Subtask 53-19-41-420-052-A (1) Make sure that the parts retained from the removed component are clean and in the correct condition.
(2) Clean the component interfaces and the adjacent area.
B. Installation of the Drain Valve
(1) Apply Polysulfide Sealant-General Purpose Fillet - (Material No.06AAB1) on the contact surfaces of the retaining valve (2) and of the structure.
(2) Put the retaining valve (2) in position.
(3) Apply Polysulfide Sealant-General Purpose Fillet - (Material No.06AAB1) around the retaining valve (2).
(4) Put the two nuts (1) in position.
(5) Install the two bolts (3). Tighten the two nuts (1).
(6) Apply Polysulfide Sealant-Low Adhesion Brushable - (Material No.06AEA1) or Polysulfide Sealant-Low Adhesion Fillet Structure (Material No.06AEB2) between the valve (4) and the structure.
(7) Install the valve (4).
5. Close-up(1) Apply Polysulfide Sealant-General Purpose Fillet - (Material No.06AAB1) on the contact surfaces of the retaining valve (2) and of the structure.
(2) Put the retaining valve (2) in position.
(3) Apply Polysulfide Sealant-General Purpose Fillet - (Material No.06AAB1) around the retaining valve (2).
(4) Put the two nuts (1) in position.
(5) Install the two bolts (3). Tighten the two nuts (1).
(6) Apply Polysulfide Sealant-Low Adhesion Brushable - (Material No.06AEA1) or Polysulfide Sealant-Low Adhesion Fillet Structure (Material No.06AEB2) between the valve (4) and the structure.
(7) Install the valve (4).
Subtask 53-19-41-410-052-A
A. Installation of Components
(1) Install the insulation blanket on the drain valve.
(2) Make sure that the work area is clean and clear of tools and other items.
(3) Install the floor panel (Ref. AMM TASK 53-12-13-400-001).
Subtask 53-19-41-941-051-A (1) Install the insulation blanket on the drain valve.
(2) Make sure that the work area is clean and clear of tools and other items.
(3) Install the floor panel (Ref. AMM TASK 53-12-13-400-001).
B. Close Access
(1) On the panel 50VU:
(3) Remove the access platform(s).
Subtask 53-19-41-862-052-A (1) On the panel 50VU:
- push then release the AVIONICS COMPT/LT pushbutton switch.
(3) Remove the access platform(s).
Drain Valve