Installation of the Collector Grid and the Container
TASK 53-19-41-400-001-A
Installation of the Collector Grid and the Container
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Referenced Information
3. Job Set-up
Subtask 53-19-41-860-050-A ** ON A/C NOT FOR ALL
Subtask 53-19-41-840-050-A ** ON A/C NOT FOR ALL
Subtask 53-19-41-410-050-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.02 06:28:55 UTC
Installation of the Collector Grid and the Container
ZONE: 120
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE |
| No specific | Torque wrench: range to between 0.308 and 0.252 m.daN (27.26 and 22.30 lbf.in ) ![]() |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.06AAB1) | Polysulfide Sealant-General Purpose Fillet - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 120 | AVIONICS COMPARTMENT |
| 812 |
| REFERENCE | DESIGNATION |
|---|---|
Subtask 53-19-41-860-050-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position at zone 812.
(2) Make sure that the avionics-compartment access door 812 is open.
4. Procedure(1) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position at zone 812.
(2) Make sure that the avionics-compartment access door 812 is open.
Subtask 53-19-41-840-050-A ** ON A/C NOT FOR ALL
A. Preparation for Installation
Collector Grid and Container ** ON A/C NOT FOR ALL
Collector Grid and Container ** ON A/C NOT FOR ALL
(1) Flush the collector grid (2) and the container (9).
(2) Remove and clean the strainers (10) of the container.
(3) Dry the collector grid (2), the container (9) and the strainers (10).
(4) Install the strainers (10).
(5) Clean the component interfaces and the adjacent area.
Subtask 53-19-41-420-050-A ** ON A/C NOT FOR ALL
Collector Grid and Container ** ON A/C NOT FOR ALL
Collector Grid and Container ** ON A/C NOT FOR ALL (2) Remove and clean the strainers (10) of the container.
(3) Dry the collector grid (2), the container (9) and the strainers (10).
(4) Install the strainers (10).
(5) Clean the component interfaces and the adjacent area.
B. Installation of the Collector Grid and the Container
(1) Put the container (9) in position.
(2) Install the washers (3) and the screws (4).
(3) Install the washers (5) and the screws (6).
(4) Tighten the screws (4) and (6).
(5) Make sure that the line end-fittings are serviceable.
(6) Connect the ducts (8).
(7) Install the clamps (7) and TORQUE the clamps to between 0.308 and 0.252 m.daN (27.26 and 22.30 lbf.in )
.
(8) Put the collector grid (2) in position.
(9) Install the screws (1) and tighten.
(10) Apply a layer of Polysulfide Sealant-General Purpose Fillet - (Material No.06AAB1) between the structure and the grid rack assembly, on the ends of the screws (4) and (6).
Subtask 53-19-41-420-050-B ** ON A/C NOT FOR ALL (1) Put the container (9) in position.
(2) Install the washers (3) and the screws (4).
(3) Install the washers (5) and the screws (6).
(4) Tighten the screws (4) and (6).
(5) Make sure that the line end-fittings are serviceable.
(6) Connect the ducts (8).
(7) Install the clamps (7) and TORQUE the clamps to between 0.308 and 0.252 m.daN (27.26 and 22.30 lbf.in )
. (8) Put the collector grid (2) in position.
(9) Install the screws (1) and tighten.
(10) Apply a layer of Polysulfide Sealant-General Purpose Fillet - (Material No.06AAB1) between the structure and the grid rack assembly, on the ends of the screws (4) and (6).
B. Installation of the Collector Grid and the Container
(1) Put the container (9) in position.
(2) Install the washers (3) and the screws (4).
(3) Install the washers (5) and the screws (6).
(4) Tighten the screws (4) and (6).
(5) Make sure that the line end-fittings are serviceable.
(6) Connect the ducts (8).
(7) Install the cable-tie (7).
(8) Put the collector grid (2) in position.
(9) Install the screws (1) and tighten.
(10) Apply a layer of Polysulfide Sealant-General Purpose Fillet - (Material No.06AAB1) between the structure and the grid rack assembly, on the ends of the screws (4) and (6).
5. Close-up(1) Put the container (9) in position.
(2) Install the washers (3) and the screws (4).
(3) Install the washers (5) and the screws (6).
(4) Tighten the screws (4) and (6).
(5) Make sure that the line end-fittings are serviceable.
(6) Connect the ducts (8).
(7) Install the cable-tie (7).
(8) Put the collector grid (2) in position.
(9) Install the screws (1) and tighten.
(10) Apply a layer of Polysulfide Sealant-General Purpose Fillet - (Material No.06AAB1) between the structure and the grid rack assembly, on the ends of the screws (4) and (6).
Subtask 53-19-41-410-050-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the access door 812.
(3) Remove the access platform(s).
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the access door 812.
(3) Remove the access platform(s).