Installation of the Radome
TASK 53-15-11-400-001-A-01
Installation of the Radome
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Expendable Parts
E. Referenced Information
3. Job Set-up
Subtask 53-15-11-865-080-A
Subtask 53-15-11-869-059-A
Subtask 53-15-11-420-067-A
(1) Carefully put the radome (8) on the structure adjacent to FR1 with the CRANE 50KG (110 LB).
(2) Put and hold the hinge fittings (9) of the radome (8) on the support fittings adjacent to FR1.
(3) Install the bolts (6).
(4) Install the bushes (5) and (4).
(5) Install the washers (3) and the nuts (2).
(6) Tighten the nuts (2).
(7) Safety the nuts (2) with the new AIPC 53-15-11-01-040 COTTER PINS (1) or the new AIPC 53-15-81-01-010 COTTER PINS (1).
(8) Make sure that minimum peripheral clearance J1 between the bolts (6) and the support fittings (17) of the radome is 0.5 mm (0.0197 in.).
Subtask 53-15-11-420-068-A
Subtask 53-15-11-160-055-A
[Rev.10 from 2021]
2026.04.02 06:28:50 UTC
Installation of the Radome
WARNING:
BECAUSE THE RADOME IS LARGE AND HEAVY, A MINIMUM OF TWO PERSONS (OR SUPPORT EQUIPMENT, SUCH AS A CRANE AND SLINGS) ARE NECESSARY TO MOVE IT. IF YOU MOVE IT WITHOUT THE NECESSARY NUMBER OF PERSONS (OR SUPPORT EQUIPMENT), YOU CAN CAUSE INJURY TO PERSONNEL OR DAMAGE TO THE RADOME.
WARNING:
BECAUSE THE RADOME IS LARGE AND HEAVY, A MINIMUM OF TWO PERSONS (OR SUPPORT EQUIPMENT, SUCH AS A CRANE AND SLINGS) ARE NECESSARY TO MOVE IT. IF YOU MOVE IT WITHOUT THE NECESSARY NUMBER OF PERSONS (OR SUPPORT EQUIPMENT), YOU CAN CAUSE INJURY TO PERSONNEL OR DAMAGE TO THE RADOME.
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
WARNING:
BEFORE YOU START WORK, YOU MUST PUT ON A SAFETY HARNESS AND ATTACH IT TO THE ACCESS PLATFORM. WITHOUT A SAFETY HARNESS, YOU CAN FALL. THIS CAN KILL YOU OR CAUSE YOU INJURY.
WARNING:
MAKE SURE THAT:
- THERE ARE NO PERSONS OR OBSTACLES IN THE RADOME AREA.
- THE CAPT AND F/O DISPLAY SELECTOR SWITCHES ON THE WEATHER RADAR CONTROL UNIT ARE SET TO OFF (THIS PREVENTS SYSTEM EMISSIONS ON THE GROUND).
WARNING:
DO NOT OPEN THE RADOME IF THE WIND SPEED IS MORE THAN 25 KNOTS.
CAUTION:
BEFORE YOU INSTALL/REMOVE THE GSE-TOOL, READ THE INSTRUCTIONS IN THE APPLICABLE GSE INSTRUCTION MANUAL. WHILE YOU OPERATE THIS TOOL, CAREFULLY OBEY THEM. IF YOU DO NOT OBEY THE INSTRUCTIONS, DAMAGE TO EQUIPMENT CAN OCCUR.
CAUTION:
TAP THE SURFACE OF THE COMPONENT LIGHTLY. IF YOU APPLY TOO MUCH FORCE, YOU CAN CAUSE DAMAGE TO THE RADOME.
CAUTION:
ONLY USE HAND TOOLS TO REMOVE OR INSTALL OR TORQUE THE RADOME OR SKIRT FASTENERS. IF YOU USE POWER OR IMPACT TOOLS, YOU CAN CAUSE DAMAGE TO THE AIRCRAFT.
CAUTION:
WHEN YOU REMOVE OR INSTALL THE RADOME OR THE ANTENNA, MAKE SURE THAT YOU DO NOT CAUSE DAMAGE TO THE SURFACES THAT ARE PAINTED WITH RADIO-ABSORBENT MATERIAL.
CAUTION:
WHEN YOU INSTALL THE RADOME, MAKE SURE THAT YOU INSTALL THE CORRECT SCREWS/BOLTS (THEY HAVE DIFFERENT LENGTHS) AND TORQUE THEM IN THE CORRECT SEQUENCE. IF THE SCREWS/BOLTS ARE INCORRECTLY INSTALLED, THE RADOME CAN BECOME LOOSE DURING FLIGHT.
1. Reason for the JobNOTE: This procedure is applicable to the S2 GLASS radome (Part Number (P/N) D53132210000).
NOTE: The weight of this equipment is approximately 28kg (62lb).
2. Job Set-up InformationA. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 5M (16 FT)- ADJUSTABLE |
| No specific | 1 | CRANE 50KG (110 LB) |
| No specific | AR | GAGE - SPRING |
| No specific | AR | WARNING NOTICE(S) |
| No specific | Torque wrench: range to between 0.37 and 0.28 m.daN (32.74 and 24.78 lbf.in ) ![]() | |
| No specific | Torque wrench: range to between 0.48 and 0.37 m.daN (42.48 and 32.74 lbf.in ) ![]() | |
| 98D53103500000 | 1 | SLING-RADOME |
| 98L12003001000 | AR | HARNESS,SAFETY |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.03JAB1) | Silicone base Grease-- Paste - |
| (Material No.08BAA9) | Non Aqueous Cleaner-General - - |
| (Material No.14SBA1) | Textile-Lint free Cotton - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 110 | RADOME (NOSE CONE TO FR 1) |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 1 | COTTER PINS | AIPC 53-15-11-01-040 |
| 13 | COTTER PINS | AIPC 53-15-11-01-210 |
| 1 | COTTER PINS | AIPC 53-15-81-01-010 |
| 13 | COTTER PINS | AIPC 53-15-81-01-210 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 20-28-00-869-002-A | Table of the Maximum Permitted Resistance-Values |
| TASK 20-28-00-912-802-A | Electrical Bonding - General Maintenance Procedure |
| TASK 20-28-00-912-803-A | Bonding Surface Preparation |
| TASK 53-15-11-010-001-A | Opening of the Radome |
| TASK 53-15-11-300-001-A | Repair of the Radome |
| TASK 53-15-11-410-001-A | Closing of the Radome |
Subtask 53-15-11-865-080-A
WARNING:
MAKE SURE THAT THE CIRCUIT BREAKERS RELATED TO THE WEATHER RADAR ARE OPENED, SAFETIED AND TAGGED.
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 121VU | COM NAV/RADAR/1 | 5SQ1 | K13 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | COM NAV/RADAR/2 | 5SQ2 | K14 |
B. Aircraft Maintenance Configuration
(1) Make sure that the ACCESS PLATFORM 5M (16 FT)- ADJUSTABLE is in position at zone 110.
(2) Put on and attach the HARNESS, SAFETY before you start work in the work area.
(3) Make sure that the WARNING NOTICE(S) is(are) in position in the cockpit to tell persons not to operate the radar system.
Subtask 53-15-11-420-066-A (1) Make sure that the ACCESS PLATFORM 5M (16 FT)- ADJUSTABLE is in position at zone 110.
(2) Put on and attach the HARNESS, SAFETY before you start work in the work area.
(3) Make sure that the WARNING NOTICE(S) is(are) in position in the cockpit to tell persons not to operate the radar system.
C. Installation of the Radome Sling
(1) Install the 98D53103500000 SLING-RADOME (42) on the radome.
(2) Attach the ends of the sling to the housings of the handles (41) and to the hinge fittings.
(3) Attach the 98D53103500000 SLING-RADOME (42) to the CRANE 50KG (110 LB).
(4) Make sure that the 98D53103500000 SLING-RADOME (42) has the correct tension.
Subtask 53-15-11-820-058-A (1) Install the 98D53103500000 SLING-RADOME (42) on the radome.
(2) Attach the ends of the sling to the housings of the handles (41) and to the hinge fittings.
(3) Attach the 98D53103500000 SLING-RADOME (42) to the CRANE 50KG (110 LB).
(4) Make sure that the 98D53103500000 SLING-RADOME (42) has the correct tension.
D. Adjustment of the Telescopic Rods
(1) Make sure that the telescopic rods (11) point in the correct direction to the radome (8).
(2) If the telescopic rods (11) do not point in the correct direction to the radome (8), adjust the telescopic rods (11).
4. Procedure(1) Make sure that the telescopic rods (11) point in the correct direction to the radome (8).
(2) If the telescopic rods (11) do not point in the correct direction to the radome (8), adjust the telescopic rods (11).
Subtask 53-15-11-420-067-A
CAUTION:
DO NOT USE THE LOCALIZER ANTENNA AT THE BOTTOM OF THE RADOME AS A SUPPORT.
CAUTION:
MOVE THE RADOME CAREFULLY TO PREVENT DAMAGE TO THE RADAR.
A. Installation of the Radome (1) Carefully put the radome (8) on the structure adjacent to FR1 with the CRANE 50KG (110 LB).
(2) Put and hold the hinge fittings (9) of the radome (8) on the support fittings adjacent to FR1.
(3) Install the bolts (6).
(4) Install the bushes (5) and (4).
(5) Install the washers (3) and the nuts (2).
(6) Tighten the nuts (2).
(7) Safety the nuts (2) with the new AIPC 53-15-11-01-040 COTTER PINS (1) or the new AIPC 53-15-81-01-010 COTTER PINS (1).
(8) Make sure that minimum peripheral clearance J1 between the bolts (6) and the support fittings (17) of the radome is 0.5 mm (0.0197 in.).
B. Connection of the Components
(1) Put and hold the telescopic rods (11) on the radome (8).
(2) Install the bolts (10). If necessary, pull the heads of the telescopic rods (11) to easily install the bolts (10).
(3) Install the nuts (12) and tighten them.
(4) Safety the nuts (12) with the new AIPC 53-15-11-01-210 COTTER PINS (13) or the new AIPC 53-15-81-01-210 COTTER PINS (13).
(5) Prepare the surface of the bonding point(s)
(Ref. AMM TASK 20-28-00-912-803).
(6) Put and hold the bonding leads (16) on the structure adjacent to FR1.
(7) Install the washers (14) and the bolts (7).
(8) Install the nuts (15) and tighten them.
(9) Do the electrical resistance measurement and the final protection of the bonding point(s)
(Ref. AMM TASK 20-28-00-912-802).
Subtask 53-15-11-020-062-A Subtask 53-15-11-820-059-A (1) Put and hold the telescopic rods (11) on the radome (8).
(2) Install the bolts (10). If necessary, pull the heads of the telescopic rods (11) to easily install the bolts (10).
(3) Install the nuts (12) and tighten them.
(4) Safety the nuts (12) with the new AIPC 53-15-11-01-210 COTTER PINS (13) or the new AIPC 53-15-81-01-210 COTTER PINS (13).
(5) Prepare the surface of the bonding point(s)
(Ref. AMM TASK 20-28-00-912-803).
(6) Put and hold the bonding leads (16) on the structure adjacent to FR1.
(7) Install the washers (14) and the bolts (7).
(8) Install the nuts (15) and tighten them.
(9) Do the electrical resistance measurement and the final protection of the bonding point(s)
(Ref. AMM TASK 20-28-00-912-802).
D. Adjustment of the Locking Handle
(1) Close then open the radome two times (Ref. AMM TASK 53-15-11-410-001) (Ref. AMM TASK 53-15-11-010-001).
(3) Unlock the latch and make sure that it stays unlocked during the check.
(4) Put the GAGE - SPRING with a capacity of 20 daN (44.9618 lbf) perpendicularly and at 10 mm (0.3937 in.) from the end of the locking handle (30).
(5) Make sure that the tension of the lock is between 8 daN (17.9847 lbf) and 12 daN (26.9771 lbf).
(6) If necessary, adjust the tension of the lock as follows:
(a) Open the radome (Ref. AMM TASK 53-15-11-010-001).
(b) Adjust the tension of the lock to between 8 daN (17.9847 lbf) and 12 daN (26.9771 lbf) with the nut (31) of the spring rod (32).
Subtask 53-15-11-820-060-A (1) Close then open the radome two times (Ref. AMM TASK 53-15-11-410-001) (Ref. AMM TASK 53-15-11-010-001).
NOTE: This is to make sure that the radome is in the correct position for the check (no remaining tension).
(2) Close the radome (Ref. AMM TASK 53-15-11-410-001). (3) Unlock the latch and make sure that it stays unlocked during the check.
(4) Put the GAGE - SPRING with a capacity of 20 daN (44.9618 lbf) perpendicularly and at 10 mm (0.3937 in.) from the end of the locking handle (30).
(5) Make sure that the tension of the lock is between 8 daN (17.9847 lbf) and 12 daN (26.9771 lbf).
(6) If necessary, adjust the tension of the lock as follows:
(a) Open the radome (Ref. AMM TASK 53-15-11-010-001).
(b) Adjust the tension of the lock to between 8 daN (17.9847 lbf) and 12 daN (26.9771 lbf) with the nut (31) of the spring rod (32).
E. Check of the Out-of-Flush Dimension and Adjustment of the Hook
Check of the Out-of-Flush Dimension of the Hook ** ON A/C NOT FOR ALL
Check of the Out-of-Flush Dimension and Adjustment of the Hook ** ON A/C NOT FOR ALL
(1) Make sure that out-of-flush dimension J1 between the hook handle (93) and the radome (92) is 0.5 -1.5 mm or +1.5 mm (0.0197 -0.0591 in. or +0.0591 in.).
(2) If out-of-flush dimension J1 is not in the tolerances, you can do the rigging procedure on the radome and FR1 sides.
(a) Do the rigging procedure on the radome side:
1 Do the tangential rigging as follows:
Check of the Out-of-Flush Dimension of the Hook ** ON A/C NOT FOR ALL
Check of the Out-of-Flush Dimension and Adjustment of the Hook ** ON A/C NOT FOR ALL
1 Loosen the screws (91).
2 Adjust the position of the fitting (94) with the serrated plate (95).
.
Subtask 53-15-11-220-061-A
Check of the Out-of-Flush Dimension of the Hook ** ON A/C NOT FOR ALL
Check of the Out-of-Flush Dimension and Adjustment of the Hook ** ON A/C NOT FOR ALL (2) If out-of-flush dimension J1 is not in the tolerances, you can do the rigging procedure on the radome and FR1 sides.
(a) Do the rigging procedure on the radome side:
1 Do the tangential rigging as follows:
- Loosen the nuts (98) and the bolts (96) of the locating pad (97) installed on the radome locking assembly.
- Adjust the position of the locating pad (97).
NOTE: The possible movement of the locating pad (97) is 0 +2 mm or -2 mm (0.0000 +0.0787 in. or -0.0787 in.).
- Make sure that you can change the position of the locating pad (97) to 0 +2 mm or -2 mm (0.0000 +0.0787 in. or -0.0787 in.) with a maximum thread damage of 0.75 mm (0.0295 in.).
- TORQUE the nuts (98) to between 0.48 and 0.37 m.daN (42.48 and 32.74 lbf.in )
.
- Loosen the nuts (98) and the bolts (96) of the locating pad (97) installed on the radome locking assembly.
- Turn the locating pad (97) 180 degrees.
- TORQUE the nuts (98) to between 0.48 and 0.37 m.daN (42.48 and 32.74 lbf.in )
.
Check of the Out-of-Flush Dimension of the Hook ** ON A/C NOT FOR ALL
Check of the Out-of-Flush Dimension and Adjustment of the Hook ** ON A/C NOT FOR ALL 2 Adjust the position of the fitting (94) with the serrated plate (95).
NOTE: The possible movement of the fitting (94) is 0 +3 mm or -3 mm (0.0000 +0.1181 in. or -0.1181 in.).
3 TORQUE the screws (91) to between 0.37 and 0.28 m.daN (32.74 and 24.78 lbf.in )
. F. Check of the Clearances
(a) In the sub-frame area (points 1 thru 4 and 16 thru 18), make sure that out-of-flush dimension A1 is between -1.5 mm (-0.0591 in.) and +3.5 mm (0.1378 in.) on the radome periphery.
(b) In the area between points 5 and 15, make sure that out-of-flush dimension A1 is between -1.5 mm (-0.0591 in.) and +2.5 mm (0.0984 in.) on the radome periphery.
1 Do the rigging procedure on the radome side:
a Do a tangential rigging as follows:
Check of the Out-of-Flush Dimension of the Hook ** ON A/C NOT FOR ALL
Check of the Out-of-Flush Dimension and Adjustment of the Hook ** ON A/C NOT FOR ALL
a Loosen the four screws (91).
b Adjust the position of the fitting (94) with the serrated plate (95).
.
(4) Measure peripheral clearance J1 between the radome and the aircraft structure at:
(6) Make sure that peripheral clearance J1 is between +0.5 mm (0.0197 in.) and +3.5 mm (0.1378 in.).
(7) Examine peripheral clearance J1 on all the radome periphery, not only on the report points. If there are out-of-tolerance points between the point positions that the design office gave you, record them in the measurement report.
Subtask 53-15-11-220-062-A NOTE: After the first flight that follows the radome installation, a radome deformation can occur because of the aerodynamic loads caused during the flight.
When the aircraft is on the ground:
(1) Open radome 110AL two times (Ref. AMM TASK 53-15-11-010-001) (Ref. AMM TASK 53-15-11-410-001). When the aircraft is on the ground:
- It is permitted for the monolithic border of the radome to touch the fuselage skin.
- An into-wind step of 6 mm (0.2362 in.) on a length of 250 mm (9.8425 in.) is permitted between the radome and the fuselage skin (on the top left and right sides). No procedure is necessary.
NOTE: This is to make sure that the radome is in the correct position for the check (no remaining tension).
(2) Measure out-of-flush dimension A1 between the aircraft structure and the radome at: - 16 points: 1 thru 3, 5 thru 15 and 17 and 18
- 2 points at the top left and right corners of the radome: 4 and 16.
(a) In the sub-frame area (points 1 thru 4 and 16 thru 18), make sure that out-of-flush dimension A1 is between -1.5 mm (-0.0591 in.) and +3.5 mm (0.1378 in.) on the radome periphery.
(b) In the area between points 5 and 15, make sure that out-of-flush dimension A1 is between -1.5 mm (-0.0591 in.) and +2.5 mm (0.0984 in.) on the radome periphery.
NOTE: FR1 out-of-flush dimension A1 between -1.5 mm (-0.0591 in.) and +3 mm (0.1181 in.) is permitted on 25% of the radome periphery.
(c) If out-of-flush dimension A1 is not in the tolerances, you can do this rigging procedure on the radome and FR1 sides.1 Do the rigging procedure on the radome side:
a Do a tangential rigging as follows:
- Loosen the nuts (98) and the bolts (96) of the locating pad (97) installed on the radome locking assembly.
- Adjust the position of the locating pad (97).
NOTE: The possible movement of the locating pad (97) is 0 +2 mm or -2 mm (0.0000 +0.0787 in. or -0.0787 in.).
- Make sure that you can change the position of the locating pad (97) to 0 +2 mm or -2 mm (0.0000 +0.0787 in. or -0.0787 in.) with a maximum thread damage of 0.75 mm (0.0295 in.).
- TORQUE the nuts (98) to between 0.48 and 0.37 m.daN (42.48 and 32.74 lbf.in )
.
- Loosen the nuts (98) and the bolts (96) of the locating pad (97) installed on the radome locking assembly.
- Turn the locating pad (97) 180 degrees.
- TORQUE the nuts (98) to between 0.48 and 0.37 m.daN (42.48 and 32.74 lbf.in )
.
Check of the Out-of-Flush Dimension of the Hook ** ON A/C NOT FOR ALL
Check of the Out-of-Flush Dimension and Adjustment of the Hook ** ON A/C NOT FOR ALL b Adjust the position of the fitting (94) with the serrated plate (95).
NOTE: The possible movement of the fitting (94) is 0 +3 mm or -3 mm (0.0000 +0.1181 in. or -0.1181 in.).
c TORQUE the four screws (91) to between 0.37 and 0.28 m.daN (32.74 and 24.78 lbf.in )
.(4) Measure peripheral clearance J1 between the radome and the aircraft structure at:
- 16 points: 1 thru 3, 5 thru 15 and 17 and 18
- 2 points at the top left and right corners of the radome: 4 and 16.
(6) Make sure that peripheral clearance J1 is between +0.5 mm (0.0197 in.) and +3.5 mm (0.1378 in.).
(7) Examine peripheral clearance J1 on all the radome periphery, not only on the report points. If there are out-of-tolerance points between the point positions that the design office gave you, record them in the measurement report.
G. Check of the Seal Compression
(1) Close the radome (102) until the two radome seals (104) touch the aircraft structure (101).
(2) Measure clearance D1.
(3) Fully close the radome (102) (Ref. AMM TASK 53-15-11-410-001).
(4) Make sure that the arrestor pick-up fittings are correctly connected to the bonding clips.
(5) Measure clearance D2.
(6) Make sure that:
Subtask 53-15-11-720-054-A (1) Close the radome (102) until the two radome seals (104) touch the aircraft structure (101).
(2) Measure clearance D1.
(3) Fully close the radome (102) (Ref. AMM TASK 53-15-11-410-001).
(4) Make sure that the arrestor pick-up fittings are correctly connected to the bonding clips.
(5) Measure clearance D2.
(6) Make sure that:
- The two radome seals (104) are correctly compressed along their full length.
- The seal compression D1 - D2 is 3 +2 mm or -2 mm (0.1181 +0.0787 in. or -0.0787 in.).
H. Check of the Ohmic Resistance
(1) Make sure that the radome is closed (Ref. AMM TASK 53-15-11-410-001).
(2) Remove a small area (approximately 5 mm2 (0.0078 in.2)) of paint from one stud head of each lightning arrestor to measure the ohmic resistance.
(4) Make sure that the ohmic resistance is correct.
(5) Do a paint touch-up (Ref. AMM TASK 53-15-11-300-001).
Subtask 53-15-11-640-053-A (1) Make sure that the radome is closed (Ref. AMM TASK 53-15-11-410-001).
(2) Remove a small area (approximately 5 mm2 (0.0078 in.2)) of paint from one stud head of each lightning arrestor to measure the ohmic resistance.
NOTE: You can remove a small quantity of paint from the nearest stud of the fuselage, because there is no anti-erosion paint in this area.
(3) Measure the ohmic resistance between the stud head of each lightning arrestor of the radome and the adjacent primary structure (Ref. AMM TASK 20-28-00-869-002). (4) Make sure that the ohmic resistance is correct.
(5) Do a paint touch-up (Ref. AMM TASK 53-15-11-300-001).
I. Application of the Grease
(1) Open the radome (Ref. AMM TASK 53-15-11-010-001).
(2) Clean the mating surface of the stop fittings (41) with Non Aqueous Cleaner-General - - (Material No.08BAA9) and the Textile-Lint free Cotton - (Material No.14SBA1) .
(3) Apply Silicone base Grease-- Paste - (Material No.03JAB1) on the surface of the stop fittings (41) that touches the structure.
(4) Close the radome (Ref. AMM TASK 53-15-11-410-001).
5. Close-up(1) Open the radome (Ref. AMM TASK 53-15-11-010-001).
(2) Clean the mating surface of the stop fittings (41) with Non Aqueous Cleaner-General - - (Material No.08BAA9) and the Textile-Lint free Cotton - (Material No.14SBA1) .
(3) Apply Silicone base Grease-- Paste - (Material No.03JAB1) on the surface of the stop fittings (41) that touches the structure.
(4) Close the radome (Ref. AMM TASK 53-15-11-410-001).
Subtask 53-15-11-160-055-A
A. Cleaning of the Radome
(1) Clean the outer surface of the radome with the Textile-Lint free Cotton - (Material No.14SBA1) made moist with Non Aqueous Cleaner-General - - (Material No.08BAA9) .
Subtask 53-15-11-942-069-A (1) Clean the outer surface of the radome with the Textile-Lint free Cotton - (Material No.14SBA1) made moist with Non Aqueous Cleaner-General - - (Material No.08BAA9) .
B. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the plastic bag from the radome after you replaced the radome and before the first flight.
(3) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(4) Close the radome (Ref. AMM TASK 53-15-11-410-001).
Subtask 53-15-11-865-081-A (1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the plastic bag from the radome after you replaced the radome and before the first flight.
(3) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(4) Close the radome (Ref. AMM TASK 53-15-11-410-001).
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 53-15-11-942-070-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 121VU | COM NAV/RADAR/1 | 5SQ1 | K13 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | COM NAV/RADAR/2 | 5SQ2 | K14 |
D. Close Access
(1) Remove the access platform(s).
(2) Remove the WARNING NOTICE(S).
(1) Remove the access platform(s).
(2) Remove the WARNING NOTICE(S).