Special Detailed Inspection of Lateral Splicing, FR 8, LH/RH
TASK 53-11-00-220-810-A
Special Detailed Inspection of Lateral Splicing, FR 8, LH/RH
Refer to the MPD TASK: 531126-01
SPECIAL DETAILED INSPECTION (HFEC) OF LATERAL SPLICING, FR 8, LH/RH
A. Consumable Materials
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 53-11-00-861-057-A
Subtask 53-11-00-250-063-A
Subtask 53-11-00-420-073-A
[Rev.10 from 2021]
2026.04.02 06:28:45 UTC
Special Detailed Inspection of Lateral Splicing, FR 8, LH/RH
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
CAUTION:
DO NOT APPLY TEMPORARY PROTECTION SYSTEM (TPS) ON THE INSPECTION AREA. IF YOU APPLY TPS ON THE INSPECTION AREA, YOU CAN CAUSE DAMAGE TO THE AIRCRAFT.
ZONE: 210
1. Reason for the JobRefer to the MPD TASK: 531126-01
SPECIAL DETAILED INSPECTION (HFEC) OF LATERAL SPLICING, FR 8, LH/RH
NOTE: The effectivity of this task is "ALL". To know if this task is applicable to your aircraft, refer to the MPD task applicability.
2. Job Set-up InformationA. Consumable Materials
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.08BAA9) | Non Aqueous Cleaner-General - - |
| (Material No.14SBA1) | Textile-Lint free Cotton - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 210 | CKPT,FWD COMPT BHD TO FLT COMPT BULKHEAD |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 21-21-46-000-803-A | Removal of the Air-Outlet Distribution Valves |
| TASK 21-21-46-400-803-A | Installation of the Air-Outlet Distribution Valves |
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 25-13-41-000-002-A | Removal of the Sidewall Panels |
| TASK 25-13-41-400-002-A | Installation of the Sidewall Panels |
| TASK 25-80-00-000-001-A | Removal of the Insulation Blankets |
| TASK 25-80-00-400-001-A | Installation of the Insulation Blankets |
| TASK 51-78-00-916-001-A | Application of Temporary Protection System (TPS) |
| NTM 531126 | |
| SRM 511100 | (for corrective action) |
| SRM 512200 | (for corrective action) |
Subtask 53-11-00-861-057-A
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
Subtask 53-11-00-010-117-A (1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
B. Get Access
(1) Remove the applicable sidewall panels at FR8 to get access to the inspection area (Ref. AMM TASK 25-13-41-000-002).
Subtask 53-11-00-020-076-A (1) Remove the applicable sidewall panels at FR8 to get access to the inspection area (Ref. AMM TASK 25-13-41-000-002).
C. Removal of the Components
(1) If the air-outlet distribution valve is installed at FR8, remove it (Ref. AMM TASK 21-21-46-000-803).
(2) Remove the applicable insulation blankets at FR8 to get access to the inspection area (Ref. AMM TASK 25-80-00-000-001).
Subtask 53-11-00-110-136-A (1) If the air-outlet distribution valve is installed at FR8, remove it (Ref. AMM TASK 21-21-46-000-803).
(2) Remove the applicable insulation blankets at FR8 to get access to the inspection area (Ref. AMM TASK 25-80-00-000-001).
D. Preparation of the Inspection Area
(1) Make sure that the inspection area is sufficiently clean to do a satisfactory inspection of the area.
(2) If not, clean the inspection area with Non Aqueous Cleaner-General - - (Material No.08BAA9) and the Textile-Lint free Cotton - (Material No.14SBA1) .
(3) Make sure that there is no TPS layer and if there is a TPS layer, remove it (Ref. AMM TASK 51-78-00-916-001).
4. Procedure(1) Make sure that the inspection area is sufficiently clean to do a satisfactory inspection of the area.
(2) If not, clean the inspection area with Non Aqueous Cleaner-General - - (Material No.08BAA9) and the Textile-Lint free Cotton - (Material No.14SBA1) .
(3) Make sure that there is no TPS layer and if there is a TPS layer, remove it (Ref. AMM TASK 51-78-00-916-001).
Subtask 53-11-00-250-063-A
A. Inspection
(1) Do a special detailed inspection of the structure of the splices at FR8, on the left and right sides, for damage or discontinuities NTM 531126.
(2) Make a report of the damage after the NTM inspection:
(a) Corrosion:
5. Close-up(1) Do a special detailed inspection of the structure of the splices at FR8, on the left and right sides, for damage or discontinuities NTM 531126.
(2) Make a report of the damage after the NTM inspection:
(a) Corrosion:
- If you find corrosion, refer to the Structural Repair Manual SRM 512200 for the corrosion types, inspection, removal and subsequent corrosion protection.
- If you find this type of damage, refer to the Structural Repair Manual SRM 511100 for damage types, classification and corrective action.
Subtask 53-11-00-420-073-A
A. Installation of the Components
(1) Install the applicable insulation blankets at FR8 (Ref. AMM TASK 25-80-00-400-001).
(2) If you removed the air-outlet distribution valve, install it at FR8 (Ref. AMM TASK 21-21-46-400-803).
Subtask 53-11-00-410-117-A (1) Install the applicable insulation blankets at FR8 (Ref. AMM TASK 25-80-00-400-001).
(2) If you removed the air-outlet distribution valve, install it at FR8 (Ref. AMM TASK 21-21-46-400-803).
B. Close Access
(1) Install the applicable sidewall panels at FR8 (Ref. AMM TASK 25-13-41-400-002).
(2) Make sure that the work area is clean and clear of tools and other items.
Subtask 53-11-00-862-059-A (1) Install the applicable sidewall panels at FR8 (Ref. AMM TASK 25-13-41-400-002).
(2) Make sure that the work area is clean and clear of tools and other items.
C. Aircraft Maintenance Configuration
(1) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
(1) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
Lateral Splicing at FR8