Detailed Inspection of Forward Face of Pressure Bulkhead, Vertical Angle (Y=675) at Crossing Areas with Horizontal Stiffeners (Z=1 and Z=1329), LH/RH
TASK 53-11-00-210-003-A
Detailed Inspection of Forward Face of Pressure Bulkhead, Vertical Angle (Y=675) at Crossing Areas with Horizontal Stiffeners (Z=1 and Z=1329), LH/RH
Refer to the MPD TASK: 531107-01
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Referenced Information
3. Job Set-up
Subtask 53-11-00-010-052-A
Subtask 53-11-00-220-068-B
Subtask 53-11-00-410-052-A
[Rev.8 from Aug 2017]
2026.04.02 06:28:47 UTC
Detailed Inspection of Forward Face of Pressure Bulkhead, Vertical Angle (Y=675) at Crossing Areas with Horizontal Stiffeners (Z=1 and Z=1329), LH/RH
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
ZONE: 110
1. Reason for the JobNOTE: The effectivity of this task is "ALL". To know if this task is applicable for your aircraft, refer to the MPD task applicability and the weight variant data given in the SRM introduction.
2. Job Set-up InformationA. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 3M (10 FT) |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.08BAA9) | Non Aqueous Cleaner-General - - |
| (Material No.14SBA1) | Textile-Lint free Cotton - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 110 | RADOME (NOSE CONE TO FR 1) |
| 110AL |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 34-41-41-000-001-A | Removal of the Wave Guide Assembly |
| TASK 34-41-41-400-001-A | Installation of the Wave Guide Assembly |
| TASK 53-11-41-000-001-A | Removal of the Protective Shields - FR1 |
| TASK 53-11-41-400-001-A | Installation of the Protective Shields - FR1 |
| TASK 53-15-11-010-001-A | Opening of the Radome |
| TASK 53-15-11-410-001-A | Closing of the Radome |
| SRM 51110001 | (for corrective action) |
| SRM 51220001 | (for corrective action) |
Subtask 53-11-00-010-052-A
A. Get Access
(1) Put an ACCESS PLATFORM 3M (10 FT) in position at the zone 110.
(2) Open the radome 110AL (Ref. AMM TASK 53-15-11-010-001).
(3) Remove the wave guide assembly (Ref. AMM TASK 34-41-41-000-001).
(4) Remove the upper protection shield (Ref. AMM TASK 53-11-41-000-001).
Subtask 53-11-00-110-054-A (1) Put an ACCESS PLATFORM 3M (10 FT) in position at the zone 110.
(2) Open the radome 110AL (Ref. AMM TASK 53-15-11-010-001).
(3) Remove the wave guide assembly (Ref. AMM TASK 34-41-41-000-001).
(4) Remove the upper protection shield (Ref. AMM TASK 53-11-41-000-001).
B. Cleaning of the Structure
(1) Clean the inspection area with Non Aqueous Cleaner-General - - (Material No.08BAA9) and a lint-free cotton cloth Textile-Lint free Cotton - (Material No.14SBA1) , if necessary.
4. Procedure(1) Clean the inspection area with Non Aqueous Cleaner-General - - (Material No.08BAA9) and a lint-free cotton cloth Textile-Lint free Cotton - (Material No.14SBA1) , if necessary.
Subtask 53-11-00-220-068-B
A. Inspection
(1) Do a detailed inspection of the structure of the forward face of the pressure bulkhead. This inspection also includes the vertical angles, the horizontal stiffeners and the supports of the honeycomb panels.
(2) Make sure that there is no:
(a) corrosion damage:
if you find corrosion damage, refer to the Structural Repair Manual SRM 51220001 for types, inspection, removal and corrosion protection.
(b) other damage (cracks, scratches, stress, marks, dents, bumps,...):
if you find other damage, refer to the Structural Repair Manual SRM 51110001 for damage classification and corrective action.
5. Close-up(1) Do a detailed inspection of the structure of the forward face of the pressure bulkhead. This inspection also includes the vertical angles, the horizontal stiffeners and the supports of the honeycomb panels.
(2) Make sure that there is no:
(a) corrosion damage:
if you find corrosion damage, refer to the Structural Repair Manual SRM 51220001 for types, inspection, removal and corrosion protection.
(b) other damage (cracks, scratches, stress, marks, dents, bumps,...):
if you find other damage, refer to the Structural Repair Manual SRM 51110001 for damage classification and corrective action.
Subtask 53-11-00-410-052-A
A. Close Access
(1) Install the upper protective shield (Ref. AMM TASK 53-11-41-400-001).
(2) Install the wave guide assembly (Ref. AMM TASK 34-41-41-400-001).
(3) Make sure that the work area is clean and clear of tools and other items.
(4) Close the radome 110AL (Ref. AMM TASK 53-15-11-410-001).
(5) Remove the access platform(s).
(1) Install the upper protective shield (Ref. AMM TASK 53-11-41-400-001).
(2) Install the wave guide assembly (Ref. AMM TASK 34-41-41-400-001).
(3) Make sure that the work area is clean and clear of tools and other items.
(4) Close the radome 110AL (Ref. AMM TASK 53-15-11-410-001).
(5) Remove the access platform(s).
Forward Face of the Forward Pressure Bulkhead