W DOC AIRBUS | AMM A320F

Detailed Inspection of Forward Face of Pressure Bulkhead, Vertical Angle (Y=675) at Crossing Areas with Horizontal Stiffeners (Z=1 and Z=1329), LH/RH


TASK 53-11-00-210-003-A
Detailed Inspection of Forward Face of Pressure Bulkhead, Vertical Angle (Y=675) at Crossing Areas with Horizontal Stiffeners (Z=1 and Z=1329), LH/RH


WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
ZONE: 110
1. Reason for the Job
Refer to the MPD TASK: 531107-01
NOTE: The effectivity of this task is "ALL". To know if this task is applicable for your aircraft, refer to the MPD task applicability and the weight variant data given in the SRM introduction.
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
ACCESS PLATFORM 3M (10 FT)
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.08BAA9)
Non Aqueous Cleaner-General - -
(Material No.14SBA1)
Textile-Lint free Cotton -
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
110
RADOME (NOSE CONE TO FR 1)
110AL
 D. Referenced Information
REFERENCE
DESIGNATION
TASK 34-41-41-000-001-A
Removal of the Wave Guide Assembly
TASK 34-41-41-400-001-A
Installation of the Wave Guide Assembly
TASK 53-11-41-000-001-A
Removal of the Protective Shields - FR1
TASK 53-11-41-400-001-A
Installation of the Protective Shields - FR1
TASK 53-15-11-010-001-A
Opening of the Radome
TASK 53-15-11-410-001-A
Closing of the Radome
SRM 51110001
(for corrective action)
SRM 51220001
(for corrective action)
3. Job Set-up
Subtask 53-11-00-010-052-A
A. Get Access
   (1) Put an ACCESS PLATFORM 3M (10 FT) in position at the zone 110.
   (2) Open the radome 110AL (Ref. AMM TASK 53-15-11-010-001).
   (3) Remove the wave guide assembly (Ref. AMM TASK 34-41-41-000-001).
   (4) Remove the upper protection shield (Ref. AMM TASK 53-11-41-000-001).
Subtask 53-11-00-110-054-A
B. Cleaning of the Structure
   (1) Clean the inspection area with Non Aqueous Cleaner-General - - (Material No.08BAA9) and a lint-free cotton cloth Textile-Lint free Cotton - (Material No.14SBA1) , if necessary.
4. Procedure
Subtask 53-11-00-220-068-B
A. Inspection
   (1) Do a detailed inspection of the structure of the forward face of the pressure bulkhead. This inspection also includes the vertical angles, the horizontal stiffeners and the supports of the honeycomb panels.
   (2) Make sure that there is no:
     (a) corrosion damage:
if you find corrosion damage, refer to the Structural Repair Manual SRM 51220001 for types, inspection, removal and corrosion protection.
     (b) other damage (cracks, scratches, stress, marks, dents, bumps,...):
if you find other damage, refer to the Structural Repair Manual SRM 51110001 for damage classification and corrective action.
5. Close-up
Subtask 53-11-00-410-052-A
A. Close Access
   (1) Install the upper protective shield (Ref. AMM TASK 53-11-41-400-001).
   (2) Install the wave guide assembly (Ref. AMM TASK 34-41-41-400-001).
   (3) Make sure that the work area is clean and clear of tools and other items.
   (4) Close the radome 110AL (Ref. AMM TASK 53-15-11-410-001).
   (5) Remove the access platform(s).
[Rev.8 from Aug 2017] 2026.04.02 06:28:47 UTC