Installation of the Proximity Switches
TASK 52-71-13-400-002-A
Installation of the Proximity Switches
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Referenced Information
3. Job Set-up
Subtask 52-71-13-860-052-A ** ON A/C NOT FOR ALL
Subtask 52-71-13-420-051-A ** ON A/C NOT FOR ALL
Subtask 52-71-13-410-052-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.02 07:24:05 UTC
Installation of the Proximity Switches
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
ZONE: 833
ZONE: 834
ZONE: 843
ZONE: 844
FIN: 19WV1 ** ON A/C NOT FOR ALL
FIN: 19WV2 ** ON A/C NOT FOR ALL
FIN: 21WV1 ** ON A/C NOT FOR ALL
FIN: 21WV2 ** ON A/C NOT FOR ALL
1. Reason for the JobZONE: 834
ZONE: 843
ZONE: 844
FIN: 19WV1 ** ON A/C NOT FOR ALL
FIN: 19WV2 ** ON A/C NOT FOR ALL
FIN: 21WV1 ** ON A/C NOT FOR ALL
FIN: 21WV2 ** ON A/C NOT FOR ALL
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE |
| No specific | Torque wrench: range to between 2 and 0.2 m.daN (176.99 and 17.70 lbf.in ) ![]() |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.14QFB1) | Wire-Locking Dia: 0.8 mm CRES Nickel Alloy - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 833 | EMERGENCY EXITS |
| 834 | EMERGENCY EXITS |
| 843 | EMERGENCY EXITS |
| 844 | EMERGENCY EXITS |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 25-23-47-000-012-A | Removal of the Door Linings of the LH FWD Emergency Exit Door, zone 231 |
| TASK 25-23-47-000-013-A | Removal of the Door Linings of the RH FWD Emergency Exit Door at zone 251 or RH AFT at zone 252 or LH AFT at zone 232. |
| TASK 25-23-47-000-802-A | Removal of the Door Linings of the Emergency Exit, zones 251/252 |
| TASK 25-23-47-400-012-A | Installation of the Door Linings of the LH FWD Emergency Exit Door, zone 231 |
| TASK 25-23-47-400-013-A | Installation of the Door Linings of the RH FWD Emergency Exit Door at zone 251, or RH AFT at zone 252, or LH AFT at zone 232. |
| TASK 25-23-47-400-802-A | Installation of the Door Linings of the Emergency Exit, zones 251/252 |
| TASK 52-22-00-010-001-A | Opening of the Emergency Exit Doors from the Passenger Compartment |
| TASK 52-22-00-410-001-A | Closing of the Emergency Exit Doors from the Passenger Compartment |
| TASK 52-22-00-860-003-A | Special Precaution before Maintenance on the Door Damper and Emergency Operation Cylinder |
| TASK 52-22-00-860-004-A | Special Precaution after Maintenance on the Door Damper and Emergency Operation Cylinder |
| TASK 52-71-00-710-001-A | Operational Test of the Door Warning System |
| TASK 52-71-00-820-007-A | Adjustment of the Proximity Switches of the Emergency Exit Doors with the Doors Checking Tool |
| TASK 52-71-00-820-007-A-01 | Adjustment of the Proximity Switches of the Emergency Exit Doors with the ECAM Display Unit (DU) |
Subtask 52-71-13-860-052-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Make sure that the special precaution of the door damper and emergency operation cylinder is done (Ref. AMM TASK 52-22-00-860-003).
(2) Make sure that the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE is in position below the open emergency exit door (referred to as door) (Ref. AMM TASK 52-22-00-010-001).
(3) Make sure that the door lining is removed (Ref. AMM TASK 25-23-47-000-012) or (Ref. AMM TASK 25-23-47-000-013).
Subtask 52-71-13-860-052-B ** ON A/C NOT FOR ALL (1) Make sure that the special precaution of the door damper and emergency operation cylinder is done (Ref. AMM TASK 52-22-00-860-003).
(2) Make sure that the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE is in position below the open emergency exit door (referred to as door) (Ref. AMM TASK 52-22-00-010-001).
(3) Make sure that the door lining is removed (Ref. AMM TASK 25-23-47-000-012) or (Ref. AMM TASK 25-23-47-000-013).
A. Aircraft Maintenance Configuration
(1) Make sure that the special precaution of the door damper and emergency operation cylinder is done (Ref. AMM TASK 52-22-00-860-003).
(2) Make sure that the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE is in position below the open emergency exit door (referred to as door) (Ref. AMM TASK 52-22-00-010-001).
(3) Make sure that the door lining is removed (Ref. AMM TASK 25-23-47-000-802).
Subtask 52-71-13-865-057-A ** ON A/C NOT FOR ALL (1) Make sure that the special precaution of the door damper and emergency operation cylinder is done (Ref. AMM TASK 52-22-00-860-003).
(2) Make sure that the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE is in position below the open emergency exit door (referred to as door) (Ref. AMM TASK 52-22-00-010-001).
(3) Make sure that the door lining is removed (Ref. AMM TASK 25-23-47-000-802).
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | EIS/SLIDES/ARM AND WARN/FLT | 15WN | P11 |
| 121VU | EIS/SLIDES/ARM AND WARN/GND | 13WN | P10 |
| 121VU | EIS/SDAC1 AND 2/DOOR/DET/PAX | 48WV | P05 |
Subtask 52-71-13-420-051-A ** ON A/C NOT FOR ALL
A. Installation of the Proximity Switch
Proximity Switch / Target Adjustment ** ON A/C NOT FOR ALL
Proximity Switch / Target Adjustment ** ON A/C NOT FOR ALL
(1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Make sure that all the electrical connections are clean and in the correct condition.
(4) Install the proximity sensor (2) as follows:
(a) Put the proximity sensor (2) in position in the attachment bracket (3).
(b) Install the lockwasher (9) and the locknut (8) on the proximity sensor (2).
(c) Make sure that the lockwasher (9) is correctly engaged in the related hole of the attachment bracket (3).
(d) TORQUE the locknut (8) to between 2 and 0.2 m.daN (176.99 and 17.70 lbf.in )
.
14QFB1 Wire-Locking Dia: 0.8 mm CRES Nickel Alloy - .
(f) Remove the CAP-BLANKING from each electrical connector and receptacle.
(g) Connect the connector (1) to the proximity sensor (2).
(5) Install the target (4) as follows:
(a) Install the target (4) on the shaft lever (5).
(b) Install the lockwasher (6) and the locknut (7) on the target (4).
(c) Do not tighten the locknut (7) at this time.
Subtask 52-71-13-820-051-A ** ON A/C NOT FOR ALL
Proximity Switch / Target Adjustment ** ON A/C NOT FOR ALL
Proximity Switch / Target Adjustment ** ON A/C NOT FOR ALL (2) Do an inspection of the component interfaces and the adjacent area.
(3) Make sure that all the electrical connections are clean and in the correct condition.
(4) Install the proximity sensor (2) as follows:
(a) Put the proximity sensor (2) in position in the attachment bracket (3).
(b) Install the lockwasher (9) and the locknut (8) on the proximity sensor (2).
(c) Make sure that the lockwasher (9) is correctly engaged in the related hole of the attachment bracket (3).
(d) TORQUE the locknut (8) to between 2 and 0.2 m.daN (176.99 and 17.70 lbf.in )
. WARNING:
USE PROTECTIVE GOGGLES AND GLOVES WHEN YOU REMOVE OR INSTALL LOCKWIRE. EACH TIME YOU CUT LOCKWIRE, REMOVE AND DISCARD IT IMMEDIATELY. LOOSE LOCKWIRE CAN CUT YOU OR MAKE YOU BLIND, AND/OR CAN CAUSE DAMAGE.
(e) Safety the locknut (8) and the lockwasher (9) with (f) Remove the CAP-BLANKING from each electrical connector and receptacle.
(g) Connect the connector (1) to the proximity sensor (2).
(5) Install the target (4) as follows:
(a) Install the target (4) on the shaft lever (5).
(b) Install the lockwasher (6) and the locknut (7) on the target (4).
(c) Do not tighten the locknut (7) at this time.
B. Adjustment of the Proximity Switch
(1) Do an adjustment of the applicable proximity switch (Ref. AMM TASK 52-71-00-820-007).
Subtask 52-71-13-865-053-A ** ON A/C NOT FOR ALL (1) Do an adjustment of the applicable proximity switch (Ref. AMM TASK 52-71-00-820-007).
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 52-71-13-710-050-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | EIS/SLIDES/ARM AND WARN/FLT | 15WN | P11 |
| 121VU | EIS/SLIDES/ARM AND WARN/GND | 13WN | P10 |
| 121VU | EIS/SDAC1 AND 2/DOOR/DET/PAX | 48WV | P05 |
D. Operational Test
(1) Do an operational test to make sure that the proximity switch operates correctly (Ref. AMM TASK 52-71-00-710-001).
5. Close-up(1) Do an operational test to make sure that the proximity switch operates correctly (Ref. AMM TASK 52-71-00-710-001).
Subtask 52-71-13-410-052-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the door lining at the applicable section of the door (Ref. AMM TASK 25-23-47-400-012) or (Ref. AMM TASK 25-23-47-400-013).
(3) Do the special precaution procedure on the door damper and emergency operation cylinder after work on the door (Ref. AMM TASK 52-22-00-860-004).
(4) Close the emergency exit door (Ref. AMM TASK 52-22-00-410-001).
(5) Remove the access platform(s).
Subtask 52-71-13-410-052-B ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the door lining at the applicable section of the door (Ref. AMM TASK 25-23-47-400-012) or (Ref. AMM TASK 25-23-47-400-013).
(3) Do the special precaution procedure on the door damper and emergency operation cylinder after work on the door (Ref. AMM TASK 52-22-00-860-004).
(4) Close the emergency exit door (Ref. AMM TASK 52-22-00-410-001).
(5) Remove the access platform(s).
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the door lining at the applicable section of the door (Ref. AMM TASK 25-23-47-400-802).
(3) Do the special precaution procedure on the door damper and emergency operation cylinder after work on the door (Ref. AMM TASK 52-22-00-860-004).
(4) Close the emergency exit door (Ref. AMM TASK 52-22-00-410-001).
(5) Remove the access platform(s).
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the door lining at the applicable section of the door (Ref. AMM TASK 25-23-47-400-802).
(3) Do the special precaution procedure on the door damper and emergency operation cylinder after work on the door (Ref. AMM TASK 52-22-00-860-004).
(4) Close the emergency exit door (Ref. AMM TASK 52-22-00-410-001).
(5) Remove the access platform(s).