3. Job Set-up
Subtask 52-51-13-860-050-A
Subtask 52-51-13-420-050-A
Subtask 52-51-13-410-051-A
[Rev.10 from 2021]
2026.04.02 06:28:25 UTC
Installation of the Buzzer in the Cockpit Door Locking System (CDLS)
FIN: 23MQ
1. Reason for the JobSelf Explanatory
2. Job Set-up Information
A. Referenced Information
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 24-42-00-862-001-A | De-energize the Ground Service Network Supplied from the External Power |
| TASK 25-13-41-400-001-A | Installation of the Ceiling Panels |
| TASK 52-51-00-710-001-A | Operational Test of the Routine Access |
Subtask 52-51-13-860-050-A
A. Aircraft Maintenance Configuration
(1) Make sure that the ground service network is energized (Ref. AMM TASK 24-42-00-861-001).
Subtask 52-51-13-865-051-A (1) Make sure that the ground service network is energized (Ref. AMM TASK 24-42-00-861-001).
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | LIGHTING/EMER LT/CKPT/DOME | 1LE | H08 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | LIGHTING/EMER LT/CKPT/DOME | 1LE | H06 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | DOORS/PAX/MONG | 1MQ | T13 |
| ** ON A/C ALL | |||
| 122VU | LIGHTING/CKPT/DOME | 3LE | Y06 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | DOORS CKPT LOCK | 1MQ | T13 |
| 122VU | COCKPIT DOOR LOCK SYSTEM | 1MQ | T13 |
Subtask 52-51-13-420-050-A
A. Installation of the Buzzer
(1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Cut and discard the TIE WRAP(S) to release the disconnect electrical wires from the structure.
(4) Prepare the disconnected electrical wires and make sure that they are clean and in the correct condition.
(5) Put the buzzer (3) in position on the ceiling panel (5).
(6) Install the knurled nut (4) and tighten it with your hand.
(7) Connect the cable terminals (1) and (2) to the buzzer (3).
Subtask 52-51-13-410-050-A (1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Cut and discard the TIE WRAP(S) to release the disconnect electrical wires from the structure.
(4) Prepare the disconnected electrical wires and make sure that they are clean and in the correct condition.
(5) Put the buzzer (3) in position on the ceiling panel (5).
(6) Install the knurled nut (4) and tighten it with your hand.
(7) Connect the cable terminals (1) and (2) to the buzzer (3).
B. Installation of the Ceiling Panel
(1) Install ceiling panel 211HC (5) (Ref. AMM TASK 25-13-41-400-001).
Subtask 52-51-13-865-052-A (1) Install ceiling panel 211HC (5) (Ref. AMM TASK 25-13-41-400-001).
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 52-51-13-710-051-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | LIGHTING/EMER LT/CKPT/DOME | 1LE | H08 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | LIGHTING/EMER LT/CKPT/DOME | 1LE | H06 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | DOORS/PAX/MONG | 1MQ | T13 |
| ** ON A/C ALL | |||
| 122VU | LIGHTING/CKPT/DOME | 3LE | Y06 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | DOORS CKPT LOCK | 1MQ | T13 |
| 122VU | COCKPIT DOOR LOCK SYSTEM | 1MQ | T13 |
D. Operational Test
(1) Do an operational test of the routine access (Ref. AMM TASK 52-51-00-710-001).
5. Close-up(1) Do an operational test of the routine access (Ref. AMM TASK 52-51-00-710-001).
Subtask 52-51-13-410-051-A
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
Subtask 52-51-13-862-050-A (1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the ground support and maintenance equipment, the special and standard tools and all other items.