Operational Check of the Manual Switch Over
TASK 52-51-00-710-009-A
Operational Check of the Manual Switch Over
Refer to the MPD TASK: 525111-03
OPERATIONAL CHECK OF MANUAL SWITCH OVER
2. Job Set-up Information
A. Work Zones and Access Panels
B. Referenced Information
3. Job Set-up
Subtask 52-51-00-860-106-A
Subtask 52-51-00-710-060-A
Subtask 52-51-00-860-107-A
[Rev.10 from 2021]
2026.04.02 06:28:23 UTC
Operational Check of the Manual Switch Over
ZONE: 220
1. Reason for the JobRefer to the MPD TASK: 525111-03
OPERATIONAL CHECK OF MANUAL SWITCH OVER
2. Job Set-up Information
A. Work Zones and Access Panels
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 220 | FWD CAB UTILITY AREAS |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 24-42-00-862-001-A | De-energize the Ground Service Network Supplied from the External Power |
Subtask 52-51-00-860-106-A
A. Aircraft Maintenance Configuration
(1) Make sure that the cockpit door is closed.
(2) Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
Subtask 52-51-00-865-091-A ** ON A/C NOT FOR ALL (1) Make sure that the cockpit door is closed.
(2) Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
B. Make sure that this(these) circuit breaker(s) is(are) closed:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 122VU | DOORS/PAX/MONG | 1MQ | T13 |
| 122VU | CKPT/OVRD SYS/SPLY | 4MQ | S10 |
Subtask 52-51-00-710-060-A
A. Operational Test of the Manual Switch Over
(1) Do the operational test to make sure that:
5. Close-up(1) Do the operational test to make sure that:
- the control unit 28MQ is serviceable
- the OPEN and FAULT lights of the pushbutton switch 27MQ operate correctly
- the back-up system operates satisfactorily.
| ACTION | RESULT |
|---|---|
| 1.On the CKPT DOOR BKUP panel of the Overhead Panel 45VU: | On the CKPT DOOR BKUP panel and on the COCKPIT DOOR panel: |
|
|
| | On the Cockpit Door: |
| |
|
| 2.On the CKPT DOOR BKUP panel of the Overhead Panel 45VU: | |
|
|
| 3.On the Cockpit Door: | On the CKPT DOOR BKUP panel of the Overhead Panel 45VU: |
|
|
| 4.On the CKPT DOOR BKUP panel of the Overhead Panel 45VU: | On the Cockpit Door: |
|
|
| 5.On the Cockpit Door: | On the Cockpit Door: |
|
|
| | On the CKPT DOOR BKUP panel of the Overhead Panel 45VU: |
| |
|
| 6.On the CKPT DOOR BKUP panel of the Overhead Panel 45VU: | On the Cockpit Door: |
|
|
| | |
Subtask 52-51-00-860-107-A
A. Put the aircraft back to the serviceable condition.
(1) Make sure that the work area is clean and clear of tools and other items.
(2) De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).
(1) Make sure that the work area is clean and clear of tools and other items.
(2) De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).