Reactivation of the Electrical Release Strikes
TASK 52-51-00-440-010-A
Reactivation of the Electrical Release Strikes
1. Reason for the Job
MMEL 52-51-06A
CDLS DOOR RELEASE STRIKE (CATCH, SPRING, SOLENOID, BOLT)
MMEL 52-51-06B
CDLS DOOR RELEASE STRIKE (CATCH, SPRING, SOLENOID, BOLT)
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Referenced Information
3. Job Set-up
Subtask 52-51-00-860-096-A
Subtask 52-51-00-440-055-A
Subtask 52-51-00-860-103-A
[Rev.10 from 2021]
2026.04.02 06:28:22 UTC
Reactivation of the Electrical Release Strikes
1. Reason for the Job
MMEL 52-51-06A
CDLS DOOR RELEASE STRIKE (CATCH, SPRING, SOLENOID, BOLT)
MMEL 52-51-06B
CDLS DOOR RELEASE STRIKE (CATCH, SPRING, SOLENOID, BOLT)
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 52-51-00-710-001-A | Operational Test of the Routine Access |
| TASK 52-51-12-000-001-A | Removal of the Electrical Release Strike |
| TASK 52-51-12-400-001-A | Installation of the Electrical Release Strike |
Subtask 52-51-00-860-096-A
A. Aircraft Maintenance Configuration
(1) Make sure that the aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002).
(2) Make sure that access to the flight compartment is available.
(3) Make sure that the toggle switch 21MQ is set to the NORM position.
Subtask 52-51-00-860-096-B (1) Make sure that the aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002).
(2) Make sure that access to the flight compartment is available.
(3) Make sure that the toggle switch 21MQ is set to the NORM position.
A. Aircraft Maintenance Configuration
(1) Make sure that the aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002).
(2) Make sure that access to the flight compartment is available.
Subtask 52-51-00-865-087-A (1) Make sure that the aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002).
(2) Make sure that access to the flight compartment is available.
B. Open, safety and tag this(these) circuit breaker(s):
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 122VU | DOORS/PAX/MONG | 1MQ | T13 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | DOORS CKPT LOCK | 1MQ | T13 |
| 122VU | COCKPIT DOOR LOCK SYSTEM | 1MQ | T13 |
Subtask 52-51-00-440-055-A
A. Reactivation of the Electrical Release Strike
(1) If removed, install the new electrical release strike (Ref. AMM TASK 52-51-12-400-001).
(2) If not removed, replace the defective electrical release strike (Ref. AMM TASK 52-51-12-000-001) and (Ref. AMM TASK 52-51-12-400-001).
Subtask 52-51-00-865-082-A (1) If removed, install the new electrical release strike (Ref. AMM TASK 52-51-12-400-001).
(2) If not removed, replace the defective electrical release strike (Ref. AMM TASK 52-51-12-000-001) and (Ref. AMM TASK 52-51-12-400-001).
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 52-51-00-710-058-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 122VU | DOORS/PAX/MONG | 1MQ | T13 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | DOORS CKPT LOCK | 1MQ | T13 |
| 122VU | COCKPIT DOOR LOCK SYSTEM | 1MQ | T13 |
C. Operational Test
(1) Do the operational test to make sure that the CDLS operates satisfactorly (Ref. AMM TASK 52-51-00-710-001).
5. Close-up(1) Do the operational test to make sure that the CDLS operates satisfactorly (Ref. AMM TASK 52-51-00-710-001).
Subtask 52-51-00-860-103-A
A. Put the aircraft back to its initial configuration.
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Make sure that the aircraft electrical circuits are de-energized (Ref. AMM TASK 24-41-00-862-002).
(3) Remove the deactivation entry from the aircraft technical log.
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Make sure that the aircraft electrical circuits are de-energized (Ref. AMM TASK 24-41-00-862-002).
(3) Remove the deactivation entry from the aircraft technical log.
Electrical Release Strikes