Installation of the Door of Ground Service Conditioned Air Connection
TASK 52-42-17-400-001-A
Installation of the Door of Ground Service Conditioned Air Connection
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Referenced Information
3. Job Set-up
Subtask 52-42-17-860-050-A
Subtask 52-42-17-420-050-B
Subtask 52-42-17-410-050-A
[Rev.10 from 2021]
2026.04.02 06:28:18 UTC
Installation of the Door of Ground Service Conditioned Air Connection
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
ZONE: 191
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.04TMB2) | Varnish-- Electrical Bonding Structure |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 191 | AIR CONDITIONING COMPT AND FAIRINGS |
| 191CB |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 20-28-00-912-802-A | Electrical Bonding - General Maintenance Procedure |
Subtask 52-42-17-860-050-A
A. Get Access
(1) Make sure that an ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE is in position at zone 191.
4. Procedure(1) Make sure that an ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE is in position at zone 191.
Subtask 52-42-17-420-050-B
A. Installation of the Door of Ground Service Conditioned Air Connection
(1) Put the door (6) in position into its housing on the door frame.
(2) Install the bolts (8) and (9) and the nuts (7).
(3) Tighten the nuts (7).
(4) Do the electrical bonding after you install the bolts (8) and the nuts (7) on each side of the door hinge (Ref. AMM TASK 20-28-00-912-802).
(5) Apply Varnish-- Electrical Bonding Structure (Material No.04TMB2) on the heads of the bolts (8).
(6) Put the end of the spring (2) in position on the fitting (5).
(7) Make sure that the spring (2) is correctly installed between the washers (4).
(8) Tighten the nut (1).
Subtask 52-42-17-210-051-A (1) Put the door (6) in position into its housing on the door frame.
(2) Install the bolts (8) and (9) and the nuts (7).
(3) Tighten the nuts (7).
(4) Do the electrical bonding after you install the bolts (8) and the nuts (7) on each side of the door hinge (Ref. AMM TASK 20-28-00-912-802).
(5) Apply Varnish-- Electrical Bonding Structure (Material No.04TMB2) on the heads of the bolts (8).
(6) Put the end of the spring (2) in position on the fitting (5).
(7) Make sure that the spring (2) is correctly installed between the washers (4).
(8) Tighten the nut (1).
B. Check of the Door Opening/Closing
(1) Open and close the door.
(2) Make sure that the door operates correctly.
5. Close-up(1) Open and close the door.
(2) Make sure that the door operates correctly.
Subtask 52-42-17-410-050-A
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the door 191CB.
(3) Remove the access platform(s).
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the door 191CB.
(3) Remove the access platform(s).
Door of Ground Service Conditioned Air Connection