Installation of the Service Door
TASK 52-42-13-400-001-A
Installation of the Service Door
Self explanatory
2. Job Set-up Information
A. Work Zones and Access Panels
B. Referenced Information
3. Job Set-up
Subtask 52-42-13-860-051-A
Subtask 52-42-13-420-050-B
Subtask 52-42-13-410-051-A
[Rev.10 from 2021]
2026.04.02 07:23:50 UTC
Installation of the Service Door
ZONE: 170
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Work Zones and Access Panels
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 170 | AFT CAB U/FLOOR COMPT AFT BHD OF BULK |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 20-28-00-912-802-A | Electrical Bonding - General Maintenance Procedure |
Subtask 52-42-13-860-051-A
A. Aircraft Maintenance Configuration
(1) Make sure that the access platform is in position at zone 171.
(2) Make sure that the service door 171AL is open.
Subtask 52-42-13-140-050-A (1) Make sure that the access platform is in position at zone 171.
(2) Make sure that the service door 171AL is open.
B. Cleaning
(1) Clean the component interfaces and the adjacent area.
4. Procedure(1) Clean the component interfaces and the adjacent area.
Subtask 52-42-13-420-050-B
A. Installation of the Service Door
(1) Put service door 171AL (1) in position.
(2) Install the springs (2) and the shims (3).
(3) Install the bonding leads (5) and the screws (6).
(4) Install the screws (7).
(5) Tighten the screws (6) and (7).
(6) Install the other end of the bonding leads (5) with the screws (9), washers (8) and nuts (4).
(7) Tighten the nuts (4).
(8) Do an electrical bonding when you install the bonding leads (5), the screws (6) and (9), the washers (8) and the nuts (4) (Ref. AMM TASK 20-28-00-912-802).
5. Close-up(1) Put service door 171AL (1) in position.
(2) Install the springs (2) and the shims (3).
(3) Install the bonding leads (5) and the screws (6).
(4) Install the screws (7).
(5) Tighten the screws (6) and (7).
(6) Install the other end of the bonding leads (5) with the screws (9), washers (8) and nuts (4).
(7) Tighten the nuts (4).
(8) Do an electrical bonding when you install the bonding leads (5), the screws (6) and (9), the washers (8) and the nuts (4) (Ref. AMM TASK 20-28-00-912-802).
Subtask 52-42-13-410-051-A
A. Visual Inspection
(1) Make sure that the work area is clean and clear of tools and other items.
Subtask 52-42-13-410-050-A (1) Make sure that the work area is clean and clear of tools and other items.
B. Close Access
(1) Close the service door 171AL.
Subtask 52-42-13-942-051-A (1) Close the service door 171AL.
C. Remove Ground Equipment
(1) Remove the access platform(s).
(1) Remove the access platform(s).
Service Door 171AL