Removal of the Service Door
TASK 52-42-13-000-001-A
Removal of the Service Door
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 52-42-13-941-053-A
Subtask 52-42-13-020-050-B
[Rev.10 from 2021]
2026.04.02 07:23:49 UTC
Removal of the Service Door
ZONE: 170
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 1M(3 FT) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 170 | AFT CAB U/FLOOR COMPT AFT BHD OF BULK |
| 171AL |
| REFERENCE | DESIGNATION |
|---|---|
Subtask 52-42-13-941-053-A
A. Position Ground Equipment
(1) Put the ACCESS PLATFORM 1M(3 FT) in position at zone 171.
Subtask 52-42-13-010-050-A 4. Procedure(1) Put the ACCESS PLATFORM 1M(3 FT) in position at zone 171.
Subtask 52-42-13-020-050-B
A. Removal of the Service Door
(1) Remove the nuts (4), washers (8) and screws (9).
(2) Hold the service door (1).
(3) Remove the screws (7).
(4) Remove the screws (6) and the bonding leads (5).
(5) Remove the springs (2) and the shims (3).
(6) Remove the service door (1).
(1) Remove the nuts (4), washers (8) and screws (9).
(2) Hold the service door (1).
(3) Remove the screws (7).
(4) Remove the screws (6) and the bonding leads (5).
(5) Remove the springs (2) and the shims (3).
(6) Remove the service door (1).
Service Door 171AL