W DOC AIRBUS | AMM A320F

Installation of the Seal of the Forward Avionics-Compartment Door


TASK 52-41-11-400-003-A
Installation of the Seal of the Forward Avionics-Compartment Door


WARNING: PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
  • THE FLIGHT CONTROLS
  • THE FLIGHT CONTROL SURFACES
  • THE LANDING GEAR AND THE RELATED DOORS
  • COMPONENTS THAT MOVE.
MOVEMENT OF COMPONENTS CAN KILL OR CAUSE INJURY TO PERSONS AND/OR CAN CAUSE DAMAGE TO THE EQUIPMENT.
WARNING: MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING GEAR. THIS WILL PREVENT UNWANTED MOVEMENT OF THE LANDING GEAR, AND THUS POSSIBLE INJURY TO PERSONS AND DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
811
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 52-41-11-000-001-A
Removal of the Avionics-Compartment Forward Door
TASK 52-41-11-400-001-A
Installation of the Avionics-Compartment Forward Door
3. Job Set-up
Subtask 52-41-11-860-053-A
A. Aircraft Maintenance Configuration
   (1) Make sure that an ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position at zone 120.
   (2) Make sure that the forward avionics-compartment door 811 is removed (Ref. AMM TASK 52-41-11-000-001).
   (3) Make sure that the parts retained from the removed component are clean and in the correct condition.
4. Procedure
Subtask 52-41-11-420-053-A
A. Installation of the Seal
   (1) Put the seal (2) in position around the door (1).
   (2) Put the seal-retainers (3) in position. Make sure that the groove of the seal (2) is between the seal-retainers (3) and the door (1).
NOTE: Refer to the marks made during the removal procedure to install the seal-retainers (3) in the correct position.
   (3) Install the 24 washers (5) and the 24 screws (4).
NOTE: Do not fully tighten them at this time.
   (4) Do a visual check of the seal (2) position.
   (5) Slowly tighten the screws (4). Make sure that the pressure of the seal-retainers (3) stays regular.
5. Close-up
Subtask 52-41-11-410-054-A
A. Close Access
   (1) Install the forward avionics-compartment door 811 (Ref. AMM TASK 52-41-11-400-001).
   (2) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
   (3) Remove the access platform(s).
[Rev.10 from 2021] 2026.04.02 06:28:13 UTC