1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
CONTAINER - HYDRAULIC FLUID RESISTANT
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
No specific
AR
TIE WRAP
No specific
Torque wrench: range to between 1.7 and 1.5 m.daN (12.54 and 11.06 lbf.ft ) T
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.02ABA1)
Phosphate Ester Hydraulic Fluid-General Power - -
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
151AW, 242KF, 252BG
 D. Referenced Information
REFERENCE
DESIGNATION
TASK 25-55-11-400-001-A
Installation of the Aft Cargo-Compartment Partition at FR47
TASK 25-55-11-400-002-A
Installation of the Ceiling Panels in the Aft Cargo-Compartment - FR47/FR59
TASK 29-00-00-910-002-A
Safety Procedures of the Hydraulic System
TASK 29-10-00-864-002-A
Depressurize the Yellow Hydraulic System
TASK 29-14-00-614-001-A
Depressurization of the Hydraulic Reservoirs
TASK 29-14-00-614-002-A
Pressurization of the Hydraulic Reservoirs through the Ground Connector
TASK 29-14-00-614-002-A-01
Pressurization of the Hydraulic Reservoirs with the Auxiliary Power Unit (APU)
TASK 29-23-00-860-001-A
Disconnection of the Isolation Coupling of the Power Transfer Unit (PTU)
TASK 29-23-00-860-002-A
Connection of the Isolation Coupling of the Power Transfer Unit (PTU)
TASK 29-24-00-863-001-A
Pressurize the Yellow Hydraulic System with the Electric Pump
TASK 52-30-00-860-001-A
Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump
TASK 52-30-00-860-002-A
Close the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump
TASK 52-36-00-600-001-A
Hydraulic System for the Cargo Compartment Doors - Servicing
TASK 53-00-00-400-801-A-01
Installation of the Floor Panels in the Cabin from FR12 to FR70 (Alternative Installation Procedure - Dry Sealing Concept)
TASK 53-00-00-400-801-A-02
Installation of the Cabin Floor Panels from FR12 to FR70 (Alternative Installation Procedure with the Skyflex Option)
3. Job Set-up
Subtask 52-36-13-860-052-A
A. Aircraft Maintenance Configuration
   (1) Obey the hydraulic safety procedures (Ref. AMM TASK 29-00-00-910-002).
   (2) Make sure that the Yellow hydraulic system is depressurized and put it in the maintenance configuration.
(Ref. AMM TASK 29-10-00-864-002)
   (3) Make sure that the reservoir of the Yellow hydraulic system is depressurized (Ref. AMM TASK 29-14-00-614-001).
   (4) Make sure that the isolation coupling of the Power Transfer Unit (PTU) is disconnected (Ref. AMM TASK 29-23-00-860-001).
   (5) Make sure that the warning notices are in position.
   (6) Make sure that the CONTAINER - HYDRAULIC FLUID RESISTANT is below the double check valve 3717GM.
Subtask 52-36-13-865-051-A
B. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
121VUHYDRAULIC/HYD POWER/Y3803GXN30
** ON A/C NOT FOR ALL
121VUHYDRAULIC/HYD POWER/Y3803GXN31
** ON A/C ALL
122VUDOORS/CARGO1MJT12
123VUY HYD/ELEC/PUMP3802GXAB06
123VUY HYD/ELEC/ELEC PUMP/NORM3801GXAB03
4. Procedure
Subtask 52-36-13-420-050-A
A. Installation of the Double Check Valve 3717GM
CAUTION: USE A SECOND WRENCH TO APPLY COUNTERTORQUE TO THE UNION WHEN YOU DISCONNECT/CONNECT HYDRAULIC LINES ON UNIONS. IF YOU DO NOT USE THE SECOND WRENCH, THERE IS A RISK THAT YOU WILL LOOSEN OR TIGHTEN THE UNION TOO MUCH.
CAUTION: YOU MUST INSTALL HYDRAULIC TUBES WITH HYDRAULIC FLUID AS LUBRICANT.
   (1) Clean the component interfaces and the adjacent area.
   (2) Do an inspection of the component interfaces and the adjacent area.
   (3) Put the double check valve (6) in position on the bracket (7).
   (4) Install the washer (8) and the nut (9) on the double check valve (6).
   (5) Remove the blanking caps from the line ends and from the ports of the double check valve (6).
   (6) Make sure that the hydraulic line end-fittings are serviceable.
   (7) Apply Phosphate Ester Hydraulic Fluid-General Power - - (Material No.02ABA1) to the treads of the line end fittings.
   (8) Connect the hydraulic lines (1), (2) and (10) on the related ports of the double check valve (6).
   (9) TORQUE the union nuts of the hydraulic lines (1), (2) and (10) to between 1.7 and 1.5 m.daN (12.54 and 11.06 lbf.ft ) T.
   (10) Tighten the nut (9) correctly.
   (11) Put the spray cover halves (3) and (5) on the hydraulic connections and attach both halves with new TIE WRAP (4).
Subtask 52-36-13-860-050-A Subtask 52-36-13-865-052-A
C. Make sure that this(these) circuit breaker(s) is(are) closed:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
121VUHYDRAULIC/HYD POWER/Y3803GXN30
** ON A/C NOT FOR ALL
121VUHYDRAULIC/HYD POWER/Y3803GXN31
** ON A/C ALL
122VUDOORS/CARGO1MJT12
123VUY HYD/ELEC/PUMP3802GXAB06
123VUY HYD/ELEC/ELEC PUMP/NORM3801GXAB03
Subtask 52-36-13-710-050-A
D. Operational Test
   (1) Remove the actuator safety locks and close the cargo door (Ref. AMM TASK 52-30-00-860-002).
   (2) Open and close the cargo door five times to bleed the door hydraulic system (Ref. AMM TASK 52-36-00-600-001).
   (3) Make sure that the cargo door is fully opened and the actuator safety locks are installed after the bleeding procedure.
   (4) Examine the hydraulic connections of the double check valve 3717GM to make sure that there are no leaks.
5. Close-up
Subtask 52-36-13-410-050-A ** ON A/C NOT FOR ALL
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Remove the spillage container from the double check valve 3717GM.
   (3) Install the ceiling panel 151AC in the AFT cargo compartment (Ref. AMM TASK 25-55-11-400-002).
   (4) Remove the actuator safety locks and close the cargo door (Ref. AMM TASK 52-30-00-860-001).
   (5) Remove the access platform(s).
Subtask 52-36-13-410-050-B ** ON A/C NOT FOR ALL
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Remove the spillage container from the double check valve 3717GM.
   (3) Install the partition panel 151AW in the AFT cargo compartment (Ref. AMM TASK 25-55-11-400-001).
   (4) Remove the actuator safety locks and close the cargo door (Ref. AMM TASK 52-30-00-860-001).
   (5) Remove the access platform(s).
Subtask 52-36-13-410-050-C ** ON A/C NOT FOR ALL
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Remove the spillage container from the double check valve 3717GM.
   (3) Install the ceiling panel 151EC in the AFT cargo compartment (Ref. AMM TASK 25-55-11-400-002).
   (4) Remove the actuator safety locks and close the cargo door (Ref. AMM TASK 52-30-00-860-001).
   (5) Remove the access platform(s).
Subtask 52-36-13-410-050-E ** ON A/C NOT FOR ALL
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Remove the CONTAINER - HYDRAULIC FLUID RESISTANT from double check valve 3717GM.
   (3) If the ACT is installed, install floor panels 242KF and 252BG (Ref. AMM TASK 53-00-00-400-801).
   (4) If the ACT is not installed, continue as follows:
     (a) Install the partition panel 151AW in the AFT cargo compartment (Ref. AMM TASK 25-55-11-400-001).
     (b) Remove the actuator safety locks and close the cargo door (Ref. AMM TASK 52-30-00-860-001).
     (c) Remove the access platform(s).