W DOC AIRBUS | AMM A320F

Installation of the Lining and Insulation of the Bulk Cargo-Compartment Door


TASK 52-33-13-400-001-A
Installation of the Lining and Insulation of the Bulk Cargo-Compartment Door


CAUTION: IMMEDIATELY AFTER YOU OPEN THE CARGO COMPARTMENT DOOR, RECORD ON THE WORK CARD ON THE DOOR, THE DATE AND TIME WHEN YOU OPENED IT. IF THE CARGO COMPARTMENT DOOR STAYS OPEN FOR 12 HOURS OR MORE, YOU MUST BLEED THE HYDRAULIC SYSTEM RELATED TO IT. IF YOU DO NOT OBEY THESE PRECAUTIONS, THE DOOR CAN CLOSE SUDDENLY WHEN YOU SET THE DOOR TO "CLOSE". THIS CAN CAUSE DAMAGE TO THE DOOR AND TO THE AIRCRAFT STRUCTURE.
ZONE: 827
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
ACCESS PLATFORM 2M (6 FT)
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
827
BULK CARGO COMPARTMENT DOOR
 C. Expendable Parts
FIG.ITEM
DESIGNATION
IPC-CSN
5
INSULATN
AIPC 25-55-04-43-040
5
INSULATN
AIPC 25-55-04-43-050
5
INSULATN
AIPC 25-55-04-43-060
5
INSULATN
AIPC 25-55-04-43-070
6
INSULATN
AIPC 25-55-04-43-080
5
INSULATN
AIPC 25-55-04-43-090
5
INSULATN
AIPC 25-55-04-43-100
5
INSULATN
AIPC 25-55-04-43-110
5
INSULATN
AIPC 25-55-04-43-120
6
INSULATN
AIPC 25-55-04-43-130
5
INSULATN
AIPC 25-55-04-43-140
5
INSULATN
AIPC 25-55-04-43-150
5
INSULATN
AIPC 25-55-04-43-160
5
INSULATN
AIPC 25-55-04-43-170
5
INSULATN
AIPC 25-55-04-43-180
6
INSULATN
AIPC 25-55-04-43-190
6
INSULATN
AIPC 25-55-04-43-200
6
INSULATN
AIPC 25-55-04-43-210
6
INSULATN
AIPC 25-55-04-43-220
5
INSULATN
AIPC 25-55-04-43-230
5
INSULATN
AIPC 25-55-04-43-240
6
INSULATN
AIPC 25-55-04-43-250
6
INSULATN
AIPC 25-55-04-43-260
6
INSULATN
AIPC 25-55-04-43-270
6
INSULATN
AIPC 25-55-04-43-280
6
INSULATN
AIPC 25-55-04-43-290
6
INSULATN
AIPC 25-55-04-43-300
5
INSULATN
AIPC 25-55-04-43-310
5
INSULATN
AIPC 25-55-04-43-320
6
INSULATN
AIPC 25-55-04-43-330
5
INSULATN
AIPC 25-55-04-43-340
5
INSULATN
AIPC 25-55-04-43-350
5
INSULATN
AIPC 25-55-04-43-360
 D. Referenced Information
REFERENCE
DESIGNATION
TASK 52-30-00-860-001-A
Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump
TASK 52-30-00-860-002-A
Close the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump
TASK 52-33-11-100-001-A
Cleaning/Painting of the Bulk Cargo-Compartment Door
TASK 52-33-11-200-001-A
Inspection of the Bulk Cargo-Compartment Door
3. Job Set-up
Subtask 52-33-13-860-051-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Make sure that the ACCESS PLATFORM 2M (6 FT) is in position at the aft cargo-compartment door.
   (2) Make sure that the aft cargo-compartment door is opened (Ref. AMM TASK 52-30-00-860-001).
   (3) Make sure that the divider net and the door net are removed.
4. Procedure
Subtask 52-33-13-210-050-A ** ON A/C NOT FOR ALL
A. Preparation for Installation
   (1) Examine the interspaces and the inner skin of the Bulk cargo door for damage (Ref. AMM TASK 52-33-11-200-001).
   (2) Make sure that the inner surface of the outer skin is clean before you install the new self-adhesive insulation panels (Ref. AMM TASK 52-33-11-100-001).
   (3) Make sure that the VELCRO tapes (4) are in the correct condition.
Subtask 52-33-13-420-050-E ** ON A/C NOT FOR ALL
B. Installation of the Insulation Panels and the Linings
   (1) Install the new thick-self-adhesive insulation-panels (5) in the applicable interspaces of the door structure:
   (2) Make sure that the thick self-adhesive insulation-panels (5) do not cause a blockage of the rubber flap of the drain hole.
   (3) Install the new thin-self-adhesive insulation-panels (6) in the applicable interspaces:
   (4) Install the linings (1), (2) and (3) on the inner skin of the bulk cargo door and engage the VELCRO tapes (4).
5. Close-up
Subtask 52-33-13-410-050-A ** ON A/C NOT FOR ALL