W DOC AIRBUS | AMM A320F

Installation of the Vent Door


TASK 52-32-22-400-001-A
Installation of the Vent Door


WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
CAUTION: IMMEDIATELY AFTER YOU OPEN THE CARGO COMPARTMENT DOOR, RECORD ON THE WORK CARD ON THE DOOR, THE DATE AND TIME WHEN YOU OPENED IT. IF THE CARGO COMPARTMENT DOOR STAYS OPEN FOR 12 HOURS OR MORE, YOU MUST BLEED THE HYDRAULIC SYSTEM RELATED TO IT. IF YOU DO NOT OBEY THESE PRECAUTIONS, THE DOOR CAN CLOSE SUDDENLY WHEN YOU SET THE DOOR TO "CLOSE". THIS CAN CAUSE DAMAGE TO THE DOOR AND TO THE AIRCRAFT STRUCTURE.
ZONE: 826
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.12ABC1)
Corrosion Preventive Compound_Water Displacing Soft Film -
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
826
AFT CARGO COMPARTMENT DOOR
 D. Expendable Parts
FIG.ITEM
DESIGNATION
IPC-CSN
17
COTTER PIN
AIPC 52-32-21-45-020
1
COTTER PINS
AIPC 52-32-22-13-140
1
COTTER PINS
AIPC 52-32-22-16-010
17
COTTER PIN
AIPC 52-32-22-16-190
 E. Referenced Information
REFERENCE
DESIGNATION
TASK 12-22-52-640-002-A
Lubrication of Cargo Door
TASK 52-30-00-860-001-A
Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump
TASK 52-30-00-860-002-A
Close the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump
TASK 52-32-11-820-003-A
Adjustment of the Vent Door
TASK 52-32-13-400-001-A
Installation of the Lining and Insulation
F Vent Door ** ON A/C NOT FOR ALL
F Vent Door ** ON A/C NOT FOR ALL
F Vent Door ** ON A/C NOT FOR ALL
F Vent Door ** ON A/C NOT FOR ALL
3. Job Set-up
Subtask 52-32-22-860-050-A
A. Aircraft Maintenance Configuration
   (1) Make sure that the AFT cargo-compartment door (referred to as cargo door) is opened and safetied with the actuator safety locks (Ref. AMM TASK 52-30-00-860-001).
   (2) Make sure that the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE in position below the opened cargo door.
   (3) Make sure that the lining and insulation are removed from the inner side of the cargo door.
Subtask 52-32-22-865-051-A
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
121VUHYDRAULIC/HYD POWER/Y3803GXN30
** ON A/C NOT FOR ALL
121VUHYDRAULIC/HYD POWER/Y3803GXN31
** ON A/C ALL
122VUDOORS/CARGO1MJT12
123VUY HYD/ELEC/PUMP3802GXAB06
123VUY HYD/ELEC/ELEC PUMP/NORM3801GXAB03
4. Procedure
Subtask 52-32-22-420-050-B ** ON A/C NOT FOR ALL
A. Installation of the Vent Door
F Vent Door ** ON A/C NOT FOR ALL
F Vent Door ** ON A/C NOT FOR ALL
   (1) Put the vent door (10) in position on the vent door frame.
   (2) Install the bolt (8), the washer (3) and the bush (9) to attach the vent door (10) to the upper hinge bracket.
   (3) Install the bolt (8) and the nut (2) to attach the vent door temporarily to the lower hinge bracket.
   (4) Adjust the upper and lower clearances between the vent door (10) and the vent door frame as follows:
     (a) Put the vent door (10) in the middle of the opening so that the clearance is between 1.0 mm (0.0394 in.) and 3.0 mm (0.1181 in.).
     (b) Measure the clearance between the lower hinge bracket and the lower hinge arm to get the thickness of the shim set.
     (c) Remove the nut (2) and the bolt (8) from the lower hinge bracket.
     (d) Install the shim set of washers (4) with the correct thickness between the lower hinge brackets and the lower hinge arm.
   (5) Install the sleeves (5) and the springs (6) and (7) to the bolts (8).
   (6) Install the bolt (8) and the washer (3) to the lower hinge bracket.
   (7) Install the remaining washers (3) and (4) and the nuts (2) to the bolts (8).
   (8) Tighten the nuts (2) and safety them with the new AIPC 52-32-22-16-010 COTTER PINS (1).
   (9) Install the springs (6) and (7) to the spring bolts (21) and the fittings of the vent door frame.
   (10) Install the connection rod (13) to the vent door (10) as follows:
     (a) Put the connection rod (13) to the actuator arm.
     (b) Install the bolt (11) together with the washers (12) and (15), the bush (14) and the nut (16).
     (c) Tighten the nut (16) and safety it with the new
AIPC 52-32-22-16-190 COTTER PIN (17).
   (11) Put the cover assy (20) to the brackets of the cargo door and attach it with the bolts (18), the washers (19) and the nuts (21).
Subtask 52-32-22-420-050-C ** ON A/C NOT FOR ALL
A. Installation of the Vent Door
F Vent Door ** ON A/C NOT FOR ALL
F Vent Door ** ON A/C NOT FOR ALL
   (1) Put the vent door (10) in position on the vent door frame.
   (2) Install the bolt (8), the washer (3) and the bush (9) to attach the vent door (10) to the upper hinge bracket.
   (3) Install the bolt (8) and the nut (2) to attach the vent door temporarily to the lower hinge bracket.
   (4) Adjust the upper and lower clearances between the vent door (10) and the vent door frame as follows:
     (a) Put the vent door (10) in the middle of the opening so that the clearance is between 1.0 mm (0.0394 in.) and 3.0 mm (0.1181 in.).
     (b) Measure the clearance between the lower hinge bracket and the lower hinge arm to get the thickness of the shim set.
     (c) Remove the nut (2) and the bolt (8) from the lower hinge bracket.
     (d) Install the shim set of washers (4) with the correct thickness between the lower hinge brackets and the lower hinge arm.
   (5) Install the sleeves (5) and the springs (6) and (7) to the bolts (8).
   (6) Install the bolt (8) and the washer (3) to the lower hinge bracket.
   (7) Install the remaining washers (3) and (4) and the nuts (2) to the bolts (8).
   (8) Tighten the nuts (2) and safety them with the new AIPC 52-32-22-13-140 COTTER PINS (1).
   (9) Install the springs (6) and (7) to the spring bolts (21) and the fittings of the vent door frame.
   (10) Install the connection rod (13) to the vent door (10) as follows:
     (a) Put the connection rod (13) to the actuator arm.
     (b) Install the bolt (11) together with the washers (12) and (15), the bush (14) and the nut (16).
     (c) Tighten the nut (16) and safety it with the new
AIPC 52-32-21-45-020 COTTER PIN (17).
   (11) Put the cover assy (20) to the brackets of the cargo door and attach it with the bolts (18) and the washers (19).
Subtask 52-32-22-710-050-B 5. Close-up
Subtask 52-32-22-865-052-A
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
121VUHYDRAULIC/HYD POWER/Y3803GXN30
** ON A/C NOT FOR ALL
121VUHYDRAULIC/HYD POWER/Y3803GXN31
** ON A/C ALL
122VUDOORS/CARGO1MJT12
123VUY HYD/ELEC/PUMP3802GXAB06
123VUY HYD/ELEC/ELEC PUMP/NORM3801GXAB03
Subtask 52-32-22-410-050-A
B. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Make sure that the springs of the hinge arms are correctly lubricated (Ref. AMM TASK 12-22-52-640-002).
   (3) Apply Corrosion Preventive Compound_Water Displacing Soft Film - (Material No.12ABC1) to all the components of the vent door and to the adjacent cargo door structure.
   (4) Install the removed parts of the lining and insulation (Ref. AMM TASK 52-32-13-400-001).
   (5) Remove the actuator safety locks and close the AFT cargo door (Ref. AMM TASK 52-30-00-860-002).
   (6) Remove the access platform(s).