W DOC AIRBUS | AMM A320F

Detailed Inspection of AFT Cargo Compartment Door, Internal Structure


TASK 52-32-11-200-007-A
Detailed Inspection of AFT Cargo Compartment Door, Internal Structure


WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
ZONE: 826
1. Reason for the Job
Refer to the MPD TASK: 523213-01
DETAILED INSPECTION OF AFT CARGO COMPARTMENT DOOR, INTERNAL STRUCTURE
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.05RDA1)
Adhesive Film Tape-Masking - -
(Material No.08BAA9)
Non Aqueous Cleaner-General - -
(Material No.12ABB1)
Corrosion Preventive Compound-Water Displacing Hard Film -
(Material No.12ABC1)
Corrosion Preventive Compound_Water Displacing Soft Film -
(Material No.14SBA1)
Textile-Lint free Cotton -
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
826
AFT CARGO COMPARTMENT DOOR
 D. Referenced Information
REFERENCE
DESIGNATION
TASK 51-75-12-300-001-A
Repair of Major Paint Damage on Light Alloy and Composite Material
TASK 51-76-11-300-001-A
Repair of the Sealing
TASK 51-78-00-916-001-A
Application of Temporary Protection System (TPS)
TASK 52-30-00-860-001-A
Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump
TASK 52-30-00-860-002-A
Close the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump
TASK 52-31-13-000-001-A
Removal of the Lining and the Insulation
TASK 52-32-13-400-001-A
Installation of the Lining and Insulation
SRM 517300
SRM 517400
SRM 523000
SRM 527300
3. Job Set-up
Subtask 52-32-11-860-062-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Open the AFT cargo door and safety it with the actuator safety locks (Ref. AMM TASK 52-30-00-860-001).
   (2) Put the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE in position below the opened cargo door.
Subtask 52-32-11-865-071-A ** ON A/C NOT FOR ALL
B. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
121VUHYDRAULIC/HYD POWER/Y3803GXN30
122VUDOORS/CARGO1MJT12
123VUY HYD/ELEC/PUMP3802GXAB06
123VUY HYD/ELEC/ELEC PUMP/NORM3801GXAB03
Subtask 52-32-11-010-065-C ** ON A/C NOT FOR ALL
C. Get Access
   (1) Remove the lining and the insulation of the cargo door (Ref. AMM TASK 52-31-13-000-001) to get access to the internal cargo door structure.
   (2) Remove the vent door cover to get access to the cargo door structure adjacent to the vent door.
   (3) Remove the screws, the washers and the access panel from the inner skin of the cargo door.
4. Procedure
Subtask 52-32-11-615-052-A ** ON A/C NOT FOR ALL
A. Cleaning Procedure
   (1) Make sure that the area for inspection is clean. If the inspection area is not clean:
     (a) Clean the area with Non Aqueous Cleaner-General - - (Material No.08BAA9) and a Textile-Lint free Cotton - (Material No.14SBA1) .
   (2) If there is a Temporary Protection System (TPS) layer applied that prevents the inspection of the area, remove the TPS layer (Ref. AMM TASK 51-78-00-916-001).
Subtask 52-32-11-210-058-A ** ON A/C NOT FOR ALL
B. Detailed Inspection of the AFT Cargo Compartment Door, Internal Structure
   (1) Examine the inner side of the outer skin, the edge members, the inner skin and the retainers (of the door seal) for subsequent damage.
     (a) If you find a scratch:
  • determine the extent of the damaged area SRM 523000
  • remove the damage when it is less than the limit SRM 517300.
NOTE: When the scratch is larger than the limit, repair the effected component SRM 523000.
     (b) If you find a dent:
  • find the limits of the damaged area SRM 523000
  • remove the damage when it is less than the limit SRM 527300.
NOTE: When the dent is larger than the limit, repair the effected component SRM 523000.
     (c) If you find corrosion:
  • find the limits of the corroded area SRM 523000
  • remove the damage when it is less than the limit SRM 517400.
NOTE: When the corroded area is larger than the limit, repair the effected component SRM 523000.
   (2) Examine the longitudinal beams, the door frames and the corner fittings of the cargo door (machined parts) for subsequent damage.
     (a) If you find a scratch:
  • find the limits of the damaged area SRM 523000
  • remove the damage when it is less than the limit SRM 517300.
NOTE: When the scratch is outside the limit, repair the effected component SRM 523000.
     (b) If you find a dent:
  • find the limit of the damaged area SRM 523000,
  • remove the damage when it is less than the limit SRM 527300.
NOTE: When the dent is outside the limit, repair the effected component SRM 523000.
     (c) If you find corrosion:
  • find the limits of the corroded area SRM 523000
  • remove the damage when it is less than the limit SRM 517400.
NOTE: When the corroded area is outside the limit, repair the effected component SRM 523000.
Subtask 52-32-11-210-059-C ** ON A/C NOT FOR ALL
C. General Inspection of the Internal Structure of the Cargo Door
   (1) Examine all rivets of the cargo door structure.
     (a) If you find an empty rivet hole, install the rivet with correct sealant.
     (b) If you find damaged or loose rivets, replace them.
   (2) Examine the sealant of all structural components for the correct condition. If necessary, replace the sealant (Ref. AMM TASK 51-76-11-300-001).
   (3) Make sure that all screws and bolts of the internal structure of the cargo door are correctly tightened and not damaged.
   (4) Examine the water drain valves and drain holes of the cargo door to make sure that they are clean and free.
   (5) Make sure that the paint coats of the structural components are in the correct condition (Ref. AMM TASK 51-75-12-300-001).
Subtask 52-32-11-916-052-A ** ON A/C NOT FOR ALL
D. Application of Temporary Protection System (TPS)
   (1) Apply Adhesive Film Tape-Masking - - (Material No.05RDA1) on the items adjacent to the area: the seals, bellows, door mechanisms, proximity switches and fittings.
   (2) If there is a TPS layer, do a check of the condition of the TPS layer (Ref. AMM TASK 51-78-00-916-001).
NOTE: AIRBUS recommends that you always apply a new layer of TPS. This is to make sure that the TPS layer continues to give satisfactory corrosion protection. If you think that the TPS layer is in the correct condition, you can apply a new layer (as a spray) on the layer.
   (3) If the TPS layer is damaged, remove the TPS layer and apply a new layer of Corrosion Preventive Compound_Water Displacing Soft Film - (Material No.12ABC1) or Corrosion Preventive Compound-Water Displacing Hard Film - (Material No.12ABB1) .
   (4) If, before the inspection:
  • there was removal of the TPS layer
    or
  • the inspection area was cleaned with high pressure water, steam, solvents and/or cleaning agents.
     (a) Apply a full new layer of Corrosion Preventive Compound_Water Displacing Soft Film - (Material No.12ABC1) or Corrosion Preventive Compound-Water Displacing Hard Film - (Material No.12ABB1) on the inspection area (Ref. AMM TASK 51-78-00-916-001).
5. Close-up
Subtask 52-32-11-410-065-A ** ON A/C NOT FOR ALL
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Install the vent door cover on the cargo door.
   (3) Install the lining and the insulation of the cargo door (Ref. AMM TASK 52-32-13-400-001).
Subtask 52-32-11-865-072-A ** ON A/C NOT FOR ALL
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
121VUHYDRAULIC/HYD POWER/Y3803GXN30
122VUDOORS/CARGO1MJT12
123VUY HYD/ELEC/PUMP3802GXAB06
123VUY HYD/ELEC/ELEC PUMP/NORM3801GXAB03
Subtask 52-32-11-860-063-A ** ON A/C NOT FOR ALL
C. Put the aircraft back to the serviceable condition.
   (1) Remove the actuator safety locks and close the AFT cargo door (Ref. AMM TASK 52-30-00-860-002).
   (2) Remove the access platform(s).
[Rev.10 from 2021] 2026.04.02 06:27:59 UTC