W DOC AIRBUS | AMM A320F

Installation of the Slide Release Mechanism


TASK 52-22-81-400-802-A
Installation of the Slide Release Mechanism


WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
GOGGLES - PROTECTIVE
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.03FBD1)
Mineral Oil base Grease-General Purpose MoS2 Thickened -
(Material No.06AAC1)
Polysulfide Sealant-General Purpose Interfay -
(Material No.08BBF1)
Non Aqueous Cleaner_- Methyl-Ethyl-Ketone -
(Material No.14SBA1)
Textile-Lint free Cotton -
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
833, 834, 843, 844
 D. Expendable Parts
FIG.ITEM
DESIGNATION
IPC-CSN
22
COTTER PIN
AIPC 52-21-11-80-010
6
COTTER PIN
AIPC 52-21-11-80-010
15
COTTER PIN
AIPC 52-21-11-80-080
21
COTTER PIN
AIPC 52-21-11-80-080
30
LOCK WASHER
AIPC 52-71-84-15-030
 E. Referenced Information
REFERENCE
DESIGNATION
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 24-41-00-862-002-A-02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
TASK 25-23-47-000-803-A
Removal of the Door Lining from the Overwing Emergency Exit
TASK 25-23-47-400-803-A
Installation of the Door Lining on the Overwing Emergency Exit
TASK 25-62-00-081-001-A
Special Precautions after Work on the Offwing Escape-Slide Systems
TASK 25-80-00-000-001-A
Removal of the Insulation Blankets
TASK 25-80-00-400-001-A
Installation of the Insulation Blankets
TASK 52-22-00-010-802-A
Opening of the Overwing Emergency-Exit Door from the Passenger Compartment
TASK 52-22-00-410-802-A
Closing of the Overwing Emergency-Exit Door from the Passenger Compartment
TASK 52-22-00-710-802-A
Operational Check of Escape Slide Release Mechanism
TASK 52-22-00-820-802-A
Adjustment of the Overwing Emergency-Exit Door
TASK 52-71-00-820-805-A
Adjustment of the Proximity Switches of the Overwing Emergency-Exit Door
3. Job Set-up
Subtask 52-22-81-860-054-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Make sure that the aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002).
   (2) Make sure that applicable overwing emergency-exit door 833 ( 843) or 834 ( 844) is open (Ref. AMM TASK 52-22-00-010-802).
   (3) Make sure that the lining of the overwing emergency-exit door is removed (Ref. AMM TASK 25-23-47-000-803).
   (4) Make sure that the applicable insulation is removed (Ref. AMM TASK 25-80-00-000-001).
Subtask 52-22-81-865-054-A ** ON A/C NOT FOR ALL
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
121VUEIS/SLIDES/ARM AND WARN/FLT15WNP11
121VUEIS/SLIDES/ARM AND WARN/GND13WNP10
121VUEIS/SDAC1 AND 2/DOOR/DET/PAX48WVP05
122VUFLIGHT LOCK OWD40WNU16
Subtask 52-22-81-910-051-A ** ON A/C NOT FOR ALL
C. Preparation for installation
   (1) Do an inspection of the component interfaces and the adjacent area.
   (2) Make sure that the parts retained from the removed component are clean and in the correct condition.
4. Procedure
Subtask 52-22-81-420-051-A ** ON A/C NOT FOR ALL
A. Installation of the Slide Release Mechanism
   (1) Installation of the shaft lever (1):
     (a) Install the shaft lever (1) in the structure (2).
     (b) Apply a layer of Polysulfide Sealant-General Purpose Interfay - (Material No.06AAC1) on the mating surfaces between the locking plate (9) and the structure (2).
     (c) Put the locking plate (9) in the correct position.
     (d) Install the bolt (10) soaked in Polysulfide Sealant-General Purpose Interfay - (Material No.06AAC1) , the washer (8) and the nut (7).
     (e) Tighten the nut (7).
     (f) Make sure that the shaft lever (1) can easily turn.
   (2) Installation of the rod (16):
     (a) Put the rod (16) in position at the lever assembly (29).
     (b) Install the bolts (11) and (17) and the washers (12) and (18).
     (c) Install the washers (13) and (19) and the nuts (14) and (20).
     (d) Tighten the nuts (14) and (20).
     (e) Safety the nuts (14) and (20) with the new AIPC 52-21-11-80-080 COTTER PIN (15) and the new AIPC 52-21-11-80-080 COTTER PIN (21).
   (3) Installation of the shaft (27):
WARNING: BE CAREFUL WHEN YOU REMOVE OR INSTALL THE SPRING. THE TENSION IN THE SPRING CAN CAUSE INJURY TO PERSONS.
     (a) Apply a layer of Polysulfide Sealant-General Purpose Interfay - (Material No.
06AAC1) on the two ends with thread of the shaft (27).
     (b) Installation of the spring (28) in the shaft lever (1):
       1 Put on the GOGGLES - PROTECTIVE when you install the spring.
       2 Install the spring (28) in the shaft lever (1).
NOTE: There is a risk to lose the spring.
     (c) Install the shaft (27) in the shaft lever (1).
     (d) Installation of the target (26) on the lever (25):
       1 Clean the mating surfaces between the lever (25) and the target (26) with Non Aqueous Cleaner_- Methyl-Ethyl-Ketone - (Material No.08BBF1) and the Textile-Lint free Cotton - (Material No.14SBA1) .
       2 Install the new AIPC 52-71-84-15-030 LOCK WASHER (30) and the nut (31) on the target (26).
       3 Apply a layer of Mineral Oil base Grease-General Purpose MoS2 Thickened - (Material No.
03FBD1) on the thread of the target (26).
       4 Install the target (26), the nut (31) and the lock washer (30) on the lever (25).
       5 Do the adjustment of the target (26) (Ref. AMM TASK 52-71-00-820-805).
     (e) Put the levers (3) and (25) in the correct position.
     (f) Install the washers (4) and (24) and the nuts (5) and (23) on the end of the shaft (27).
     (g) Tighten the nuts (5) and (23).
     (h) Safety the nuts (5) and (23) with the new AIPC 52-21-11-80-010 COTTER PIN (6) and the new AIPC 52-21-11-80-010 COTTER PIN (22).
Subtask 52-22-81-820-050-A ** ON A/C NOT FOR ALL Subtask 52-22-81-865-055-A ** ON A/C NOT FOR ALL
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
121VUEIS/SLIDES/ARM AND WARN/FLT15WNP11
121VUEIS/SLIDES/ARM AND WARN/GND13WNP10
121VUEIS/SDAC1 AND 2/DOOR/DET/PAX48WVP05
122VUFLIGHT LOCK OWD40WNU16
Subtask 52-22-81-720-050-A ** ON A/C NOT FOR ALL
D. Functional Test
   (1) Do a functional test to make sure that the slide release mechanism operates correctly (Ref. AMM TASK 52-22-00-710-802).
   (2) Do a check of the slide release mechanism and make sure that:
  • The nuts (5) and (23) are safetied with the cotter pins (6) and (22).
  • The nuts (14) and (20) are safetied with the cotter pins (15) and (21).
  • The spring (28) is installed in the shaft lever (1).
5. Close-up
Subtask 52-22-81-410-051-A ** ON A/C NOT FOR ALL
A. Close Access
   (1) Make sure that the overwing emergency-exit door is disarmed (Ref. AMM TASK 52-22-00-710-802).
   (2) Close the overwing emergency-exit door from the passenger compartment side (Ref. AMM TASK 52-22-00-410-802).
   (3) Make sure that the work area is clean and clear of tools and other items.
   (4) Install the removed insulation (Ref. AMM TASK 25-80-00-400-001).
   (5) Make sure that the overwing door is armed (Ref. AMM TASK 52-22-00-710-802).
   (6) Install the lining of the overwing emergency-exit door (Ref. AMM TASK 25-23-47-400-803).
   (7) Obey the special precautions after you work on the offwing escape-slide systems (Ref. AMM TASK 25-62-00-081-001).
Subtask 52-22-81-860-055-A ** ON A/C NOT FOR ALL
B. Aircraft Maintenance Configuration
   (1) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).