W DOC AIRBUS | AMM A320F

Installation of the Flight Lock Actuator (FLA)


TASK 52-22-71-400-801-A
Installation of the Flight Lock Actuator (FLA)


WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
FIN: 30WN1 ** ON A/C NOT FOR ALL
FIN: 30WN2 ** ON A/C NOT FOR ALL
FIN: 30WN3 ** ON A/C NOT FOR ALL
FIN: 30WN4 ** ON A/C NOT FOR ALL
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
Torque wrench: range to between 4.5 and 3.7 m.N (39.82 and 32.74 lbf.in ) T
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.04TMB2)
Varnish-- Electrical Bonding Structure
(Material No.06ACA1)
Polysulfide Sealant-Low Density Multi Purpose Brushable -
(Material No.06LCG9)
Non Hardening Jointing Putty-Medium Temp. Area - -
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
833, 834, 843, 844
 D. Referenced Information
REFERENCE
DESIGNATION
TASK 20-28-00-912-802-A
Electrical Bonding - General Maintenance Procedure
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 24-41-00-862-002-A-02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
TASK 25-23-47-000-803-A
Removal of the Door Lining from the Overwing Emergency Exit
TASK 25-23-47-400-803-A
Installation of the Door Lining on the Overwing Emergency Exit
TASK 52-22-00-410-802-A
Closing of the Overwing Emergency-Exit Door from the Passenger Compartment
TASK 52-22-00-710-804-A
Operational Check of the Flight Lock Actuator (FLA)
3. Job Set-up
Subtask 52-22-71-860-052-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Make sure that the aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002).
   (2) Make sure that applicable overwing emergency door 833 ( 843) or 834 ( 844) is closed, latched and locked (Ref. AMM TASK 52-22-00-410-802).
   (3) Make sure that the door lining of the applicable overwing emergency door is removed (Ref. AMM TASK 25-23-47-000-803).
Subtask 52-22-71-865-057-A ** ON A/C NOT FOR ALL
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
121VUEIS/SDAC1 AND 2/DOOR/DET/PAX48WVP05
122VUFLIGHT LOCK OWD40WNU16
Subtask 52-22-71-910-050-A ** ON A/C NOT FOR ALL
C. Preparation for Installation
F Flight Lock Actuator (FLA) ** ON A/C NOT FOR ALL
   (1) Do an inspection of the component interfaces and the adjacent area.
   (2) Make sure that the parts retained from the removed component are clean and in the correct condition.
   (3) Apply Non Hardening Jointing Putty-Medium Temp. Area - - (Material No.06LCG9) on the thread of the screws (2) and (6).
4. Procedure
Subtask 52-22-71-420-052-A ** ON A/C NOT FOR ALL
A. Installation of the FLA
   (1) Put the FLA (1) in the correct position on the frame (4):
     (a) Align the FLA (1) with the shaft hole (5) from the frame (4).
     (b) Adjust the FLA (1) to align it with the guide pins (3) and push it in the installation position.
   (2) TORQUE the screws (2) and (6) to between 4.5 and 3.7 m.N (39.82 and 32.74 lbf.in ) T.
   (3) Do the electrical bonding of the FLA (1) at the screw (6) (
Ref. AMM TASK 20-28-00-912-802):
     (a) Apply Polysulfide Sealant-Low Density Multi Purpose Brushable - (Material No.06ACA1) and Varnish-- Electrical Bonding Structure (Material No.04TMB2) on the head of the screw (6).
   (4) Remove the CAP-BLANKING from each electrical connector and receptacle.
   (5) Make sure that all the electrical connections are clean and in the correct condition.
   (6) Connect the electrical connector (7) to the FLA (1).
Subtask 52-22-71-865-058-A ** ON A/C NOT FOR ALL
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
121VUEIS/SDAC1 AND 2/DOOR/DET/PAX48WVP05
122VUFLIGHT LOCK OWD40WNU16
Subtask 52-22-71-710-057-A ** ON A/C NOT FOR ALL
C. Operational Check
   (1) Do the operational check of the FLA (1) (Ref. AMM TASK 52-22-00-710-804).
5. Close-up
Subtask 52-22-71-410-052-A ** ON A/C NOT FOR ALL
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Install the lining of the applicable overwing emergency door 833 ( 843) or 834 ( 844) (Ref. AMM TASK 25-23-47-400-803).
Subtask 52-22-71-860-056-A ** ON A/C NOT FOR ALL
B. Aircraft Maintenance Configuration
   (1) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
   (2) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
[Rev.10 from 2021] 2026.04.02 06:27:46 UTC