Replacement of the Charging Valve and Percussion Mechanism Seals
TASK 52-22-00-860-005-A
Replacement of the Charging Valve and Percussion Mechanism Seals
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Expendable Parts
E. Referenced Information
3. Job Set-up
Subtask 52-22-00-861-054-A ** ON A/C NOT FOR ALL Subtask 52-22-00-865-066-A ** ON A/C NOT FOR ALL
Subtask 52-22-00-020-052-A ** ON A/C NOT FOR ALL
Subtask 52-22-00-860-089-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.02 06:27:36 UTC
Replacement of the Charging Valve and Percussion Mechanism Seals
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.02BBB9) | Mineral Hydraulic Fluid-Damper - - |
| (Material No.14QFB1) | Wire-Locking Dia: 0.8 mm CRES Nickel Alloy - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 833 | EMERGENCY EXITS |
| 834 | EMERGENCY EXITS |
| 835 | MID PASSENGER/CREW DOOR |
| 843 | EMERGENCY EXITS |
| 844 | EMERGENCY EXITS |
| 845 | MID PASSENGER/CREW DOOR |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 5 | SHEAR PIN | AIPC 52-22-14-01-030 |
| 16 | PACKINGS | AIPC 52-22-14-01-070 |
| 15 | SEAL | AIPC 52-22-14-01-080 |
| 9 | PACKING | AIPC 52-22-14-01-110 |
| 9 | PACKING | AIPC 52-22-14-01-140 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 24-42-00-862-001-A | De-energize the Ground Service Network Supplied from the External Power |
| TASK 52-22-00-010-001-A | Opening of the Emergency Exit Doors from the Passenger Compartment |
| TASK 52-22-00-410-001-A | Closing of the Emergency Exit Doors from the Passenger Compartment |
| TASK 52-22-00-614-002-A | Charging of the Door Damper and Emergency Operation Cylinders at the Emergency Exit Doors |
Subtask 52-22-00-861-054-A ** ON A/C NOT FOR ALL Subtask 52-22-00-865-066-A ** ON A/C NOT FOR ALL
B. Open, safety and tag this(these) circuit breaker(s):
Subtask 52-22-00-010-076-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | EIS/SLIDES/ARM AND WARN/FLT | 15WN | P11 |
| 121VU | EIS/SLIDES/ARM AND WARN/GND | 13WN | P10 |
| 121VU | EIS/SDAC1 AND 2/DOOR/DET/PAX | 48WV | P05 |
C. Get Access
(1) Open the applicable emergency exit door (referred to as the door) (Ref. AMM TASK 52-22-00-010-001).
(2) Make sure that the ACCESS PLATFORM 5M (16 FT)- ADJUSTABLE is in position below the applicable door.
Subtask 52-22-00-860-087-A ** ON A/C NOT FOR ALL (1) Open the applicable emergency exit door (referred to as the door) (Ref. AMM TASK 52-22-00-010-001).
(2) Make sure that the ACCESS PLATFORM 5M (16 FT)- ADJUSTABLE is in position below the applicable door.
D. Aircraft Maintenance Configuration
(1) Make sure that the rigging pin (4) is correctly installed in the percussion mechanism.
(2) Remove and discard the shear pin (5).
(3) Set the release lever (3) as follows:
(a) Remove and discard the lockwire from the knurled screw (2).
(b) Loosen the knurled screw (2) sufficiently until you can move the release lever (3).
(c) Move the release lever (3) rearward until it is free from the guide (6).
(d) Turn the release lever (3) through 90 degrees clockwise to get access to the striker assembly (17).
(e) Tighten the knurled screw (2) sufficiently to safety the release lever (3).
(4) Remove the dust cap (11) from the pressure charging valve (10).
(5) Operate the pressure charging valve (10) until the door damper and emergency operation cylinder (1) is fully depressurized.
4. Procedure(1) Make sure that the rigging pin (4) is correctly installed in the percussion mechanism.
(2) Remove and discard the shear pin (5).
(3) Set the release lever (3) as follows:
(a) Remove and discard the lockwire from the knurled screw (2).
(b) Loosen the knurled screw (2) sufficiently until you can move the release lever (3).
(c) Move the release lever (3) rearward until it is free from the guide (6).
(d) Turn the release lever (3) through 90 degrees clockwise to get access to the striker assembly (17).
(e) Tighten the knurled screw (2) sufficiently to safety the release lever (3).
(4) Remove the dust cap (11) from the pressure charging valve (10).
(5) Operate the pressure charging valve (10) until the door damper and emergency operation cylinder (1) is fully depressurized.
Subtask 52-22-00-020-052-A ** ON A/C NOT FOR ALL
A. Removal of the Percussion Mechanism Seal (15) and the Packings (16)
(a) Remove the screws (18) from the striker assembly (17).
(b) Carefully remove the striker assembly (17) from the housing assembly (8).
(c) Remove the diaphragm (14), the spacer (12) and the spring (13) from the striker assembly (17).
(d) Remove and discard the packings (16) from the striker assembly (17).
(e) Remove and discard the seal (15) from the striker assembly (17).
Subtask 52-22-00-020-053-A ** ON A/C NOT FOR ALL WARNING:
MAKE SURE THAT THE DOOR-DAMPER AND EMERGENCY OPERATION CYLINDER IS FULLY DEPRESSURIZED BEFORE YOU REMOVE THE STRIKER ASSEMBLY. IF NOT, REMAINING PRESSURE CAN CAUSE INJURY.
(1) Remove the striker assembly (17) as follows: (a) Remove the screws (18) from the striker assembly (17).
(b) Carefully remove the striker assembly (17) from the housing assembly (8).
(c) Remove the diaphragm (14), the spacer (12) and the spring (13) from the striker assembly (17).
(d) Remove and discard the packings (16) from the striker assembly (17).
(e) Remove and discard the seal (15) from the striker assembly (17).
B. Removal of the Charging Valve Packing (9)
(1) Remove the charging valve (10) from the housing assembly (8).
(2) Remove and discard the packing (9) from the charging valve (10).
Subtask 52-22-00-860-088-A ** ON A/C NOT FOR ALL (1) Remove the charging valve (10) from the housing assembly (8).
(2) Remove and discard the packing (9) from the charging valve (10).
C. Preparation for Installation
(1) Make sure that the parts retained from the removed component are clean and in the correct condition.
(2) Clean the component interfaces and the adjacent area.
(3) Do an inspection of the component interfaces and the adjacent area.
Subtask 52-22-00-420-052-A ** ON A/C NOT FOR ALL (1) Make sure that the parts retained from the removed component are clean and in the correct condition.
(2) Clean the component interfaces and the adjacent area.
(3) Do an inspection of the component interfaces and the adjacent area.
D. Installation of the Percussion Mechanism Seal and the Packings
(2) Install the seal (15) and the packings (16) on the striker assembly (17).
(3) Install the spacer (12), the spring (13) and the diaphragm (14) in the striker assembly (17).
(4) Install the striker assembly (17) into the housing assembly (8) with the screws (18).
(5) Tighten the screws (18).
Subtask 52-22-00-420-053-A ** ON A/C NOT FOR ALL WARNING:
MAKE SURE THAT YOU INSTALL THE CORRECT (ALUMINUM) SHEAR PIN ON THE DOOR-DAMPER PERCUSSION DEVICE.
INSTALLATION OF AN INCORRECT SHEAR PIN WILL PREVENT OPERATION OF THE ACTUATOR IN THE EMERGENCY MODE.
(1) Apply the Mineral Hydraulic Fluid-Damper - - (Material No.02BBB9) on the new AIPC 52-22-14-01-080 SEAL (15) and the new AIPC 52-22-14-01-070 PACKINGS (16). (2) Install the seal (15) and the packings (16) on the striker assembly (17).
(3) Install the spacer (12), the spring (13) and the diaphragm (14) in the striker assembly (17).
(4) Install the striker assembly (17) into the housing assembly (8) with the screws (18).
(5) Tighten the screws (18).
NOTE: When the screws (18) are tight, there is a clearance of between 0.3 mm (0.0118 in.) and 0.4 mm (0.0157 in.) between the striker assembly (17) and the housing assembly (8).
E. Installation of the Charging Valve Packing
(1) Apply the Mineral Hydraulic Fluid-Damper - - (Material No.02BBB9) to the new AIPC 52-22-14-01-110 PACKING (9) or the new AIPC 52-22-14-01-140 PACKING (9).
(2) Install the packing (9) on the charging valve (10).
(3) Install the charging valve (10) into the housing assembly (8).
(4) TORQUE the charging valve (10) to between 3.15 and 2.85 m.daN (23.23 and 21.02 lbf.ft )
.
(5) Install the new AIPC 52-22-14-01-030 SHEAR PIN (5) in the guide (6).
5. Close-up(1) Apply the Mineral Hydraulic Fluid-Damper - - (Material No.02BBB9) to the new AIPC 52-22-14-01-110 PACKING (9) or the new AIPC 52-22-14-01-140 PACKING (9).
(2) Install the packing (9) on the charging valve (10).
(3) Install the charging valve (10) into the housing assembly (8).
(4) TORQUE the charging valve (10) to between 3.15 and 2.85 m.daN (23.23 and 21.02 lbf.ft )
. (5) Install the new AIPC 52-22-14-01-030 SHEAR PIN (5) in the guide (6).
Subtask 52-22-00-860-089-A ** ON A/C NOT FOR ALL
A. Put the system back to the serviceable condition.
(1) Charge the pressure accumulator to the correct pressure (Ref. AMM TASK 52-22-00-614-002).
(2) Set the release lever (3) to its armed position as follows:
(a) Loosen the knurled screw (2) and turn the release lever (3) through 90 degrees (in a counterclockwise direction) until it engages with the guide (6).
(b) Push the release lever (3) forward through the guide (6).
(c) Make sure that the release lever (3) is fully engaged with the guide (6).
(d) Move the release lever (3) fully forward and tighten the knurled screw (2) to hold the release lever (3) in the armed position.
(e) Safety the knurled screw (2) with the lockwire14QFB1 Wire-Locking Dia: 0.8 mm CRES Nickel Alloy - .
(3) Remove the rigging pin (4) from the housing assembly (8).
Subtask 52-22-00-865-067-A ** ON A/C NOT FOR ALL (1) Charge the pressure accumulator to the correct pressure (Ref. AMM TASK 52-22-00-614-002).
(2) Set the release lever (3) to its armed position as follows:
(a) Loosen the knurled screw (2) and turn the release lever (3) through 90 degrees (in a counterclockwise direction) until it engages with the guide (6).
(b) Push the release lever (3) forward through the guide (6).
(c) Make sure that the release lever (3) is fully engaged with the guide (6).
(d) Move the release lever (3) fully forward and tighten the knurled screw (2) to hold the release lever (3) in the armed position.
(e) Safety the knurled screw (2) with the lockwire
(3) Remove the rigging pin (4) from the housing assembly (8).
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 52-22-00-410-066-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | EIS/SLIDES/ARM AND WARN/FLT | 15WN | P11 |
| 121VU | EIS/SLIDES/ARM AND WARN/GND | 13WN | P10 |
| 121VU | EIS/SDAC1 AND 2/DOOR/DET/PAX | 48WV | P05 |
C. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the applicable emergency exit door (Ref. AMM TASK 52-22-00-410-001).
(3) De-energize the ground service network (Ref. AMM TASK 24-42-00-862-001).
(4) Remove the access platform(s).
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the applicable emergency exit door (Ref. AMM TASK 52-22-00-410-001).
(3) De-energize the ground service network (Ref. AMM TASK 24-42-00-862-001).
(4) Remove the access platform(s).
Charging Valve Seal