W DOC AIRBUS | AMM A320F

Installation of the Aft Passenger/Crew-Doors Gust-Lock Control-Mechanism


TASK 52-13-12-400-802-A
Installation of the Aft Passenger/Crew-Doors Gust-Lock Control-Mechanism


ZONE: 832
ZONE: 842
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
832
AFT PASSENGER/CREW DOOR
842
AFT PASSENGER/CREW DOOR
832FZ, 832GZ, 842FZ, 842GZ
 B. Expendable Parts
FIG.ITEM
DESIGNATION
IPC-CSN
7
COTTER PIN
AIPC 52-13-04-08-050
16
COTTER PIN
AIPC 52-13-04-08-183
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
TASK 24-42-00-862-001-A
De-energize the Ground Service Network Supplied from the External Power
TASK 25-23-46-000-002-A
Removal of the Door Linings from the Aft Passenger/Crew Doors
TASK 25-23-46-400-002-A
Installation of the Door Linings on the Aft Passenger/Crew Doors
3. Job Set-up
Subtask 52-13-12-860-052-A
A. Aircraft Maintenance Configuration
   (1) Make sure that the ground service network is energized
(Ref. AMM TASK 24-42-00-861-001).
   (2) Make sure that the linings on the support arms at the aft passenger/crew doors are removed (Ref. AMM TASK 25-23-46-000-002):
Subtask 52-13-12-220-062-A
B. Prepare for the Installation
   (1) Clean the component interfaces and the adjacent area.
   (2) Do an inspection of the component interfaces and the adjacent area.
   (3) Make sure that the parts retained from the removed component are clean and in the correct condition.
4. Procedure
Subtask 52-13-12-420-060-A 5. Close-up
Subtask 52-13-12-420-061-A
Subtask 52-13-12-862-052-A
B. De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).
[Rev.10 from 2021] 2026.04.02 07:21:55 UTC