W DOC AIRBUS | AMM A320F

Replacement of the Bonded Bushes (with Seal Bead)


TASK 52-10-00-915-001-A
Replacement of the Bonded Bushes (with Seal Bead)


WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Consumable Materials
REFERENCE
DESIGNATION
(Material No.03QDB1)
Dry lubricant-Anti Seizing PTFE Loaded -
(Material No.04QAB2)
Coating_- Flexible Structure
(Material No.05ABE1)
Retaining adhesive-Cylindrical fitting Medium strength -
(Material No.05XAB1)
Adhesive Activator-- Anaerobic -
(Material No.06AAB1)
Polysulfide Sealant-General Purpose Fillet -
(Material No.08BAA9)
Non Aqueous Cleaner-General - -
(Material No.14SBA1)
Textile-Lint free Cotton -
 B. Referenced Information
REFERENCE
DESIGNATION
3. Job Set-up
Subtask 52-10-00-869-063-A
A. Not Applicable
4. Procedure
Subtask 52-10-00-020-061-A
A. Removal of the Bushes
   (1) Mechanically remove the bush.
   (2) Make sure that you do not heat the part on which the bush is installed, you can damage the internal structure of the part because it is made of aluminum alloy.
   (3) Clean the part with Non Aqueous Cleaner-General - - (Material No.08BAA9) and a cloth to remove the remaining bonding compound and sealant.
   (4) Dry carefully.
   (5) Make sure that the surface is clean.
Subtask 52-10-00-420-062-A
B. Installation of the Bush
   (1) Cold-curing with an activator.
     (a) Apply Dry lubricant-Anti Seizing PTFE Loaded - (Material No.03QDB1) on the inner side of the bush in order to prevent damage by the sealing compound.
     (b) Apply the Adhesive Activator-- Anaerobic - (Material No.05XAB1) on the areas that you must bond and then apply Retaining adhesive-Cylindrical fitting Medium strength - (Material No.05ABE1) .
     (c) Rotate the bush to insert it.
     (d) The bonded surfaces must not come into contact with your fingers.
     (e) Hold the bush in its hole with a tool.
     (f) Let cure for 4 hours at 23 deg.C (73.40 deg.F).
NOTE: Use the activator in less than 2 minutes.
   (2) Warm-curing without activator
     (a) Apply Dry lubricant-Anti Seizing PTFE Loaded - (Material No.03QDB1) on the inner side of the bush in order to prevent damage by the sealing compound.
     (b) Apply the activator Retaining adhesive-Cylindrical fitting Medium strength - (Material No.05ABE1) on the areas that you must bond.
     (c) Rotate the bush to insert it.
     (d) The bonded surfaces must not come into contact with your fingers.
     (e) Hold the bush in its hole with a tool.
     (f) Let cure for 4 hours at 84 deg.C (183.20 deg.F) with the thermocouples which are in the bush.
Subtask 52-10-00-916-050-A
C. Application of Protection Sealant
   (1) Apply Polysulfide Sealant-General Purpose Fillet - (Material No.06AAB1) on the periphery of the seal between the two parts and use Coating_- Flexible Structure (Material No.04QAB2) to protect the sealant bead in the skydrol areas.
   (2) Remove the protection sealant from the inside of the bush with Textile-Lint free Cotton - (Material No.14SBA1) and Non Aqueous Cleaner-General - - (Material No.08BAA9) .
[Rev.10 from 2021] 2026.04.02 07:22:02 UTC