Cleaning of the Passenger/Crew-Doors Gust-Lock Control-Mechanism
TASK 52-10-00-100-801-A
Cleaning of the Passenger/Crew-Doors Gust-Lock Control-Mechanism
To remove dirt or unwanted material from the components of the passenger/crew- doors gust-lock control-mechanism.
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Referenced Information
3. Job Set-up
Subtask 52-10-00-861-052-A Subtask 52-10-00-010-113-A
Subtask 52-10-00-160-050-A
Subtask 52-10-00-420-069-A
[Rev.10 from 2021]
2026.04.02 06:27:18 UTC
Cleaning of the Passenger/Crew-Doors Gust-Lock Control-Mechanism
WARNING:
DO NOT OPEN THE PASSENGER/CREW DOOR IF THE WIND SPEED IS MORE THAN 65 KNOTS.
WARNING:
BEFORE YOU START WORK ON THE DOOR, MAKE SURE THAT:
- THE EMERGENCY CONTROL HANDLE IS IN THE DISARMED POSITION WITH THE SAFETY PIN INSTALLED.
- THE PERCUSSION LEVER OF THE DOOR-DAMPER AND EMERGENCY-OPERATION CYLINDER IS IN THE DISARMED POSITION WITH THE SAFETY PIN INSTALLED.
WARNING:
STOP THE OPENING PROCEDURE IF THE RED WARNING LIGHT FLASHES. IF THE RED WARNING LIGHT FLASHES, REMAINING PRESSURE CAN CAUSE THE DOOR TO OPEN SUDDENLY AND CAN:
- KILL OR CAUSE SERIOUS INJURY TO PERSONS
- CAUSE DAMAGE TO THE AIRCRAFT.
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
1. Reason for the JobTo remove dirt or unwanted material from the components of the passenger/crew- doors gust-lock control-mechanism.
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE |
| No specific | 1 | AIR SOURCE FILTERED, DRY |
| No specific | 1 | BRUSH - BRISTLED |
| No specific | 1 | VACUUM CLEANER |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.08BAA9) | Non Aqueous Cleaner-General - - |
| (Material No.14SBA1) | Textile-Lint free Cotton - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 830 | L PASSENGER/CREW DOORS & EMERGENCY EXITS |
| 840 | R PASSENGER/CREW DOORS & EMERGENCY EXITS |
| 831, 831FZ, 831GZ, 832, 832FZ, 832GZ, 841, 841FZ, 841GZ, 842, 842FZ, 842GZ |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 24-42-00-862-001-A | De-energize the Ground Service Network Supplied from the External Power |
| TASK 25-23-46-000-001-A | Removal of the Door Linings from the Forward Passenger/Crew Doors |
| TASK 25-23-46-000-002-A | Removal of the Door Linings from the Aft Passenger/Crew Doors |
| TASK 25-23-46-400-001-A | Installation of the Door Linings on the Forward Passenger/Crew Doors |
| TASK 25-23-46-400-002-A | Installation of the Door Linings on the Aft Passenger/Crew Doors |
| TASK 52-10-00-010-001-A | Opening of the Passenger/Crew Door |
| TASK 52-10-00-410-001-A | Closing of the Passenger/Crew Door |
| TASK 52-10-00-860-001-A | Special Precautions before Work on the Passenger/Crew Door |
| TASK 52-10-00-860-002-A | Special Precautions after Work on the Passenger/Crew Door |
| TASK 52-11-12-000-802-A | Removal of the FWD Passenger/Crew-Doors Gust-Lock Control-Mechanism |
| TASK 52-11-12-400-802-A | Installation of the FWD Passenger/Crew-Doors Gust-Lock Control-Mechanism |
| TASK 52-13-12-000-802-A | Removal of the Aft Passenger/Crew-Doors Gust-Lock Control-Mechanism |
| TASK 52-13-12-400-802-A | Installation of the Aft Passenger/Crew-Doors Gust-Lock Control-Mechanism |
Subtask 52-10-00-861-052-A Subtask 52-10-00-010-113-A
B. Get Access
(1) Put an ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE in front of the applicable passenger/crew doors 831(841) or 832/842).
(2) Open the passenger/crew doors 831 ( 841) or 832 ( 842) (Ref. AMM TASK 52-10-00-010-001).
(3) Do the steps given in the special precautions task before you start work on the door (Ref. AMM TASK 52-10-00-860-001).
(4) Remove the linings from the support arms:
(a) For the forward passenger/crew doors (Ref. AMM TASK 25-23-46-000-001):
(b) For the aft passenger/crew doors (Ref. AMM TASK 25-23-46-000-002):
Subtask 52-10-00-020-071-A (1) Put an ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE in front of the applicable passenger/crew doors 831(841) or 832/842).
(2) Open the passenger/crew doors 831 ( 841) or 832 ( 842) (Ref. AMM TASK 52-10-00-010-001).
(3) Do the steps given in the special precautions task before you start work on the door (Ref. AMM TASK 52-10-00-860-001).
(4) Remove the linings from the support arms:
(a) For the forward passenger/crew doors (Ref. AMM TASK 25-23-46-000-001):
(b) For the aft passenger/crew doors (Ref. AMM TASK 25-23-46-000-002):
C. Removal of Components
(1) Remove the rods of the door unlocking-mechanism assembly for cleaning:
4. Procedure(1) Remove the rods of the door unlocking-mechanism assembly for cleaning:
- For the forward door: (Ref. AMM TASK 52-11-12-000-802)
- For the aft door: (Ref. AMM TASK 52-13-12-000-802).
Subtask 52-10-00-160-050-A
A. Cleaning of the Gust-Lock Control-Mechanism
(1) Make sure that the mechanism is in correct condition.
(2) Make sure that there is no lubricant or Temporary Protection System (TPS) on the rods.
(3) If there is contamination of the rods, replace the nylon bushes:
(5) Remove all loose particles and dirt with a VACUUM CLEANER and/or a dry BRUSH - BRISTLED from:
5. Close-up(1) Make sure that the mechanism is in correct condition.
(2) Make sure that there is no lubricant or Temporary Protection System (TPS) on the rods.
(3) If there is contamination of the rods, replace the nylon bushes:
- For the forward door: (Ref. AMM TASK 52-11-12-000-802) and (Ref. AMM TASK 52-11-12-400-802)
- For the aft door: (Ref. AMM TASK 52-13-12-000-802) and (Ref. AMM TASK 52-13-12-400-802).
- The primary rod
- The secondary rod
- The transfer beam.
(5) Remove all loose particles and dirt with a VACUUM CLEANER and/or a dry BRUSH - BRISTLED from:
- The lock unit
- The door unlocking pushbutton-switch.
Subtask 52-10-00-420-069-A
A. Installation of Components
(1) Install the rods of the door unlocking-mechanism assembly:
Subtask 52-10-00-410-121-A (1) Install the rods of the door unlocking-mechanism assembly:
- For the forward door: (Ref. AMM TASK 52-11-12-400-802)
- For the aft door: (Ref. AMM TASK 52-13-12-400-802).
B. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the linings on the support arms.
(a) For the forward passenger/crew doors (Ref. AMM TASK 25-23-46-400-001):
(b) For the aft passenger/crew doors (Ref. AMM TASK 25-23-46-400-002):
(3) Do the steps given in the special precautions task on the passenger/crew door after the maintenance (Ref. AMM TASK 52-10-00-860-002).
(4) Close the passenger/crew doors 831 ( 841) and 832 ( 842) (Ref. AMM TASK 52-10-00-410-001).
(5) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
Subtask 52-10-00-862-052-A (1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the linings on the support arms.
(a) For the forward passenger/crew doors (Ref. AMM TASK 25-23-46-400-001):
(b) For the aft passenger/crew doors (Ref. AMM TASK 25-23-46-400-002):
(3) Do the steps given in the special precautions task on the passenger/crew door after the maintenance (Ref. AMM TASK 52-10-00-860-002).
(4) Close the passenger/crew doors 831 ( 841) and 832 ( 842) (Ref. AMM TASK 52-10-00-410-001).
(5) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
Gust-Lock Control-Mechanism