Removal of the Electronic Control Box (ECB) (APS 3200)
TASK 49-61-34-000-002-A
Removal of the Electronic Control Box (ECB) (APS 3200)
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 49-61-34-860-051-C ** ON A/C NOT FOR ALL
Subtask 49-61-34-020-051-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 01:31:41 UTC
Removal of the Electronic Control Box (ECB) (APS 3200)
FIN: 59KD ** ON A/C NOT FOR ALL
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) |
| No specific | AR | CAP - BLANKING |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 162EW |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 25-55-12-000-003-A | Removal of the Sidewall Panels in the Aft Cargo Compartment - FR59/FR65 |
| TASK 31-36-00-740-015-A | Printout of the Engine/APU Hours and Cycles Stored in the Flight Data Interface and Management Unit (FDIMU) |
| TASK 52-30-00-860-006-A | Open the Bulk Cargo-Compartment Door |
Subtask 49-61-34-860-051-C ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration.
(1) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
(2) Put a warning notice in the cockpit to tell persons not to start the APU.
(3) Do a record of the APU HOURS and CYCLES (Ref. AMM TASK 31-36-00-740-015).
Subtask 49-61-34-865-058-A ** ON A/C NOT FOR ALL (1) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
(2) Put a warning notice in the cockpit to tell persons not to start the APU.
(3) Do a record of the APU HOURS and CYCLES (Ref. AMM TASK 31-36-00-740-015).
B. Open, safety and tag this(these) circuit breaker(s):
Subtask 49-61-34-010-056-B ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | APU/APU/CTL | 2KD | L42 |
| 121VU | APU/ECB/SPLY | 1KD | L41 |
C. Get Access
(1) Open the BULK cargo-compartment door 827 (Ref. AMM TASK 52-30-00-860-006).
(2) Put the ACCESS PLATFORM 2M (6 FT) at the BULK cargo-compartment door 827.
(3) Remove the access panel 162EW (Ref. AMM TASK 25-55-12-000-003).
4. Procedure(1) Open the BULK cargo-compartment door 827 (Ref. AMM TASK 52-30-00-860-006).
(2) Put the ACCESS PLATFORM 2M (6 FT) at the BULK cargo-compartment door 827.
(3) Remove the access panel 162EW (Ref. AMM TASK 25-55-12-000-003).
Subtask 49-61-34-020-051-A ** ON A/C NOT FOR ALL
A. Remove the ECB
(3) Remove the ECB (3) from the tray (1).
(4) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
WARNING:
SUPPORT THE UNIT/ASSEMBLY. THE UNIT/ASSEMBLY IS HEAVY. IF YOU DO NOT SUPPORT IT, IT WILL FALL. THIS CAN CAUSE INJURY TO PERSONS, AND/OR DAMAGE TO EQUIPMENT.
(1) At the ECB tray (1) turn the fluted knobs (2) counterclockwise to release the electronic control box (3). NOTE: The ECB installation points forward in those aircraft that do not have the optional bulk cargo door. Aircraft with the optional bulk cargo door, have the ECB installation pointed rearwards.
(2) Carefully pull the ECB (3) from the tray (1) to disconnect the electrical connection (4). (3) Remove the ECB (3) from the tray (1).
(4) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
ECB - Removal/Installation