W DOC AIRBUS | AMM A320F

Reactivation of the APU after Removal of APU Substitution Kit (131-9(A))


TASK 49-10-00-440-007-A-01
Reactivation of the APU after Removal of APU Substitution Kit (131-9(A))


FIN: 4005KM ** ON A/C NOT FOR ALL
1. Reason for the Job
MMEL 49-10-01C
POWER PLANT (APU)
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
WARNING NOTICE(S)
 B. Referenced Information
REFERENCE
DESIGNATION
TASK 49-11-00-000-005-A
Removal of the APU Substitution Kit (131-9(A))
TASK 49-11-11-400-004-A
Installation of the Power Plant (APU) (131-9(A))
3. Job Set-up
Subtask 49-10-00-860-088-A ** ON A/C NOT FOR ALL
A. Not applicable
4. Procedure
Subtask 49-10-00-440-060-A ** ON A/C NOT FOR ALL
A. Reactivation of the APU
   (1) Remove the APU Substitution Kit (Ref. AMM TASK 49-11-00-000-005).
   (2) Install a new APU (Ref. AMM TASK 49-11-11-400-004).
   (3) Remove the WARNING NOTICE(S) 'APU INOP'.
5. Close-up
Subtask 49-10-00-860-089-A ** ON A/C NOT FOR ALL
A. Make an entry in the technical logbook that the APU is re-activated.
[Rev.10 from 2021] 2026.04.01 01:26:33 UTC