Installation of the NEA Line on the Outside of the Fuel Center Tank
TASK 47-20-49-400-805-A
Installation of the NEA Line on the Outside of the Fuel Center Tank
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Referenced Information
3. Job Set-up
Subtask 47-20-49-941-057-A ** ON A/C NOT FOR ALL
Subtask 47-20-49-420-052-A ** ON A/C NOT FOR ALL
Subtask 47-20-49-410-052-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.02 06:26:19 UTC
Installation of the NEA Line on the Outside of the Fuel Center Tank
WARNING:
YOU MUST OBEY ALL THE SAFETY PROCEDURES WHEN YOU DO WORK IN OR NEAR THE FUEL TANK.
IF YOU DO NOT OBEY THE SAFETY PROCEDURES, THERE IS A RISK OF:
- DEATH OR INJURY TO PERSONS
- DAMAGE TO THE AIRCRAFT OR OTHER EQUIPMENT.
ZONE: 137
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.04TMB2) | Varnish-- Electrical Bonding Structure |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 137 | BAY BETW AFT PART. BULKHEAD OF FWD CARGO |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 20-21-11-911-001-A | Tightening Torques for Standard Threaded Fasteners |
| TASK 20-28-00-912-802-A | Electrical Bonding - General Maintenance Procedure |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 25-54-12-000-001-A | Removal of the Forward Cargo-Compartment Partition |
| TASK 25-54-12-400-001-A | Installation of the Forward Cargo-Compartment Partition |
| TASK 53-32-12-000-002-A | Removal of the Cabin Floor Panels |
| TASK 53-32-12-400-002-A | Installation of the Cabin Floor Panels |
| TASK 06-41-53-00 | FUSELAGE-DESCRIPTION AND OPERATION |
Subtask 47-20-49-941-057-A ** ON A/C NOT FOR ALL
A. Safety Precautions
Subtask 47-20-49-860-059-A ** ON A/C NOT FOR ALL WARNING:
BEFORE YOU DO WORK IN OR NEAR A FUEL TANK, MAKE SURE THAT YOU OBEY ALL THE SAFETY PROCEDURES. THIS WILL PREVENT INJURY TO PERSONS AND/OR DAMAGE TO THE AIRCRAFT.
(1) Put the SAFETY BARRIER(S) in position. B. Aircraft Maintenance Configuration
(1) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
Subtask 47-20-49-865-059-A ** ON A/C NOT FOR ALL (1) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
C. Open, safety and tag this(these) circuit breaker(s):
Subtask 47-20-49-010-057-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | IGGS/CTRL | 7YA | N28 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | IGGS/CTRL | 7YA | P28 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | CSAS / CTRL | 1HW | U17 |
D. Get Access
(1) Make sure that the cabin-floor access panels between FR35 and FR42 are removed (Ref. AMM TASK 53-32-12-000-002) (Ref. AMM D/O 06-41-53-00).
(2) Make sure that the forward cargo-compartment partition-panels at FR34 are removed (Ref. AMM TASK 25-54-12-000-001) (Ref. AMM D/O 06-41-53-00).
4. Procedure(1) Make sure that the cabin-floor access panels between FR35 and FR42 are removed (Ref. AMM TASK 53-32-12-000-002) (Ref. AMM D/O 06-41-53-00).
(2) Make sure that the forward cargo-compartment partition-panels at FR34 are removed (Ref. AMM TASK 25-54-12-000-001) (Ref. AMM D/O 06-41-53-00).
Subtask 47-20-49-420-052-A ** ON A/C NOT FOR ALL
A. Installation of the NEA line
(a) Remove CAP - BLANKING from the disconnected pipe ends.
(b) Install the elbow (128) on the dual-flapper check valve adapter (130) and tighten the nut (129).
(c) TORQUE the nut (129) to between 7.40 and 7.29 m.daN (54.57 and 53.76 lbf.ft )
.
(d) Make sure that the flexible NEA hose (4) is free from damage.
(e) Install the flexible NEA hose (4) on the elbow (128) and tighten the nut (127).
(f) TORQUE the nut (127) to between 5.3 and 5.2 m.daN (39.09 and 38.35 lbf.ft )
.
(2) To install the NEA pipe (3):
(a) Remove CAP - BLANKING from the disconnected pipe ends.
(b) Install the clamp (124) on the support brackets (115) with the bolts (122) and the washers (123).
(c) Tighten the bolts (122) (Ref. AMM TASK 20-21-11-911-001).
(d) Install the flexible NEA hose (4) on the union (125) and tighten the nut (126).
.
(f) Attach the bonding lead (118) to the clamp (119) with the screw (116) and the washer (117) (Ref. AMM TASK 20-28-00-912-802).
(g) Install the washer (120) and the self-locking nut (121) on the clamp (119).
(h) TORQUE the self-locking nut (121) to between 0.48 and 0.37 m.daN (42.48 and 32.74 lbf.in )
.
(i) Apply Varnish-- Electrical Bonding Structure (Material No.04TMB2) on the screw (116) and the self-locking nut (121).
(j) Attach the bonding leads (83) to the clamps (80), (81) with the screws (79) and the washers (78) (Ref. AMM TASK 20-28-00-912-802).
(k) Install the washers (77) and the self-locking nuts (76) on the clamps (80) and (81).
(l) TORQUE the self-locking nuts (76) to between 0.48 and 0.37 m.daN (42.48 and 32.74 lbf.in )
.
(m) Apply Varnish-- Electrical Bonding Structure (Material No.04TMB2) on the screws (79) and the self-locking nuts (76).
(3) To install the NEA pipe (2):
(a) Remove CAP - BLANKING from the disconnected pipe ends.
(b) Install the clamps (73), (91) on the support brackets (72), (94) with the bolts (75), (90) and the washers (74), (89).
(c) Tighten the bolts (90) and (75) (Ref. AMM TASK 20-21-11-911-001).
(e) TORQUE the nut (82) to between 6.2 and 5.2 m.daN (45.72 and 38.35 lbf.ft )
.
(f) Attach the bonding leads (83) to the clamps (88), (92) with the screws (84) and the washers (85) (Ref. AMM TASK 20-28-00-912-802).
(g) Install the washers (87) and the self-locking nuts (86) on the clamps (88) and (92).
(h) TORQUE the self-locking nuts (86) to between 0.48 and 0.37 m.daN (42.48 and 32.74 lbf.in )
.
(i) Apply Varnish-- Electrical Bonding Structure (Material No.04TMB2) on the screws (84) and the self-locking nuts (86).
(j) Attach the bonding leads (44) to the clamps (50), (51) with the screws (48) and the washers (49) (Ref. AMM TASK 20-28-00-912-802).
(k) Install the washers (47) and the self-locking nuts (46) on the clamps (50) and (51).
(l) TORQUE the self-locking nuts (46) to between 0.48 and 0.37 m.daN (42.48 and 32.74 lbf.in )
.
(m) Apply Varnish-- Electrical Bonding Structure (Material No.04TMB2) on the screws (48) and the self-locking nuts (46).
(4) To install the NEA pipe (1):
(a) Remove CAP - BLANKING from the disconnected pipe ends.
(b) Install the clamps (30), (24) on the support brackets (28), (25) with the bolts (37), (20) and the washers (36), (21).
(c) Tighten the bolts (37) and (20) (Ref. AMM TASK 20-21-11-911-001).
(d) Install the NEA pipe (2) on the union (45) and tighten the nut (52).
(e) TORQUE the nut (52) to between 6.2 and 5.2 m.daN (45.72 and 38.35 lbf.ft )
.
(f) Install NEA pipe (1) on the union (27) and tighten the nut (16).
(g) TORQUE the nut (16) to between 6.2 and 5.2 m.daN (45.72 and 38.35 lbf.ft )
.
(h) Attach the bonding leads (44) to the clamps (40), (43) with the screws (41) and the washers (42) (Ref. AMM TASK 20-28-00-912-802).
(i) Install the washers (39) and the self-locking nuts (38) on the clamps (40) and (43).
(j) TORQUE the self-locking nuts (38) to between 0.48 and 0.37 m.daN (42.48 and 32.74 lbf.in )
.
(k) Apply Varnish-- Electrical Bonding Structure (Material No.04TMB2) on the screws (41) and the self-locking nuts (38).
(l) Attach the bonding lead (35) to the clamp (32) with the screw (34) and the washer (33) (Ref. AMM TASK 20-28-00-912-802).
(m) Install the washer (31) and the self-locking nut (29) on the clamp (32).
(n) TORQUE the self-locking nut (29) to between 0.48 and 0.37 m.daN (42.48 and 32.74 lbf.in )
.
(o) Apply Varnish-- Electrical Bonding Structure (Material No.04TMB2) on the screw (34) and the self-locking nut (29).
(p) Attach the bonding leads (15) to the clamps (17), (26) with the screws (22) and the washers (23) (Ref. AMM TASK 20-28-00-912-802).
(q) Install the washers (18) and the self-locking nuts (19) on the clamps (17) and (26).
(r) TORQUE the self-locking nuts (19) to between 0.48 and 0.37 m.daN (42.48 and 32.74 lbf.in )
.
(s) Apply Varnish-- Electrical Bonding Structure (Material No.04TMB2) on the screws (22) and the self-locking nuts (19).
(5) Do a check of the bonding (Ref. AMM TASK 20-28-00-912-802).
Subtask 47-20-49-865-060-A ** ON A/C NOT FOR ALL NOTE: Two persons are necessary to do this procedure.
(1) To install the Flexible NEA Hose (4): (a) Remove CAP - BLANKING from the disconnected pipe ends.
(b) Install the elbow (128) on the dual-flapper check valve adapter (130) and tighten the nut (129).
(c) TORQUE the nut (129) to between 7.40 and 7.29 m.daN (54.57 and 53.76 lbf.ft )
. (d) Make sure that the flexible NEA hose (4) is free from damage.
(e) Install the flexible NEA hose (4) on the elbow (128) and tighten the nut (127).
(f) TORQUE the nut (127) to between 5.3 and 5.2 m.daN (39.09 and 38.35 lbf.ft )
. (2) To install the NEA pipe (3):
(a) Remove CAP - BLANKING from the disconnected pipe ends.
(b) Install the clamp (124) on the support brackets (115) with the bolts (122) and the washers (123).
(c) Tighten the bolts (122) (Ref. AMM TASK 20-21-11-911-001).
(d) Install the flexible NEA hose (4) on the union (125) and tighten the nut (126).
NOTE: The clearance between the hose (4) and the surrounding structure and systems must not be less than 25 mm (0.984 in.).
(e) TORQUE the nut (126) to between 5.3 and 5.2 m.daN (39.09 and 38.35 lbf.ft )
. (f) Attach the bonding lead (118) to the clamp (119) with the screw (116) and the washer (117) (Ref. AMM TASK 20-28-00-912-802).
(g) Install the washer (120) and the self-locking nut (121) on the clamp (119).
(h) TORQUE the self-locking nut (121) to between 0.48 and 0.37 m.daN (42.48 and 32.74 lbf.in )
. (i) Apply Varnish-- Electrical Bonding Structure (Material No.04TMB2) on the screw (116) and the self-locking nut (121).
(j) Attach the bonding leads (83) to the clamps (80), (81) with the screws (79) and the washers (78) (Ref. AMM TASK 20-28-00-912-802).
(k) Install the washers (77) and the self-locking nuts (76) on the clamps (80) and (81).
(l) TORQUE the self-locking nuts (76) to between 0.48 and 0.37 m.daN (42.48 and 32.74 lbf.in )
. (m) Apply Varnish-- Electrical Bonding Structure (Material No.04TMB2) on the screws (79) and the self-locking nuts (76).
(3) To install the NEA pipe (2):
(a) Remove CAP - BLANKING from the disconnected pipe ends.
(b) Install the clamps (73), (91) on the support brackets (72), (94) with the bolts (75), (90) and the washers (74), (89).
(c) Tighten the bolts (90) and (75) (Ref. AMM TASK 20-21-11-911-001).
NOTE: The distance between the NEA pipe (2) and the trim air regulating valves must not be less than 50 mm (1.969 in.).
(d) Install the NEA pipe (3) on the union (93) and tighten the nut (82). (e) TORQUE the nut (82) to between 6.2 and 5.2 m.daN (45.72 and 38.35 lbf.ft )
. (f) Attach the bonding leads (83) to the clamps (88), (92) with the screws (84) and the washers (85) (Ref. AMM TASK 20-28-00-912-802).
(g) Install the washers (87) and the self-locking nuts (86) on the clamps (88) and (92).
(h) TORQUE the self-locking nuts (86) to between 0.48 and 0.37 m.daN (42.48 and 32.74 lbf.in )
. (i) Apply Varnish-- Electrical Bonding Structure (Material No.04TMB2) on the screws (84) and the self-locking nuts (86).
(j) Attach the bonding leads (44) to the clamps (50), (51) with the screws (48) and the washers (49) (Ref. AMM TASK 20-28-00-912-802).
(k) Install the washers (47) and the self-locking nuts (46) on the clamps (50) and (51).
(l) TORQUE the self-locking nuts (46) to between 0.48 and 0.37 m.daN (42.48 and 32.74 lbf.in )
. (m) Apply Varnish-- Electrical Bonding Structure (Material No.04TMB2) on the screws (48) and the self-locking nuts (46).
(4) To install the NEA pipe (1):
(a) Remove CAP - BLANKING from the disconnected pipe ends.
(b) Install the clamps (30), (24) on the support brackets (28), (25) with the bolts (37), (20) and the washers (36), (21).
(c) Tighten the bolts (37) and (20) (Ref. AMM TASK 20-21-11-911-001).
(d) Install the NEA pipe (2) on the union (45) and tighten the nut (52).
(e) TORQUE the nut (52) to between 6.2 and 5.2 m.daN (45.72 and 38.35 lbf.ft )
. (f) Install NEA pipe (1) on the union (27) and tighten the nut (16).
(g) TORQUE the nut (16) to between 6.2 and 5.2 m.daN (45.72 and 38.35 lbf.ft )
. (h) Attach the bonding leads (44) to the clamps (40), (43) with the screws (41) and the washers (42) (Ref. AMM TASK 20-28-00-912-802).
(i) Install the washers (39) and the self-locking nuts (38) on the clamps (40) and (43).
(j) TORQUE the self-locking nuts (38) to between 0.48 and 0.37 m.daN (42.48 and 32.74 lbf.in )
. (k) Apply Varnish-- Electrical Bonding Structure (Material No.04TMB2) on the screws (41) and the self-locking nuts (38).
(l) Attach the bonding lead (35) to the clamp (32) with the screw (34) and the washer (33) (Ref. AMM TASK 20-28-00-912-802).
(m) Install the washer (31) and the self-locking nut (29) on the clamp (32).
(n) TORQUE the self-locking nut (29) to between 0.48 and 0.37 m.daN (42.48 and 32.74 lbf.in )
. (o) Apply Varnish-- Electrical Bonding Structure (Material No.04TMB2) on the screw (34) and the self-locking nut (29).
(p) Attach the bonding leads (15) to the clamps (17), (26) with the screws (22) and the washers (23) (Ref. AMM TASK 20-28-00-912-802).
(q) Install the washers (18) and the self-locking nuts (19) on the clamps (17) and (26).
(r) TORQUE the self-locking nuts (19) to between 0.48 and 0.37 m.daN (42.48 and 32.74 lbf.in )
. (s) Apply Varnish-- Electrical Bonding Structure (Material No.04TMB2) on the screws (22) and the self-locking nuts (19).
(5) Do a check of the bonding (Ref. AMM TASK 20-28-00-912-802).
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
5. Close-up| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | IGGS/CTRL | 7YA | N28 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | IGGS/CTRL | 7YA | P28 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | CSAS / CTRL | 1HW | U17 |
Subtask 47-20-49-410-052-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the cabin-floor access panels (Ref. AMM TASK 53-32-12-400-002) (Ref. AMM D/O 06-41-53-00).
(3) Install the forward cargo-compartment partition-panels (Ref. AMM TASK 25-54-12-400-001) (Ref. AMM D/O 06-41-53-00).
Subtask 47-20-49-942-052-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the cabin-floor access panels (Ref. AMM TASK 53-32-12-400-002) (Ref. AMM D/O 06-41-53-00).
(3) Install the forward cargo-compartment partition-panels (Ref. AMM TASK 25-54-12-400-001) (Ref. AMM D/O 06-41-53-00).
B. Removal of Equipment
(1) Remove the SAFETY BARRIER(S).
(2) Remove all the fixtures, tools, test and support equipments used during this procedure.
(1) Remove the SAFETY BARRIER(S).
(2) Remove all the fixtures, tools, test and support equipments used during this procedure.
NEA line on the Outside of the Fuel Center Tank