W DOC AIRBUS | AMM A320F

Installation of the NEA Line in the Bay between the FWD Cargo Compartment and the FWD Pressure Bulkhead of the Center Wing Box


TASK 47-20-49-400-804-A
Installation of the NEA Line in the Bay between the FWD Cargo Compartment and the FWD Pressure Bulkhead of the Center Wing Box


WARNING: YOU MUST OBEY ALL THE SAFETY PROCEDURES WHEN YOU DO WORK IN OR NEAR THE FUEL TANK. IF YOU DO NOT OBEY THE SAFETY PROCEDURES, THERE IS A RISK OF:
  • DEATH OR INJURY TO PERSONS
  • DAMAGE TO THE AIRCRAFT OR OTHER EQUIPMENT.
ZONE: 137
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
PLUG - BLANKING
No specific
AR
SAFETY BARRIER(S)
No specific
Torque wrench: range to between 0.48 and 0.37 m.daN (42.48 and 32.74 lbf.in ) T
No specific
Torque wrench: range to between 5.3 and 5.2 m.daN (39.09 and 38.35 lbf.ft ) T
No specific
Torque wrench: range to between 6.2 and 5.2 m.daN (45.72 and 38.35 lbf.ft ) T
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.04TMB2)
Varnish-- Electrical Bonding Structure
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
137
BAY BETW AFT PART. BULKHEAD OF FWD CARGO
 D. Referenced Information
REFERENCE
DESIGNATION
TASK 20-21-11-911-001-A
Tightening Torques for Standard Threaded Fasteners
TASK 20-28-00-912-802-A
Electrical Bonding - General Maintenance Procedure
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 24-41-00-862-002-A-02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
TASK 25-54-12-000-001-A
Removal of the Forward Cargo-Compartment Partition
TASK 25-54-12-400-001-A
Installation of the Forward Cargo-Compartment Partition
TASK 06-41-53-00
FUSELAGE-DESCRIPTION AND OPERATION
3. Job Set-up
Subtask 47-20-49-941-053-A ** ON A/C NOT FOR ALL
A. Safety Precautions
WARNING: BEFORE YOU DO WORK IN OR NEAR A FUEL TANK, MAKE SURE THAT YOU OBEY ALL THE SAFETY PROCEDURES. THIS WILL PREVENT INJURY TO PERSONS AND/OR DAMAGE TO THE AIRCRAFT.
   (1) Put the SAFETY BARRIER(S) in position.
Subtask 47-20-49-860-052-A ** ON A/C NOT FOR ALL
B. Aircraft Maintenance Configuration
   (1) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
Subtask 47-20-49-865-054-A ** ON A/C NOT FOR ALL
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
121VUIGGS/CTRL7YAN28
** ON A/C NOT FOR ALL
121VUIGGS/CTRL7YAP28
** ON A/C NOT FOR ALL
122VUCSAS / CTRL1HWU17
Subtask 47-20-49-010-052-A ** ON A/C NOT FOR ALL
D. Get Access
   (1) Make sure that the forward cargo-compartment partition-panels at FR34 are removed (Ref. AMM TASK 25-54-12-000-001) (Ref. AMM D/O 06-41-53-00).
4. Procedure
Subtask 47-20-49-420-050-A ** ON A/C NOT FOR ALL
A. Installation of NEA line
   (1) To install the NEA pipe (1):
     (a) Remove PLUG - BLANKING from the disconnected pipe ends and bulkhead fitting.
     (b) Install the clamp (34) on the support bracket (35) with the bolts (32) and the washers (33).
     (c) Tighten the bolts (32) (Ref. AMM TASK 20-21-11-911-001).
     (d) Install the NEA pipe (1) to the NEA pipe (2) with the nut (36).
     (e) TORQUE the nut (36) to between 6.2 and 5.2 m.daN (45.72 and 38.35 lbf.ft ) T.
     (f) Install the NEA pipe (1) to the bulkhead fitting (12) with the nut (11).
     (g) TORQUE the nut (11) to between 5.3 and 5.2 m.daN (39.09 and 38.35 lbf.ft )
T.
     (h) Attach the bonding leads (37) to the clamps (42) and (43) with the screws (39) and the washers (38) (
Ref. AMM TASK 20-28-00-912-802).
     (i) Install the washers (41) and self-locking nuts (40) on the clamps (42) and (43) and tighten the nuts (40).
     (j) TORQUE the self-locking nuts (40) to between 0.48 and 0.37 m.daN (42.48 and 32.74 lbf.in ) T.
     (k) Apply Varnish-- Electrical Bonding Structure (Material No.
04TMB2) on the screws (39) and the self-locking nuts (40).
     (l) Attach the bonding lead (10) to the clamp (7) with the screw (9) and the washer (8) (Ref. AMM TASK 20-28-00-912-802).
     (m) Install the washer (6) and self-locking nut (5) on the clamp (7) and tighten the nut (5).
     (n) TORQUE the nut (5) to between 0.48 and 0.37 m.daN (42.48 and 32.74 lbf.in ) T.
     (o) Apply Varnish-- Electrical Bonding Structure (Material No.
04TMB2) on the screw (9) and the self-locking nut (5).
   (2) Do a check of the bonding (Ref. AMM TASK 20-28-00-912-802).
Subtask 47-20-49-865-052-A ** ON A/C NOT FOR ALL
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
121VUIGGS/CTRL7YAN28
** ON A/C NOT FOR ALL
121VUIGGS/CTRL7YAP28
** ON A/C NOT FOR ALL
122VUCSAS / CTRL1HWU17
5. Close-up
Subtask 47-20-49-410-050-A ** ON A/C NOT FOR ALL
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Install the forward cargo-compartment partition-panels at FR34 (Ref. AMM TASK 25-54-12-400-001) (Ref. AMM D/O 06-41-53-00).
Subtask 47-20-49-942-050-A ** ON A/C NOT FOR ALL
B. Removal of Equipment
   (1) Remove the SAFETY BARRIER(S).
   (2) Remove all the fixtures, tools, test and support equipment used during this procedure.
[Rev.10 from 2021] 2026.04.02 06:26:19 UTC