Installation of the NEA Line in the Bay between the FWD Cargo Compartment and the FWD Pressure Bulkhead of the Center Wing Box
TASK 47-20-49-400-804-A
Installation of the NEA Line in the Bay between the FWD Cargo Compartment and the FWD Pressure Bulkhead of the Center Wing Box
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Referenced Information
3. Job Set-up
Subtask 47-20-49-941-053-A ** ON A/C NOT FOR ALL
Subtask 47-20-49-420-050-A ** ON A/C NOT FOR ALL
Subtask 47-20-49-410-050-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.02 06:26:19 UTC
Installation of the NEA Line in the Bay between the FWD Cargo Compartment and the FWD Pressure Bulkhead of the Center Wing Box
WARNING:
YOU MUST OBEY ALL THE SAFETY PROCEDURES WHEN YOU DO WORK IN OR NEAR THE FUEL TANK.
IF YOU DO NOT OBEY THE SAFETY PROCEDURES, THERE IS A RISK OF:
- DEATH OR INJURY TO PERSONS
- DAMAGE TO THE AIRCRAFT OR OTHER EQUIPMENT.
ZONE: 137
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.04TMB2) | Varnish-- Electrical Bonding Structure |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 137 | BAY BETW AFT PART. BULKHEAD OF FWD CARGO |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 20-21-11-911-001-A | Tightening Torques for Standard Threaded Fasteners |
| TASK 20-28-00-912-802-A | Electrical Bonding - General Maintenance Procedure |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 25-54-12-000-001-A | Removal of the Forward Cargo-Compartment Partition |
| TASK 25-54-12-400-001-A | Installation of the Forward Cargo-Compartment Partition |
| TASK 06-41-53-00 | FUSELAGE-DESCRIPTION AND OPERATION |
Subtask 47-20-49-941-053-A ** ON A/C NOT FOR ALL
A. Safety Precautions
Subtask 47-20-49-860-052-A ** ON A/C NOT FOR ALL WARNING:
BEFORE YOU DO WORK IN OR NEAR A FUEL TANK, MAKE SURE THAT YOU OBEY ALL THE SAFETY PROCEDURES. THIS WILL PREVENT INJURY TO PERSONS AND/OR DAMAGE TO THE AIRCRAFT.
(1) Put the SAFETY BARRIER(S) in position. B. Aircraft Maintenance Configuration
(1) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
Subtask 47-20-49-865-054-A ** ON A/C NOT FOR ALL (1) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
Subtask 47-20-49-010-052-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | IGGS/CTRL | 7YA | N28 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | IGGS/CTRL | 7YA | P28 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | CSAS / CTRL | 1HW | U17 |
D. Get Access
(1) Make sure that the forward cargo-compartment partition-panels at FR34 are removed (Ref. AMM TASK 25-54-12-000-001) (Ref. AMM D/O 06-41-53-00).
4. Procedure(1) Make sure that the forward cargo-compartment partition-panels at FR34 are removed (Ref. AMM TASK 25-54-12-000-001) (Ref. AMM D/O 06-41-53-00).
Subtask 47-20-49-420-050-A ** ON A/C NOT FOR ALL
A. Installation of NEA line
(1) To install the NEA pipe (1):
(a) Remove PLUG - BLANKING from the disconnected pipe ends and bulkhead fitting.
(b) Install the clamp (34) on the support bracket (35) with the bolts (32) and the washers (33).
(c) Tighten the bolts (32) (Ref. AMM TASK 20-21-11-911-001).
(d) Install the NEA pipe (1) to the NEA pipe (2) with the nut (36).
(e) TORQUE the nut (36) to between 6.2 and 5.2 m.daN (45.72 and 38.35 lbf.ft )
.
(f) Install the NEA pipe (1) to the bulkhead fitting (12) with the nut (11).
(g) TORQUE the nut (11) to between 5.3 and 5.2 m.daN (39.09 and 38.35 lbf.ft )
.
(h) Attach the bonding leads (37) to the clamps (42) and (43) with the screws (39) and the washers (38) (Ref. AMM TASK 20-28-00-912-802).
(i) Install the washers (41) and self-locking nuts (40) on the clamps (42) and (43) and tighten the nuts (40).
(j) TORQUE the self-locking nuts (40) to between 0.48 and 0.37 m.daN (42.48 and 32.74 lbf.in )
.
(k) Apply Varnish-- Electrical Bonding Structure (Material No.04TMB2) on the screws (39) and the self-locking nuts (40).
(l) Attach the bonding lead (10) to the clamp (7) with the screw (9) and the washer (8) (Ref. AMM TASK 20-28-00-912-802).
(m) Install the washer (6) and self-locking nut (5) on the clamp (7) and tighten the nut (5).
(n) TORQUE the nut (5) to between 0.48 and 0.37 m.daN (42.48 and 32.74 lbf.in )
.
(o) Apply Varnish-- Electrical Bonding Structure (Material No.04TMB2) on the screw (9) and the self-locking nut (5).
(2) Do a check of the bonding (Ref. AMM TASK 20-28-00-912-802).
Subtask 47-20-49-865-052-A ** ON A/C NOT FOR ALL (1) To install the NEA pipe (1):
(a) Remove PLUG - BLANKING from the disconnected pipe ends and bulkhead fitting.
(b) Install the clamp (34) on the support bracket (35) with the bolts (32) and the washers (33).
(c) Tighten the bolts (32) (Ref. AMM TASK 20-21-11-911-001).
(d) Install the NEA pipe (1) to the NEA pipe (2) with the nut (36).
(e) TORQUE the nut (36) to between 6.2 and 5.2 m.daN (45.72 and 38.35 lbf.ft )
. (f) Install the NEA pipe (1) to the bulkhead fitting (12) with the nut (11).
(g) TORQUE the nut (11) to between 5.3 and 5.2 m.daN (39.09 and 38.35 lbf.ft )
. (h) Attach the bonding leads (37) to the clamps (42) and (43) with the screws (39) and the washers (38) (Ref. AMM TASK 20-28-00-912-802).
(i) Install the washers (41) and self-locking nuts (40) on the clamps (42) and (43) and tighten the nuts (40).
(j) TORQUE the self-locking nuts (40) to between 0.48 and 0.37 m.daN (42.48 and 32.74 lbf.in )
. (k) Apply Varnish-- Electrical Bonding Structure (Material No.04TMB2) on the screws (39) and the self-locking nuts (40).
(l) Attach the bonding lead (10) to the clamp (7) with the screw (9) and the washer (8) (Ref. AMM TASK 20-28-00-912-802).
(m) Install the washer (6) and self-locking nut (5) on the clamp (7) and tighten the nut (5).
(n) TORQUE the nut (5) to between 0.48 and 0.37 m.daN (42.48 and 32.74 lbf.in )
. (o) Apply Varnish-- Electrical Bonding Structure (Material No.04TMB2) on the screw (9) and the self-locking nut (5).
(2) Do a check of the bonding (Ref. AMM TASK 20-28-00-912-802).
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
5. Close-up| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | IGGS/CTRL | 7YA | N28 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | IGGS/CTRL | 7YA | P28 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | CSAS / CTRL | 1HW | U17 |
Subtask 47-20-49-410-050-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the forward cargo-compartment partition-panels at FR34 (Ref. AMM TASK 25-54-12-400-001) (Ref. AMM D/O 06-41-53-00).
Subtask 47-20-49-942-050-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the forward cargo-compartment partition-panels at FR34 (Ref. AMM TASK 25-54-12-400-001) (Ref. AMM D/O 06-41-53-00).
B. Removal of Equipment
(1) Remove the SAFETY BARRIER(S).
(2) Remove all the fixtures, tools, test and support equipment used during this procedure.
(1) Remove the SAFETY BARRIER(S).
(2) Remove all the fixtures, tools, test and support equipment used during this procedure.
NEA Line in the Bay between the FWD Cargo Compartment and the FWD Pressure Bulkhead of the Center Wing Box